Search results

Jump to: navigation, search
  • ...ped continuing to the toolbox. In short, TPS is focusing on optimizing the flow throughout the whole production process and meet the costumers needs. Howev ... This will also make the production more flexible and create a much better flow in the production process. It is important to notice that this customer can
    19 KB (3,150 words) - 15:40, 18 December 2018
  • ...term Building Information Model (BIM) is introduced. A model used to store information of physical features and functionality of the facility as data that can be ...s add the time schedule along material's quantity, pricing and maintenance information to the 3D model. An upcoming feature of VDC is virtual reality, which gives
    19 KB (3,120 words) - 13:19, 18 December 2018
  • ...his, three important methods are evaluated: the TFV-model (transformation, flow and value), the Last Planner System and the Location-Based Scheduling; conc ...the difference between the information required to make a decision and the information available. There are two concepts attached to this<ref> ''Graham M. Winch -
    14 KB (2,243 words) - 15:02, 18 December 2018
  • ...nt. In this model (figure 4), there is a complete structure in the flow of information which is well controlled with the decoupling points and defines the desired ...e information. However, in the beginning of a project, as there is limited information available, uncertainty is further increased. To deal effectively with this
    38 KB (5,492 words) - 15:21, 18 December 2018
  • ...Institute there are five steps (Figure 2) to determine the entire managing flow of the process from the beginning to the end: ... to the important role that the environment plays in a company. The latest information technology, and decision making are also included.
    39 KB (6,222 words) - 15:41, 18 December 2018
  • *Create Flow; *Make those processes flow;
    23 KB (3,693 words) - 15:45, 18 December 2018
  • ...ment contractor, and he will be responsible for the subcontractors and the flow of resources. ..., but it could include a wish to reduce buffers in warehousing, by sharing information and co-ordinating the suppliers. The focus of a supply chain is to establis
    24 KB (3,737 words) - 13:06, 29 September 2015
  • ...y boxes (Picture 2). Each task has an Activity Identity Box which contains information regarding task name, duration, early start, early finish, late finish, late ...ion methods and equipments. CPM provides the projects manager with precise information on the effects of each variation or delay in the adopted plan and thereby i
    23 KB (3,695 words) - 14:56, 18 December 2018
  • ...ists of five principles; Specify value, Integrate the value stream, Create flow by eliminating waste, Establish pull and Seek perfection (see description b |3. Create Flow by Eliminating Waste
    17 KB (2,674 words) - 15:49, 18 December 2018
  • ... communicate each others to achieve the same goal and how people can share information in a larger scale. Visual communication is one of the methods used to communicate information or expression of ideas through a visual form.
    21 KB (3,183 words) - 15:46, 18 December 2018
  • ...rom the earliest stages of the project's life cycle. The lack of available information or knowledge are considered to be some of the basic reasons that cause unce ...rtunities that may occur during the project's life cycle. In figure 3, the flow lines show how the roots of uncertainties influence the project. The arrows
    20 KB (3,030 words) - 15:26, 18 December 2018
  • ...cholz, P.; Sacks, R.; Liston, K., 2008, "BIM Handbook: a Guide to Building Information Modeling for owners, managers, designers, engineers, and contractors"</ref> ...us on construction projects since the benefits achieved through the use of information modelling are especially applicable to the challenges of diversified constr
    30 KB (4,385 words) - 14:55, 18 December 2018
  • ...f screening all the options, the managers only identify the most important information and options. It follows that they cannot maximize their objectives. Rather
    13 KB (1,927 words) - 15:35, 18 December 2018
  • ...n to contractors there are electricians, carpenters, bricklayers, etc. The flow of the different projects is entirely dependent on the planning and interac ...veloped waste, and therefore a shift in the industry was needed, to a more flow-based management. Lean Construction was evolved, and in 1993, the term was
    25 KB (3,882 words) - 15:24, 18 December 2018
  • ...ere also has to be a very clear communication strategy, for information to flow efficiently within an organization. The duo needs to have a good chemistry
    17 KB (2,739 words) - 19:05, 28 September 2015
  • ...ng style, timing and channel, organizations ensure everyone can access the information they need, when they need it. ...ations-management-strategy </ref>. It controls the bi-directional flow of information with stakeholders, thus encouraging their engagement. PRINCE2™ <ref name=
    19 KB (2,722 words) - 14:58, 18 December 2018
  • ...is to mitigate poor multitasking. One initiative is to provide prioritized information to all resources. A relay race works as an analogy. While each component in ... again merging as the project has intermediate deliverables. These complex flow are not optimally compatible with deriving a feeding chain with accompanyin
    16 KB (2,522 words) - 14:10, 27 November 2018
  • The goal of PD is approached by producing useful information that reduces uncertainty and risk[7]. ...duct development phases, design decisions are made within the context of a flow of decisions[4], which implies that knowledge over the product, problems,
    10 KB (1,435 words) - 13:30, 21 September 2015
  • *maximize flow by using iterative development to reduce development time; ...particularly for the first few Sprints, this facilitates communication and information sharing.
    20 KB (3,205 words) - 15:13, 18 December 2018
  • ...//en.broad.com] ]][[File:1111.png |600px|thumb|right|BSB Project operation flow chart[http://en.broad.com] ]] ...because the Broad Town workshops were not fully constructed and production flow was not optimal at that time. Today a similar 17.000 m2 order can be produc
    30 KB (4,402 words) - 15:50, 18 December 2018

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox