Resource allocation and crashing

From apppm
Revision as of 14:09, 17 February 2019 by Wolters (Talk | contribs)

Jump to: navigation, search

Contents

Contents

Introduction

Common to all projects is the need to allocate available resources in the best possible manner. If done correctly by the project manager, she can avoid delays, penalty fees and using unnecessarily many resources on wrong events. In addition, by analyzing the possibility of crashing the project, the project manager might be able to find a more optimal solution than would be possible by the simple PERT/CPM analysis. Thus this analysis is building upon a PERT/CPM analysis.

Resource allocation

Resource loading

Resource leveling using ALAP heuristics

Resource scheduling

Crashing a project

Cost-time trade off

Conclusion

Annotated bibliography

References

[1]

  1. http://apppm.man.dtu.dk/index.php?title=Resource_allocation_and_crashing&action=edit/asd
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox