Risk analysis

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
=Abstract=
+
==Abstract==
 
This article may overlap with Risk Management but will attempt to discuss different approaches to analysing the risk when managing projects/portfolios/programs
 
This article may overlap with Risk Management but will attempt to discuss different approaches to analysing the risk when managing projects/portfolios/programs
 
Several tools will be mentioned and explained briefly, but (in order to allow the full use of the wiki) not be described in detail  
 
Several tools will be mentioned and explained briefly, but (in order to allow the full use of the wiki) not be described in detail  
=Definition=
+
==Definition==
 
According to the ISO Guide 73-2009, Risk analysis is the “Process to comprehend the nature of risk and to determine the level of risk”
 
According to the ISO Guide 73-2009, Risk analysis is the “Process to comprehend the nature of risk and to determine the level of risk”
  
Line 8: Line 8:
  
 
This process mentioned is the computational part of risk management where different aspects, variables and factors are used to estimate the risk involved with a specific feature, action, decision, condition ect. The outcome of this computation is a quantified number or percentage which can then be used as an evaluation criterion, determining either which option to select or if it is safe to proceed down the investigated path.
 
This process mentioned is the computational part of risk management where different aspects, variables and factors are used to estimate the risk involved with a specific feature, action, decision, condition ect. The outcome of this computation is a quantified number or percentage which can then be used as an evaluation criterion, determining either which option to select or if it is safe to proceed down the investigated path.
=Main features of risk analysis=
+
==Main features of risk analysis==
 
Input:
 
Input:
 
:Purpose
 
:Purpose
Line 56: Line 56:
 
:Limitations
 
:Limitations
  
=Benefits of analysing risk=
+
==Benefits of analysing risk==
  
=Different models used when analysing risk=
+
==Different models used when analysing risk==
==Brainstorming==
+
::'''Brainstorming:'''
  
 
----
 
----
==Structured or semi-structured interviews==
+
::'''Structured or semi-structured interviews:'''
  
 
----
 
----
==Delphi technique==
+
::'''Delphi technique:'''
  
 
----
 
----
==Check-lists==
+
::'''Check-lists:'''
  
 
----
 
----
==Preliminary hazard analysis (PHA) ==
+
::'''Preliminary hazard analysis (PHA):'''
  
 
----
 
----
==Hazard and operability study (HAZOP) ==
+
::'''Hazard and operability study (HAZOP):'''
  
 
----
 
----
==Hazard analysis and critical control points (HACCP) ==
+
::'''Hazard analysis and critical control points (HACCP):'''
  
 
----
 
----
==Toxicity assessment==
+
::'''Toxicity assessment:'''
  
 
----
 
----
==Structured “What-If” Technique (SWIFT) ==
+
::'''Structured “What-If” Technique (SWIFT):'''
  
 
----
 
----
==Scenario analysis==
+
::'''Scenario analysis:'''
  
 
----
 
----
==Business impact analysis (BIA) ==
+
::'''Business impact analysis (BIA):'''
  
 
----
 
----
==Root cause analysis (RCA) == link!
+
::'''Root cause analysis (RCA):''' link!
  
 
----
 
----
==Failure modes and effects analysis (FMEA) / failure modes and effects and criticality analysis (FMECA) ==
+
::'''Failure modes and effects analysis (FMEA) / failure modes and effects and criticality analysis (FMECA):'''
  
 
----
 
----
==Fault tree analysis (FTA) ==
+
::'''Fault tree analysis (FTA):'''
  
 
----
 
----
==Event tree analysis (ETA) ==
+
::'''Event tree analysis (ETA):'''
  
 
----
 
----
==Cause-consequence analysis==
+
::'''Cause-consequence analysis:'''
  
 
----
 
----
==Cause-and-effect analysis==
+
::'''Cause-and-effect analysis:'''
  
 
----
 
----
==Layers of protection analysis (LOPA) ==
+
::'''Layers of protection analysis (LOPA):'''
  
 
----
 
----
==Decision tree analysis==
+
::'''Decision tree analysis:'''
  
 
----
 
----
==Human reliability assessment (HRA) ==
+
::'''Human reliability assessment (HRA):'''
  
 
----
 
----
==Bow tie analysis==
+
::'''Bow tie analysis:'''
  
