Task Management - 3 Levels of Planning Methods

From apppm
(Difference between revisions)
Jump to: navigation, search
(Created page with "Planning methods is a key feature in Task Management and helps creating an overview and structure in projects. Depending on the specific tasks and their complexity, the plann...")
 
Line 1: Line 1:
Planning methods is a key feature in Task Management and helps creating an overview and structure in projects.  
+
Planning methods is a key feature in Task Management and helps to create an overview and structure in projects.  
Depending on the specific tasks and their complexity, the planning can be done in 3 different levels:
+
Depending on the specific tasks and their complexity, the planning can be done at 3 different levels:
 
- Network Planning
 
- Network Planning
 
- Gantt Chart
 
- Gantt Chart
 
- Cyclogram Planning
 
- Cyclogram Planning
The 3 planning methods differentiate in number of dimensions and represent 1, 2 or 3 dimensions. The goal of all 3 planning methods is to show a path from the beginning to the end of the project, but the difference lies in how the path is visualized and planned. The first two methods is part of the Critical Path Method (CPM) and the last method is Location-Based Scheduling (LBS).
+
The 3 planning methods differentiate in the number of dimensions and represent 1, 2 or 3 dimensions. The goal of all 3 planning methods is to show a path from the beginning to the end of the project, but the difference lies in how the path is visualized and planned. The first two methods are part of the Critical Path Method (CPM) and the last method is Location-Based Scheduling (LBS).
 
The following article gives an insight into how the 3 planning methods benefits Task Management and pros and cons between the methods depending on the project.
 
The following article gives an insight into how the 3 planning methods benefits Task Management and pros and cons between the methods depending on the project.

Revision as of 15:01, 7 February 2021

Planning methods is a key feature in Task Management and helps to create an overview and structure in projects. Depending on the specific tasks and their complexity, the planning can be done at 3 different levels: - Network Planning - Gantt Chart - Cyclogram Planning The 3 planning methods differentiate in the number of dimensions and represent 1, 2 or 3 dimensions. The goal of all 3 planning methods is to show a path from the beginning to the end of the project, but the difference lies in how the path is visualized and planned. The first two methods are part of the Critical Path Method (CPM) and the last method is Location-Based Scheduling (LBS). The following article gives an insight into how the 3 planning methods benefits Task Management and pros and cons between the methods depending on the project.