The dynamics of adversarial relations

From apppm
(Difference between revisions)
Jump to: navigation, search
(History)
(History)
Line 3: Line 3:
 
=History=
 
=History=
  
The emergence of general contracting in Europe is associated with the housing crysis following World War II while in Britain this happened much earlier, during the first half of the 19th century after the civil war and the rebuilding of London after the great fire. A shift to 'contracting in gross', where a single contractor undertook the financial responsibility in a single contract for the entire work, had to be done because of the urgency in the building programme.
+
The emergence of general contracting in Europe is associated with the housing crysis following World War II while in Britain this happened much earlier, during the first half of the 19th century after the civil war and the rebuilding of London after the great fire. A shift to 'contracting in gross', where a single contractor undertook the financial responsibility in a single contract for the entire work, had to be done because of the urgency in the building programme. This required the development of a system of measurement, removed the master craftsmen from direct contact with the arhitect while the arhitects were required to produce complete designs before tender.
 +
 
 +
In civil engineering this trend had a similar outcome in the adoption of the ''professional system''.
  
 
=References =
 
=References =
 
<references/>
 
<references/>

Revision as of 09:56, 12 June 2017

The attempts by clients to manage the problem of moral hazzard and to reduce the scope of opportunistic behaviour by the contractor have the tendency to generate vicious circles of adversarial behaviour between parties.[1]. The dynamic of adversarial relartions created by the client's desire to get the 'best deal', can generate an escalation of the transaction costs while the costs of production seem to be pushed down. [2].

History

The emergence of general contracting in Europe is associated with the housing crysis following World War II while in Britain this happened much earlier, during the first half of the 19th century after the civil war and the rebuilding of London after the great fire. A shift to 'contracting in gross', where a single contractor undertook the financial responsibility in a single contract for the entire work, had to be done because of the urgency in the building programme. This required the development of a system of measurement, removed the master craftsmen from direct contact with the arhitect while the arhitects were required to produce complete designs before tender.

In civil engineering this trend had a similar outcome in the adoption of the professional system.

References

  1. Winch, Graham M., Wiley-Blackwell, (2010) "Managing Construction Projects, 2nd edition "
  2. Curtis, B., Ward, S. and Chapman, C., CIRIA, (1989) "Roles, Responsibilities and Risks in Management Contracting "
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox