Risk analysis

From apppm
(Difference between revisions)
Jump to: navigation, search
m
m
Line 67: Line 67:
  
 
----
 
----
:'''Structured or semi-structured interviews:'''
+
:'''[http://en.wikipedia.org/wiki/Structured_interview Structured] or [http://en.wikipedia.org/wiki/Semi-structured_interview semi-structured] interviews:'''
  
 
----
 
----
:'''Delphi technique:'''
+
:'''[http://en.wikipedia.org/wiki/Delphi_method Delphi technique]:'''
  
 
----
 
----
Line 76: Line 76:
  
 
----
 
----
:'''Preliminary hazard analysis (PHA):'''
+
:'''[http://en.wikipedia.org/wiki/Hazard_analysis Preliminary hazard analysis (PHA)]:'''
  
 
----
 
----
:'''Hazard and operability study (HAZOP):'''
+
:'''[http://en.wikipedia.org/wiki/Hazard_and_operability_study Hazard and operability study (HAZOP)]:'''
  
 
----
 
----
:'''Hazard analysis and critical control points (HACCP):'''
+
:'''[http://en.wikipedia.org/wiki/Hazard_analysis_and_critical_control_points Hazard analysis and critical control points (HACCP)]:'''
  
 
----
 
----
Line 88: Line 88:
  
 
----
 
----
:'''Structured “What-If” Technique (SWIFT):'''
+
:'''[http://en.wikipedia.org/wiki/Structured_What_If_Technique Structured “What-If” Technique (SWIFT)]:'''
  
 
----
 
----
:'''Scenario analysis:'''
+
:'''[http://en.wikipedia.org/wiki/Scenario_analysis Scenario analysis]:'''
  
 
----
 
----
Line 97: Line 97:
  
 
----
 
----
:'''Root cause analysis (RCA):'''  
+
:'''[http://en.wikipedia.org/wiki/Root_cause_analysis Root cause analysis (RCA)]:'''  
  
 
----
 
----
:'''Failure modes and effects analysis (FMEA) / failure modes and effects and criticality analysis (FMECA):'''
+
:'''[http://en.wikipedia.org/wiki/Failure_mode_and_effects_analysis Failure modes and effects analysis (FMEA)] / [http://en.wikipedia.org/wiki/Failure_mode,_effects,_and_criticality_analysis failure modes and effects and criticality analysis (FMECA)]:'''
  
 
----
 
----
:'''Fault tree analysis (FTA):'''
+
:'''[http://en.wikipedia.org/wiki/Fault_tree_analysis Fault tree analysis (FTA)]:'''
  
 
----
 
----
:'''Event tree analysis (ETA):'''
+
:'''[http://en.wikipedia.org/wiki/Event_tree_analysis Event tree analysis (ETA)]:'''
  
 
----
 
----
Line 112: Line 112:
  
 
----
 
----
:'''Cause-and-effect analysis:'''
+
:'''[http://en.wikipedia.org/wiki/Ishikawa_diagram Cause-and-effect analysis]:'''
  
 
----
 
----
Line 118: Line 118:
  
 
----
 
----
:'''Decision tree analysis:'''
+
:'''[http://en.wikipedia.org/wiki/Decision_tree Decision tree analysis]:'''
  
 
----
 
----
:'''Human reliability assessment (HRA):'''
+
:'''[http://en.wikipedia.org/wiki/Human_reliability Human reliability assessment (HRA)]:'''
  
 
----
 
----
:'''Bow tie analysis:'''
+
:'''[http://en.wikipedia.org/wiki/Bowtie_(sequence_analysis) Bow tie analysis]:'''
  
 
----
 
----
:'''Reliability centered maintainance:'''
+
:'''[http://en.wikipedia.org/wiki/Reliability_centered_maintenance Reliability centered maintainance]:'''
  
 
----
 
----
:'''Sneak analysis (SA) / sneak circuit analysis (SCI):'''
+
:'''Sneak analysis (SA) / [http://en.wikipedia.org/wiki/Sneak_circuit_analysis sneak circuit analysis (SCI)]:'''
  
 
----
 
----
:'''Markov analysis:'''
+
:'''[http://en.wikipedia.org/wiki/Markov_chain Markov analysis]:'''
  
 
----
 
----
Line 139: Line 139:
  
 
----
 
----
:'''Bayesian statistics and Bayes Nets:'''
+
:'''[http://en.wikipedia.org/wiki/Bayesian_inference Bayesian statistics] and[http://en.wikipedia.org/wiki/Bayesian_network  Bayes Nets]:'''
  
 
----
 
----
Line 151: Line 151:
  
 
----
 
----
:'''Cost/benefit analysis (CBA):'''
+
:'''[http://en.wikipedia.org/wiki/Cost%E2%80%93benefit_analysis Cost/benefit analysis (CBA)]:'''
  
 
----
 
----
:'''Multi-criteria decision analysis (MCDA):'''
+
:'''[http://en.wikipedia.org/wiki/Multiple-criteria_decision_analysis Multi-criteria decision analysis (MCDA)]:'''
  
 
==Reference==
 
==Reference==

Revision as of 03:47, 24 November 2014

Contents

Abstract

This article is a subpart of Risk Management but will attempt to describe different approaches to analysing the risk when managing projects, portfolios and programs

Several tools will be mentioned and explained briefly, but (in order to allow the full use of the wiki) not be described in detail

Definition

According to the ISO Guide 73-2009, risk analysis is the “Process to comprehend the nature of risk and to determine the level of risk”

ISO 31000 describes risk analysis as the process which “provides an input to risk evaluation and to decisions on whether risks need to be treated, and on the most appropriate risk treatment strategies and methods”.

This process mentioned is the computational part of risk management where different aspects, variables and factors are used to estimate the risk involved with a specific feature, action, decision, condition ect. The outcome of this computation is a quantified number or percentage which can then be used as an evaluation criterion, determining either which option to select or if it is safe to proceed down the investigated path.


Main features of risk analysis

Input:

Purpose

The purpose is the reason for analysing the risk; it assists with determining the boundaries of the analysis.

Consequences
Likelihood / Probabilities
Existing control features
Effectiveness of existing control features
Causes of risk
Sources of risk
Factors influencing any of the above
Interrelations / Interdependence
Type of risk
Information available
Risk criteria

Output:

Combined Likelihood / probability
Consequences
Confidence in:
Risk level
Sensitivity of result to preconditions and assumptions
Information Uncertainty
Information Availability
Information Quality
Information Quantity
Ongoing relevance of information
Limitations

Benefits of analysing risk

Different models used when analysing risk

Brainstorming:

Structured or semi-structured interviews:

Delphi technique:

Check-lists:

Preliminary hazard analysis (PHA):

Hazard and operability study (HAZOP):

Hazard analysis and critical control points (HACCP):

Toxicity assessment:

Structured “What-If” Technique (SWIFT):

Scenario analysis:

Business impact analysis (BIA):

Root cause analysis (RCA):

Failure modes and effects analysis (FMEA) / failure modes and effects and criticality analysis (FMECA):

Fault tree analysis (FTA):

Event tree analysis (ETA):

Cause-consequence analysis:

Cause-and-effect analysis:

Layers of protection analysis (LOPA):

Decision tree analysis:

Human reliability assessment (HRA):

Bow tie analysis:

Reliability centered maintainance:

Sneak analysis (SA) / sneak circuit analysis (SCI):

Markov analysis:

Monte Carlo simulation:

Bayesian statistics andBayes Nets:

FN curves:

Risk indices:

Consequence/probability matrix:

Cost/benefit analysis (CBA):

Multi-criteria decision analysis (MCDA):

Reference

ISO Guide 73-2009 – Risk Management Vocabulary

ISO 31000 - Risk management - Principles and guidelines

ISO 31010 - Risk management

International Journal of Project Management 32 (2014) - Vahid Khodakarami , Abdollah Abdi - Project cost risk analysis: A Bayesian networks approach for modelling dependencies between cost items

Links

Only the following links are internal in the APPPM-wiki, All others are to Wikipedia.org and may be replaced when the APPPM-pages has been written, and added to this list:

Risk Management

Monte Carlo simulation

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox