Talk:Risk Profile in General Contracting

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 11: Line 11:
 
* The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work
 
* The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work
 
* The lack of text and imagines make impossible to me to do some actual consideration about the work
 
* The lack of text and imagines make impossible to me to do some actual consideration about the work
 +
 +
 +
== '''Reviewer 1, 150477''' ==
 +
 +
 +
The article has been accessed the 22/09/2015 at 21 p.m.
 +
 +
'''* Overall overview.'''

Revision as of 21:56, 22 September 2015

KB1991, reviewer 2:

  • What there is written so far is good.
  • Good introduction that describes the topic briefly, but the last part has been written twice.
  • The structure looks fine both regards to the formatting and the red threat.
  • Would have been nice to read more of the article ☺


s150905, Review 2:

The idea behind this article seem really interesting, but most of the article itself is missing

  • The sketched structure appears to be just a draft of the final one, and if the one I see now is the final one I think is not satisfactory for a good work
  • The lack of text and imagines make impossible to me to do some actual consideration about the work


Reviewer 1, 150477

The article has been accessed the 22/09/2015 at 21 p.m.

* Overall overview.

Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox