Resource allocation and crashing

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
 
Contents
 
Contents
 
1.a
 
1.a
 
+
= Becoming a user =
 
Abstract
 
Abstract
  

Revision as of 13:45, 17 February 2019

Contents 1.a

Becoming a user

Abstract

Common to all projects is the need to allocate available resources in the best possible manner. If done correctly by the project manager, she can avoid delays, penalty fees and using unnecessarily many resources on wrong events. In addition, by analyzing the possibility of crashing the project, the project manager might be able to find a more optimal solution than would be possible by the simple PERT/CPM analysis. Thus this analysis is building upon a PERT/CPM analysis.


Resource loading Resource leveling using ALAP heuristic Resource scheduling Cost-time trade off Crashing Advantages and disadvantages Crash example