 
----
 
----
==Reliability centered maintainance==
+
::'''Reliability centered maintainance:'''
  
 
----
 
----
==Sneak analysis (SA) / sneak circuit analysis (SCI) ==
+
::'''Sneak analysis (SA) / sneak circuit analysis (SCI):'''
  
 
----
 
----
==Markov analysis==
+
::'''Markov analysis:'''
  
 
----
 
----
==Monte Carlo simulation==
+
::'''Monte Carlo simulation:'''
  
 
----
 
----
==Bayesian statistics and Bayes Nets==
+
::'''Bayesian statistics and Bayes Nets:'''
  
 
----
 
----
==FN curves==
+
::'''FN curves:'''
  
 
----
 
----
==Risk indices==
+
::'''Risk indices:'''
  
 
----
 
----
==Consequence/probability matrix==
+
::'''Consequence/probability matrix:'''
  
 
----
 
----
==Cost/benefit analysis (CBA) ==
+
::'''Cost/benefit analysis (CBA):'''
  
 
----
 
----
==Multi-criteria decision analysis (MCDA) ==
+
::'''Multi-criteria decision analysis (MCDA):'''
  
=Reference=
+
==Reference==
 
ISO Guide 73-2009 – Risk Management Vocabulary
 
ISO Guide 73-2009 – Risk Management Vocabulary
  

Revision as of 02:39, 24 November 2014

Contents

Abstract

This article may overlap with Risk Management but will attempt to discuss different approaches to analysing the risk when managing projects/portfolios/programs Several tools will be mentioned and explained briefly, but (in order to allow the full use of the wiki) not be described in detail

Definition

According to the ISO Guide 73-2009, Risk analysis is the “Process to comprehend the nature of risk and to determine the level of risk”

ISO 31000 describes Risk analysis as the process which “provides an input to risk evaluation and to decisions on whether risks need to be treated, and on the most appropriate risk treatment strategies and methods”.

This process mentioned is the computational part of risk management where different aspects, variables and factors are used to estimate the risk involved with a specific feature, action, decision, condition ect. The outcome of this computation is a quantified number or percentage which can then be used as an evaluation criterion, determining either which option to select or if it is safe to proceed down the investigated path.

Main features of risk analysis

Input:

Purpose
Consequences
Likelihood / Probabilities
Existing control features
Effectiveness of existing control features
Causes of risk
Sources of risk
Factors influencing any of the above
Interrelations / Interdependence
Type of risk
Information available
Risk criteria

Output:

Combined Likelihood / probability
Consequences
Confidence in:
Risk level
Sensitivity of result to preconditions and assumptions
Information Uncertainty
Information Availability
Information Quality
Information Quantity
Ongoing relevance of information
Limitations

Benefits of analysing risk

Different models used when analysing risk

Brainstorming:

Structured or semi-structured interviews:

Delphi technique:

Check-lists:

Preliminary hazard analysis (PHA):

Hazard and operability study (HAZOP):

Hazard analysis and critical control points (HACCP):

Toxicity assessment:

Structured “What-If” Technique (SWIFT):

Scenario analysis:

Business impact analysis (BIA):

Root cause analysis (RCA): link!

Failure modes and effects analysis (FMEA) / failure modes and effects and criticality analysis (FMECA):

Fault tree analysis (FTA):

Event tree analysis (ETA):

Cause-consequence analysis:

Cause-and-effect analysis:

Layers of protection analysis (LOPA):

Decision tree analysis:

Human reliability assessment (HRA):

Bow tie analysis:

Reliability centered maintainance:

Sneak analysis (SA) / sneak circuit analysis (SCI):

Markov analysis:

Monte Carlo simulation:

Bayesian statistics and Bayes Nets:

FN curves:

Risk indices:

Consequence/probability matrix:

Cost/benefit analysis (CBA):

Multi-criteria decision analysis (MCDA):

Reference

ISO Guide 73-2009 – Risk Management Vocabulary

ISO 31000 - Risk management - Principles and guidelines

ISO 31010 - Risk management

International Journal of Project Management 32 (2014) - Vahid Khodakarami , Abdollah Abdi - Project cost risk analysis: A Bayesian networks approach for modelling dependencies between cost items