Risk Profile in Turnkey Projects

From apppm
(Difference between revisions)
Jump to: navigation, search
(Created page with "There has been a transition in the construction industry as a result of innovations in the partnering relationships between the client and the project coalition actors. Today ...")
 
Line 5: Line 5:
 
== Turnkey Projects ==
 
== Turnkey Projects ==
 
=== Definition ===
 
=== Definition ===
A turnkey project, also known as integrated coalitions or single–point responsibility, is a type of project that is constructed as a complete product for a client. (5.4.2) This type of contracting is getting more used in the building industry because the client transfer maximum risk to the supplier.
 
 
=== Structure===
 
=== Structure===
You can see the relationships under at the figure.
 
 
As you can see in the figure, the main responsibility is centralized with the turnkey contractor. Normaly they guarantee compensation for delays and take full responsibility for overall project cost.(1) In a general contract it is a threeparty arrangement between the client, designer and the contractor. Here the client must relate to two parties and get responsible for design defects(2).
 
 
In the turnkey contract the objective of the contractor is to satisfy the clients performance specifications compared to the disigners plans and specifications.
 
 
=== Benefits ===
 
=== Benefits ===
One of the main benefits with this type of contracts is the savings in production cost.
+
 
 
== Risk Profile==
 
== Risk Profile==
== Application ==
+
=== Definition ===
 +
=== Structure ===
 +
==== Acceptable Risk ====
 +
==== Level of Risk ====
 +
==== Required Risk ====
 +
=== Benefits ===
 +
=== Limitations ===
 +
 
 +
== The use of Risk Profile in Turnkey Projects ==
 +
 
 
== Limitation ==
 
== Limitation ==
 +
 
== Annotated Bibliography==
 
== Annotated Bibliography==

Revision as of 15:53, 16 September 2015

There has been a transition in the construction industry as a result of innovations in the partnering relationships between the client and the project coalition actors. Today there is a number of different ways to form project coalitions in the industry. The different project structures come with different risks for actors involved in the project. The trend today is use of the integrated project coalition, also called turnkey, characterised by a single contract for both execution and design of the project. This type of contract provides low risk and mission uncertainty for the client. (5.4.5) But this provides more uncertainties for actors such as contractors, designers and consultants.

This type of project management approach requires a thorough risk profile for the project coalition actors. It will always be numerous risks in construction contracts. But without a comprehensive risk profile it could leave the contractor, designer or the consultant dangerously exposed to unexpected responsibilities and risks. This wiki-article will establish the leading contractual risk factors for the consultants in turnkey contracts in the construction industry.

Contents

Turnkey Projects

Definition

Structure

Benefits

Risk Profile

Definition

Structure

Acceptable Risk

Level of Risk

Required Risk

Benefits

Limitations

The use of Risk Profile in Turnkey Projects

Limitation

Annotated Bibliography

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox