Program evaluation and review technique (PERT)

From apppm
Revision as of 16:37, 12 September 2015 by S141938 (Talk | contribs)

Jump to: navigation, search


The Program Evaluation and Review Technique (PERT) is a method used in project management for planning, scheduling and coordinating the tasks of a project. It is based on a network diagram analysis of the different tasks that are involved. PERT is specifically suited for large, complex and nonrepititive projects, since the network diagram varies in each project.

Contents

General overview

- General presentation of the method (purpose, history) - How it works more or less - Difference compared to other similar methods (CPM)

Key concepts

- Definition of the key concepts that will be used

   - Activities
   - Events
   - Network diagram and analysis
   - Critical Path

PERT has several concepts that need to be defined, to understand the concept of the method. Those are : - Activities - Events - Network diagrams - Network analysis - Critical path

The network diagrams The activities are the tasks that need to be completed. They have different durations and different prioritize in each project. On a network level, they are represented as nodes connected by arrows..

The process

- Detailed step by step presentation of the method

   - building a network diagram
   - calculation of the times
   - possible modifications

Applications and limitations

- Where is the method most useful and why - Why it cannot be used in other areas or is less efficient - Possible future ?

Bibliography