Project Evaluation and Selection for the Formation of the Optimal Portfolio

From apppm
(Difference between revisions)
Jump to: navigation, search
(Content)
Line 44: Line 44:
 
Standards and surveys?
 
Standards and surveys?
  
=Content=
+
=From Project Selection to the Optimal Portfolio=
 
==Major concepts==
 
==Major concepts==
  

Revision as of 16:15, 15 November 2014

The increasing intensity of competition and fast technology changes make firms look for the development of more innovative products. In order to keep up with market trends and to stand out from competitors, most of the companies in technological fields turn to the development of R&D projects. Generally, these are risky due to the uncertainty surrounding its technological feasibility and its future commercial success, which make their evaluation and selection difficult to achieve. Nevertheless, the survival of an organization is highly correlated with correct project selection and management (Ashrafi, 2012). A wide diversity of approaches have been developed and used throughout recent years in order to cope with this problem, each of them with its own advantages and disadvantages. The most common are quantitative methods, qualitative methods and hybrids methods (Ashrafi, 2012). Nonetheless, most of the times not only one method is used during the evaluation process.

Even if the projects are correctly evaluated separately, this does not guarantee that the best portfolio can be formed. The best portfolio is the one that maximizes the probabilities of achieving the goals set by the company (Chien, 2002). Its formation is not just about evaluating independent projects; it is about evaluating the whole portfolio itself. Choosing the best projects based on financial or any other criteria may not result in the best portfolio due to dependencies or interrelations that may exist between the projects. The most common of them are related to cost, resources, financial return and technical factors (Blau, 2004), as well as outcome and impact dependencies. The problem of evaluating and selecting projects and scheduling them is complicated further by their presence. These dependencies add complexity to the decision that needs to be taken, since the decision-making process becomes less straightforward. A good example is the impossibility of using some quantitative methods, like linear programming. A good example of this situation is given when investing an additional monetary unit, since it may have impact in more than one project, since the additive restriction does no longer exists under this perspective. In consequence, a difference between measuring the preference for the portfolio as a whole and measuring the preferences for projects in the portfolio (Chien, 2002), and it may be also the case where the objectives that are considered when evaluating portfolios are different than those used when selecting individual projects.

If a company decides to evaluate a portfolio as it would evaluate projects, the amount of time required would be unmanageable. With only a set of 10 projects, the decision-maker would need to evaluate 1024 portfolios (Ghapanchi, 2012), which would be impossible for most of the companies. In consequence, newer methods have been developed to assist with choosing the best portfolio within a shorter time. This article focuses on describing and analyzing these methods.


Contents

Background

Application context

Every organization has an specific business strategy that will enable its employees to reach its long-term goals. In consequence, ideas and concepts are developed, products or services are designed, produced, manufactured and sold. However, companies need to take decisions along this path, since they do not have unlimited resources for pursuing every idea. Furthermore, every one of them has a benefit accompanied by a certain degree of risk. Nevertheless, frequently, both benefits and risks are difficult to measure, since perfect information is not always (almost never) available. Selecting the best projects (according to different criteria, like expected benefits, risk, investment, return, among others) is a common practice among many enterprises, no matter the industry they belong to. At the same time, projects can be of very different origin. Some of the most discussed in the literature are R&D projects, New Product Development, marketing campaigns, among others internal activities.

Development history

Few project selection models are being utilized as aids to decision making. The number of selection models, along with user interest in applying them, grew exponentially in the 1950's and 1960's; however, this trend has reversed since the mid-1970's (Chien).

Acceptance and use

Standards and surveys?

From Project Selection to the Optimal Portfolio

Major concepts

  • Kinds of methods

In order to understand why dependencies or interrelations are relevant to this topic, and why the methods discusses above do not lead to an optimal decision, it is important to define what are these interactions. To begin with, it is worth noting that there are two sources of interactions among projects: internal and external factors. The former arises when the resource requirements and/or benefits of one project are significantly affected in magnitude and/or timing by the selection or rejection of one or more of the projects in the set. On the other hand, the external interactions are those that arise over time from social and economic changes which have effects over subsets of the project set (Fox et. al, 1984). Through this article, only the internal interactions are going to be discusses, since those externals are impossible to know/quantify beforehand by the decision-maker.

There are 6 major sources of internal dependencies: Costs dependency, (non-monetary) resources dependency, expected financial return dependency, expected outcome dependency, technical dependency and impact dependency. Some of them may overlap in scope, but are different in essence.

Cost Dependency

Cost Dependency. The sum of the cost of the projects is lower than the total cost of the portfolio.

It is also called resource-utilization dependency. It is said that this happens when the sum of the costs of two or more projects within a portfolio do not match the total cost of the entire portfolio. This happens because there is some degree of resource sharing, like labor, utilities, machinery and tooling, among others (Blau, Chien).

Resources Dependency

Methods

Key elements

Projects to Portfolios
  • Dependencies as in taken into account
  • New methods

Related material

Comparable standards / recommendations

Obviosuly standards

Additional related material

Webpages or books

Discussion

Strengths and weaknesses

There are some limitations in the existing project selection models (Chien) for the further formation of portfolios:

  • Inadequate treatment of multiple, ofthn interrelated, evaluation criteria.
  • Inadequate treatment of dependencies among projects.
  • Inability to handle non-monetary aspects, for example, diversity among projects.
  • No explicit recognition and incorporation of the experience and knowledge of the managers or decision makers.
  • Perceptions by the managers that the models are difficult to understand and use.

Controversial points

Pro's and con's

Integration / relationship to other material

Relationship with resource allocation

Implementation advice

How to use and methods

Choosing the adequate one.