New pages
(Latest | Earliest) View (newer 20 | older 20) (20 | 50 | 100 | 250 | 500)
- 18:31, 12 February 2023 Resource Leveling in Construction Projects (hist) [23,043 bytes] Onur (Talk | contribs) (Created page with " Abstract Management of the resources carries an indispensable importance for profitability and scheduling of construction projects. By their nature, construction projects req...")
- 18:21, 12 February 2023 Social loafing in multidisciplinary teams (hist) [22,891 bytes] Ahmetibre (Talk | contribs) (Created page with "Social loafing refers to the phenomenon in which individuals tend to put forth less effort when working in a group compared to when working alone. This behavior is especially ...")
- 18:14, 12 February 2023 A modern re-think of Fayolism (hist) [17,242 bytes] S226673 (Talk | contribs) (Created page with "A modern re-think of Fayolism Author: Rejath Ramachandran, s226673 == Summary == As a discipline, project management developed from several fields of application including ...")
- 18:09, 12 February 2023 Project Analytics (hist) [14,284 bytes] S213235 (Talk | contribs) (Created page with " == ABSTRACT == Analytics and project management are two related fields that can be used together to drive business success. Analytics refers to the systematic examination o...")
- 17:59, 12 February 2023 The Hawthorne studies (hist) [18,738 bytes] Stadsvold (Talk | contribs) (Created page with "The Hawthorne Studies were a serious of stuides, conducted in the")
- 17:58, 12 February 2023 Feasibility risk assessments of transport projects using Monte Carlo-simulations (hist) [24,340 bytes] S185048 (Talk | contribs) (Created page with "== Abstract == A common way of assessing the feasibility of an infrastructure projects (e.g., road or rail) is through a cost benefit analysis (CBA) , resulting in an overview...")
- 17:26, 12 February 2023 Management of change: Recognizing a need or opportunity for change (hist) [10,220 bytes] S183647 (Talk | contribs) (Created page with " == Abstract == Management of change is a structured approach to transitioning individuals, teams, projects and organizations from a current state to a desired future state. I...")
- 17:16, 12 February 2023 Satisficing: a decision-making strategy (hist) [2,639 bytes] S193967 (Talk | contribs) (Created page with "'''Abstract:''' Satisficing is a decision-making strategy where an individual makes the satisfactory and adequate choice instead the most optimal and it sets aside all the opt...")
- 17:02, 12 February 2023 Value canvas (hist) [22,784 bytes] AliGhani (Talk | contribs) (Created page with "Developed by Ali Abdul-Ghani - s184640 ==Abstract== ==Introduction== ==Big Idea== ==Application== ==Limitations== ==References== Kyhnau, J., & Nielsen, C. (2015). Val...")
- 16:33, 12 February 2023 Project viability assessment through Net Present Value (NPV) (hist) [30,939 bytes] Valdemar Vium (Talk | contribs) (Created page with " == Abstract == Do I put in the text here or what?")
- 16:30, 12 February 2023 Project viability assessment through Net Present Value (hist) [14 bytes] Valdemar Vium (Talk | contribs) (Created page with "This is a test")
- 16:17, 12 February 2023 Organisational context (hist) [18 bytes] S222742 (Talk | contribs) (Created page with "Editing in process")
- 16:13, 12 February 2023 High performance teams (hist) [32,218 bytes] S210102 (Talk | contribs) (Created page with "== High Performance Teams == === Abstract === ----")
- 15:27, 12 February 2023 Groups or teams? (hist) [29,771 bytes] DarioFiorica (Talk | contribs) (Created page with " == Abstract == In the complex practice of project management, the most important role is given to groups and teams. Initially, this article introduces the reader to the main...")
- 15:10, 12 February 2023 EQ and Leadership Effectiveness (hist) [26,067 bytes] S174750 (Talk | contribs) (Created page with "Abstract")
- 14:38, 12 February 2023 Decision tree analysis (hist) [23,082 bytes] S222540 (Talk | contribs) (Created page with " '''Abstract''' ---- Decision tree analysis is drawing a decision tree which represents graphically various different solutions to problems. The decision tree is used to try...")
- 14:37, 12 February 2023 The 6C Model (hist) [28,242 bytes] ChristinaKjaer (Talk | contribs) (Created page with "During a design process, knowledge is produced in many ways. In multidisciplinary teams several approaches are implemented in the traditional design process, resulting in a co...")
- 14:26, 12 February 2023 Turn conflicts into connections (hist) [1,054 bytes] Jianan Yang (Talk | contribs) (Created page with "''created by Jianan Yang'' ==Abstract==")
- 13:48, 12 February 2023 Communication Theories in Project Management (hist) [26,076 bytes] HendrikS (Talk | contribs) (Created page with "''' Communication Theories in Project Management''' '''Abstract''' Communication theories in project management generally aim to understand the communication process and how...")
- 13:46, 12 February 2023 Estimation Techniques (hist) [29,843 bytes] S184314 (Talk | contribs) (Created page with " == Top-down vs ground up estimations == == Abstract == Top-down and bottom-up are two different approaches to project estimation that are used to determine the cost, sched...")