PERT/CPM

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
 
'''Introduction'''
 
'''Introduction'''
 +
 
Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) are two methodologies based on the same philosophy. The result of this assumption is both these methodologies to be considered as a single method.
 
Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) are two methodologies based on the same philosophy. The result of this assumption is both these methodologies to be considered as a single method.
 
In this article which is an assignment for the course Advanced Engineering Project, Program and Portfolio Management of Technical University of Denmark, initially the history is going to be recorded. Then, the chapter of application will follow. In the same section an example will be provided to make more meaningful the section of application. The chapter of advantages comes next while the limitations follow. The article will close with references to related articles of the same assignment which are considered to be related to the topic of the current article and references which were used for this article to be written.
 
In this article which is an assignment for the course Advanced Engineering Project, Program and Portfolio Management of Technical University of Denmark, initially the history is going to be recorded. Then, the chapter of application will follow. In the same section an example will be provided to make more meaningful the section of application. The chapter of advantages comes next while the limitations follow. The article will close with references to related articles of the same assignment which are considered to be related to the topic of the current article and references which were used for this article to be written.

Revision as of 03:05, 3 October 2015

Introduction

Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) are two methodologies based on the same philosophy. The result of this assumption is both these methodologies to be considered as a single method. In this article which is an assignment for the course Advanced Engineering Project, Program and Portfolio Management of Technical University of Denmark, initially the history is going to be recorded. Then, the chapter of application will follow. In the same section an example will be provided to make more meaningful the section of application. The chapter of advantages comes next while the limitations follow. The article will close with references to related articles of the same assignment which are considered to be related to the topic of the current article and references which were used for this article to be written.

Contents

History

Application

Project planning under uncertainty

Program review and time compression

Example

Exercise

Solution

Usage

Discussion

Advantages

Limitations

Related Articles

References

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox