Prefabricated houses (industrial process)

From apppm
Revision as of 13:44, 12 February 2019 by Dilan Casablanca (Talk | contribs)

Jump to: navigation, search

Contents

Summary

The article focuses on the production of [1]prefabricated houses, and on the innovation that this process can produce into the real estate market. In the past years, the most common method of building housing was the on-site method. The construction process starts with a project, which is developed by professionals and requires a certain amount of time to be completed. Once the final project is obtained and approved, is it possible to start with the actual building phase. The process required the set up of a construction site, which costs time and a large amount of money. In the next phase, the construction operated on site, is subject to various risks that can be generated by the site in which it operates, or from unpredictable events. The manpower cost is higher, because it must be highly specialized, and it has to adapt its knowledge depending on the site and the project to be implemented. Another significant economic impact on the buildings cost is generated by the transport of materials and the mechanical vehicles, needed in the construction process. With the advance of technology and the expansion of knowledge, many companies have finalized to the conclusion that the process of houses prefabrication is more efficient than the on-site construction. The various experiences developed over the years show that this increase in efficiency (both in economic and temporal terms) is moving the building business to new frontiers.


The [2] idea is based on the Lecture which explain the meanings of: Project, program and Portfolio, showing BMW's' models. Starting from this concept, I would like to develop, using the same managing system of BMW models on the market, but applying it, to prefabricated houses and to their entire industry. This is an hard concept, both to understand and to improve, because is not common in the housing industry. There are already numerous prefabricated projects on the market, carried out by important industries in the sector. These companies are responsible for providing the customer with a complete home, built according to needs and requests. Therefore, for each individual project, the company will have to adapt its production each time according to the guidelines received. My idea, on the other hand, is based on allowing companies to mass-produce their own prefabricated houses. Once completed a comprehensive and exhaustive portfolio, customers will have to adapt their requests, depending on the products provided by the company. In this way the company can recover large sums of money by applying a series construction process that remains unchanged. At the same time you can save a lot of time, because you do not have to change the production methods.

ScandiByg

"ScandiByg" is the danish market leader in the field of industrially manufactured construction, and we are specialists in the development, production and construction of modular buildings. Over 40 years of product development has ensured us an expertise that enables us to always advise and prepare solutions that match the individual customer's wishes and requirements for a building project. Our primary business areas are construction of housing, offices, institutions and research health facilities for professional private and public customers.

Big Idea

describe the tool, concept or theory and explain its purpose. The section should reflect the current state of the art on the topic

Application

provide guidance on how to use the tool, concept or theory and when it is applicable

Limitations

critically reflect on the tool/concept/theory and its application context. What can it do, what can it not do? Under what circumstances should it be used, and when not? How does it compare to the “status quo” of the standards – is it part of it, or does it extent them? Discuss your article in the context of key readings / resources provided in class. Substantiate your claims with literature

Annotated bibliography

Provide key references (3-10), where a reader can find additional information on the subject. The article MUST make appropriate references to the and reference material provided in class – either incorporating it as a source, or critically discussing aspects that are missing from it but covered by this article. Summarize and outline the relevance of each reference to the topic (around 100 words per reference). The bibliography is not counted in the suggested 3000 word target length of the article.

Notes

  1. prefabricated houses
  2. idea



After add your abstract down in this page there is three buttons: Save page Show preview Show changes This buttons are self explanatory, but I recommend to in this first time to press the "show preview" button so you will see the initial changes in your wiki page. For more information, go to the "help" button on the left column of the page

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox