Work Breakdown Structure (WBS) in Project Management

From apppm
(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
==Abstract==
+
==Definition of Work Breakdown Structure ==
Work Breakdown structure(WBS) is a widely applied tool in the field of project management that ''allows us to visually see the work that is needed in order to complete a project. The bottom line is by using a work breakdown structure it decreases the number of unexpected situations and enhances the ability to better estimate future projects''.
+
 
 +
The Work Breakdown Structure (WBS) is a widely applied tool in the field of project management which is defined as the hierarchical decomposition framework for presenting the work that needs to be executed by the team, in order to achieve the project objectives. (ISO 21500 Standard, p. 18). Specifically, it creates the backbone of the project and provides a clear visual overview of the work to be completed. WBS is a tool that gives the ability to the project team to develop the project schedule and the resource requirements, to estimate and control the cost, while at the same time to minimize the number of unexpected situations. Therefore, the main purpose of WBS is to organize the team’s work into manageable sections and define the total scope of the project.
 +
 
 +
===History===
 +
 
 +
The Work Break Down Structure (WBS) was developed during 1960s by the U.S. Department of Defense (DoD) and the National Aeronautics and Space Administration (NASA) under the two main pillars of ‘’planning’’ and ‘’controlling’’ the large projects they were responsible for, in order to provide the best quality. Specifically, on June 1962, NASA and DoD published a document regarding PERT/COST which was the first approach to the Work Breakdown Structure. It is worth pointing out, that this guide was adopted in all services as a military standard across DoD <ref name="DoD"/> .  
  
==Create WBS==
 
===Inputs===
 
 
===Tools and Techniques===
 
===Tools and Techniques===
 
===Outputs===
 
===Outputs===
Line 11: Line 14:
  
 
==References==
 
==References==
 +
 +
<references>
 +
 +
<ref name="DoD">DOD and NASA Guide, PERT/COST System Design, June 1962 </ref>

Revision as of 01:31, 19 May 2019

Contents

Definition of Work Breakdown Structure

The Work Breakdown Structure (WBS) is a widely applied tool in the field of project management which is defined as the hierarchical decomposition framework for presenting the work that needs to be executed by the team, in order to achieve the project objectives. (ISO 21500 Standard, p. 18). Specifically, it creates the backbone of the project and provides a clear visual overview of the work to be completed. WBS is a tool that gives the ability to the project team to develop the project schedule and the resource requirements, to estimate and control the cost, while at the same time to minimize the number of unexpected situations. Therefore, the main purpose of WBS is to organize the team’s work into manageable sections and define the total scope of the project.

History

The Work Break Down Structure (WBS) was developed during 1960s by the U.S. Department of Defense (DoD) and the National Aeronautics and Space Administration (NASA) under the two main pillars of ‘’planning’’ and ‘’controlling’’ the large projects they were responsible for, in order to provide the best quality. Specifically, on June 1962, NASA and DoD published a document regarding PERT/COST which was the first approach to the Work Breakdown Structure. It is worth pointing out, that this guide was adopted in all services as a military standard across DoD [1] .

Tools and Techniques

Outputs

WBS Example

Advantages and limitations of using WBS

References

  1. DOD and NASA Guide, PERT/COST System Design, June 1962
Personal tools
Namespaces

Variants
Actions
Navigation
Toolbox