The Critical Path Method (CPM)

From apppm
Revision as of 17:03, 13 September 2015 by Sissel (Talk | contribs)

Jump to: navigation, search

This article will introduce the Critical Path Method (CPM). CPM is a step-by-step project management method for process planning. By focusing on tasks duration CPM identifies the minimum length of time needed to complete a project and help define the most efficient way to schedule the project. CPM was developed in 1956 by the U.S. Navy to the air and defense industry.[1] The critical path identified by the CPM is often used as a precursor to Gantt Charts. The critical path can if needed be used to identify which task to accelerate to complete the project within the available time. Furthermore CMP allows you to identify slack time (free resources) and it helps you to be secure that the project follows the time schedule. To identify the critical path through the project you can either use CPM or PERT (Program, Evaluation, Review and Technique). CPM is used then the task time estimate is quite accurate whereas PERT is used in uncertain situations thus applying three time estimates to create the expected time. CPM is therefore the most simplified method (Zelbst, 2011). CPM utilizes tasks duration as the parameter for optimization the schedule and resource planning. This is in opposition to Critical Chain Theory using resources as the measured component.[2]

Contents

Introduction to CPM

Guidance on method

Application

Discussion on limitations

Cite error: Closing </ref> missing for <ref> tag


Books

  • Book: Woodhead, James M. Antill & Ronald W. Critical Path Methods in Construction Practice. John Wiley & Sons, Inc., 1990. [1]


Links


Bibliography

  1. 1.0 1.1 Woodhead, James M. Antill & Ronald W."Critical Path Methods in Construction Practice" John Wiley & Sons, Inc. (1990): 90.
  2. 2.0 2.1 simplilearn.com, 2009
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox