Search results

Jump to: navigation, search
  • ...e project members need to be '''experts''' in their respective fields. The method can easily become too difficult to learn and most importantly too difficult
    24 KB (3,572 words) - 15:33, 18 December 2018
  • ...eir power in contrast to their interest of a project/program. This mapping method is often used in relation to the Winch-Bonke framework in construction proj ...older map. For a more detailed solution of an improved stakeholder mapping method, the following article is recommended: [[Stakeholders from a dynamic and ne
    24 KB (3,737 words) - 13:06, 29 September 2015
  • The Chart is based on the work breakdown structure. This method is used to breaking down a project into components or pieces that can be es
    17 KB (2,936 words) - 15:07, 18 December 2018
  • The most common method for decomposing a WBS are the following methods: *Method
    19 KB (2,996 words) - 14:46, 10 February 2022
  • |No detailed plans for the overall of the project due a non-systematic method of detection of signals
    15 KB (2,228 words) - 15:10, 18 December 2018
  • ... [[Work_Breakdown_Structure_(WBS)| Work Breakdown Structure]] or a similar method. Thus, a RACI matrix can be used locally on a small branch of the WBS, whic A very good point-by-point method to set-up a RACI matrix.
    22 KB (3,413 words) - 14:57, 18 December 2018
  • Communication strategy in project management is one of the most important method to improve the project and be able to carry forward the project effectively
    1 KB (190 words) - 17:11, 13 September 2015
  • ...and applicability of the method. CPM is a step-by-step project management method for process planning. CPM was developed in 1956 by the E.I. du Pont de Nemo ... project duration time, so less acurate time estimates can be used in this method. PPS focus on estimates on both cost and time for design, construction and
    23 KB (3,695 words) - 14:56, 18 December 2018
  • ...re originally related to machine capacity but Toyota experienced that this method could be used on employees as well. Figure 4 shows how the development of t
    17 KB (2,674 words) - 15:49, 18 December 2018
  • ...ound studies for starting the project and for comparing these studies good method could be to use SWOT analysis. ...re several tools for solving a decision problem. Sometimes “the simpler method, the better” but complex decision problems may require complex methods, a
    17 KB (2,786 words) - 15:50, 18 December 2018
  • ...cause negative impacts on a project, has become a more cost-time efficient method. However, it requires high level of skills and knowledge to intepret the re
    20 KB (3,030 words) - 15:26, 18 December 2018
  • ... project <ref name="Bips"> Bips, Digital Constructions 2006, “3D Working Method 2006” </ref>. Using information levels when working with BIM tools, helps ...ling]]. Both these types of scheduling is based on the [[The Critical Path Method (CPM)]]. The critical path can be more accurately determined with the use o
    30 KB (4,385 words) - 14:55, 18 December 2018
  • Critical Chain Project Management(CCPM) is a method to plan, execute, manage, and control both single and multi projects, which The Critical Chain method mainly differs from the traditional methodologies* on the attention it plac
    29 KB (4,486 words) - 22:16, 28 September 2015
  • Benchmarking is a method of assessing the quality of a project’s management and learning from it f Even though the scope of Atkinson's method is logical, substantial disaggregation will still be needed for benchmarkin
    28 KB (4,139 words) - 15:27, 18 December 2018
  • This method has two limitations. It only works if the stabile dynamics exists by being
    13 KB (1,927 words) - 15:35, 18 December 2018
  • ...er new markets. More recently, organizations are integrating the Six Sigma method to the PMBOK project management process to try to gain maximum advantage. ...plates and advice, promotes appropriate use of tools such as critical path method, and perhaps performs periodic project reviews.
    8 KB (1,159 words) - 08:41, 22 September 2015
  • ... to exploration (eg reserves estimation), development (eg wrong extraction method or engineering complex challenges) and construction risks.
    13 KB (1,980 words) - 15:41, 18 December 2018
  • ...s in a production line. However TOC has evolved from a production schedule method to a project management methodology that can be used to schedule resources ...zation. One of the most known is “Drum-Buffer-Rope” (DBR), which is a method of synchronizing a production to the constraint while minimizing inventory
    21 KB (3,389 words) - 09:36, 17 May 2019
  • ...haracterizes the traditional model and its strict requirements the extreme method is more suitable to face the common unexpected changes that come up during Rapid planning is a project managing method used for developing project plans which is based on the Rapid Application D
    21 KB (3,455 words) - 15:18, 18 December 2018
  • One does encounter various problems with this method of employing project managers in a company. First of all, the specialized k Among the companies that have tried this method, is Goldman Sachs, Unilever, and Motorola<ref name="jointleader">Palmer, M.
    17 KB (2,739 words) - 19:05, 28 September 2015

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox