Search results

Jump to: navigation, search
  • ...mmon ways to rearrange or change the matrix to reduce loops of information flow or to let non-dependent activities run in parallel. Also the practical proc ...ction of buildings a simple Gantt chart may be of use to schedule the work flow of different tasks. Otherwise a CPM analysis (Critical Path Method), CCM an
    24 KB (3,853 words) - 13:31, 19 November 2018
  • ... less time is spend on queuing before being processed and the reduction of flow variation, resulting in continuous ongoing improvements. - Make the value adding steps flow without interruption
    21 KB (3,205 words) - 19:50, 20 June 2017
  • ...s changes since 1990, due to the growth of the internet, which changed the information flows on construction projects. These changes are grouped under the term e- ...esses. The evolution of ICT in the recent years has changed the process of information creation, storage and access. Through fixed ICT agreements the optimal foun
    18 KB (2,663 words) - 13:40, 19 November 2018
  • ...of [[Communication in Project Management]] enabling continuous information flow to translate the owner’s value preposition into a successful project. The ...s to see both the limitations and advantages of this method of information flow. First the paper will make a description and application of BIM during the
    17 KB (2,581 words) - 19:18, 20 November 2018
  • ...ling]</span> (BIM) which is a process that came to revolutionize the work -flow of the Architecture, Engineering and Construction (AEC) Industry. The fourt ...construct and manage buildings through a holistic approach and model-based information. Figure 1. shows the 7-dimensions of BIM.
    25 KB (3,674 words) - 19:21, 20 November 2018
  • ...t places the construction project manager as the key person in the project information flows. <ref> Winch, G. (2010). Managing Construction Projects. Wiley-Blackw ...formation flow during construction phase#Application|BIM-based information flow during construction phase § Application]]''
    24 KB (3,639 words) - 19:21, 20 November 2018
  • ... are fixed price, can do no more than manage the shape of the project cash-flow s-curve.<ref name="winch2">Winch, Graham M., Routledge, (2014) "Institution This paper synthesizes some of the information that exists around international construction industry productivity and com
    16 KB (2,368 words) - 19:24, 20 November 2018
  • [[Cash Flow in construction industry]] presents an aspect of utmost importance for the the accountant. Cash flow is an ongoing process, in which the project manager must cope with
    10 KB (1,571 words) - 20:02, 12 June 2017
  • ...ness of assumptions. It is also possible to use cause and effect diagrams, flow charts and influence diagrams. These methods for identifying risk sources, ..., with a three-step data flow <ref name=" PMI " />, is defined. Inputs are information used for the risk identification and the risk register is the product of ri
    21 KB (3,036 words) - 19:26, 20 November 2018
  • ===Discounted cash flow=== ...e exploitation of the project. This concept is referred as discounted cash flow.
    22 KB (3,435 words) - 19:25, 20 November 2018
  • Cash Flow in construction industry presents an aspect of utmost importance for the co the accountant. Cash flow is an ongoing process, in which the project manager must cope with
    10 KB (1,556 words) - 21:46, 12 June 2017
  • ... does not have to be a physical product but can just as well be a service, information or conducted paperwork as illustrated by Figure 1. Examples of defects that * Missing information in drawing material
    27 KB (4,004 words) - 12:46, 19 November 2018
  • ... less time is spend on queuing before being processed and the reduction of flow variation, resulting in continuous ongoing improvements. * Make the value adding steps flow without interruption
    21 KB (3,196 words) - 13:35, 19 November 2018
  • This page is mostly oriented for project management information-seekers students or practitioners. * Cash flow ([http://wiki.doing-projects.org/index.php/Cash_flow_and_milestone_payments
    15 KB (1,817 words) - 08:38, 9 August 2022
  • *Payback analysis – simply considers the cash flow of costs and benefits *Discounted cash flow – considers the ‘time value’ of cash flows
    4 KB (684 words) - 10:49, 16 November 2018
  • ...nties and strategy modifications. According to Simons they are "the formal information systems that managers use to monitor organizational outcomes and correct de ...y creating '''positive forces'''. According to Simons they are the "formal information systems managers use to involve themselves regularly and personally in the
    18 KB (2,592 words) - 09:30, 17 May 2019
  • ===Information gathering=== *System or process flow charts: shows how elements in the project interrelate.
    2 KB (250 words) - 11:26, 13 August 2017
  • ... financial measurement. Is the classic organisations measurement like cash flow, income, return and more like it. Dependent on which phase the organization Also that it is dependent on the information given to the tool. if wrong information gets in the wrong info comes out.
    20 KB (3,246 words) - 18:23, 17 November 2018
  • *Design an optimum flow ... the week is to develop solutions to eliminate critical waste, develop new flow scenarios with new standard work combinations, prioritize changes, plan the
    22 KB (3,436 words) - 18:25, 17 November 2018
  • ...gement decisions; reveals and defines both methodicalness and slack in the flow plan or the network of sequential activities that must be performed to meet In this model, the activities are represented as boxes with all the information and the events as the arrows linking them.
    14 KB (2,198 words) - 18:26, 17 November 2018

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox