Work Breakdown Structure

From apppm
Revision as of 11:33, 12 February 2018 by Giannis (Talk | contribs)

Jump to: navigation, search

Abstract

It is generally recognized by project management professionals that the Work Breakdown Structure (WBS) is the foundation of planning, estimating, scheduling, and monitoring activities. With its contribution a framework of common reference for all schedules and better estimates is ensured.[1] A Work Breakdown Structure (WBS) is the process of subdividing project deliverables and project work into smaller, more manageable components. More specifically, it is a hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables. [2]

The purpose of this wiki-article is not only to thoroughly describe the capabilities and restrains of this method but also to provide guidance concerning the techniques that can be used for the effective implementation of project and program Work Breakdown Structures.


References

  1. Dr. Parviz F. Rad. “Advocating a Deliverable-Oriented Work Breakdown Structure”, Cost Engineering - December 31 1999.
  2. Project Management Institute. “A Guide to the Project Management Body of Knowledge (PMBOK® Guide)”- Fifth Edition, 2013.
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox