Project Scope Management

From apppm
Revision as of 12:46, 11 February 2018 by Gudmundur (Talk | contribs)

Jump to: navigation, search

Abstract

The basic concept of a project scope management is defining and controlling what is included and what is not included in the project. [1]. It is vital for a project manager to have a scope, it defines the step the needs to be taken in ordered to achieve the project goals. It includes, but is not limited to, what the end goal is, how much the whole project and every segment of it will cost, how much work it will take and when the project is supposed to be finished. [2] The following processes are the main pillars of the Project Scope Management and whole chapters will be dedicated to each process in the following article. These processes are: Plan Scope Management, Collect Requirements, Define Scope, Create Work Breakdown Structure, Validate Scope and Control Scope. The processes all connect in some way. It is also important to mention that in the project framework, it is possible to define the scope in two different ways, one way is to refer to the scope as product scope and the other ways is called project scope. [3]. The product scope refers to how a product is made while a project scope would focus more on how to deliver the service or product. A product scope could therefore be included in the project scope. [4] The scope baseline is considered as a sacred plan and is not to be changed unless it follows formal change control procedures. It is therefore important for a project manager to have a scope and manage it properly. [5].


Annotated Bibliography

Project Management Institute (2013). A Guide to the Project Management Body of Knowledge (PMBOK® guide). Newtown Square, Pennsylvania: Project Management Institute, Inc.


References

  1. Project Management Institute (2013). A Guide to the Project Management Body of Knowledge (PMBOK® guide). Newtown Square, Pennsylvania: Project Management Institute, Inc
  2. http://searchcio.techtarget.com/definition/project-scope
  3. Project Management Institute (2013). A Guide to the Project Management Body of Knowledge (PMBOK® guide). Newtown Square, Pennsylvania: Project Management Institute, Inc
  4. https://www.villanovau.com/resources/project-management/product-scope-vs-project-scope/#.WoAY7ud0ZEY
  5. Project Management Institute (2013). A Guide to the Project Management Body of Knowledge (PMBOK® guide). Newtown Square, Pennsylvania: Project Management Institute, Inc
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox