Search results

Jump to: navigation, search
  • Showing below up to 20 results starting with #1.
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
 

Page title matches

  • ...of [[Communication in Project Management]] enabling continuous information flow to translate the owner’s value preposition into a successful project. The ...s to see both the limitations and advantages of this method of information flow. First the paper will make a description and application of BIM during the
    17 KB (2,581 words) - 19:18, 20 November 2018

Page text matches

  • ...Construction is based on three views in production theory, Transformation, Flow and Value (TFV). These three views do not compete with each other but are r ...niversity, USA.</ref>. Furthermore, Koskela introduced the Transformation, Flow and Value (TFV) theory that is derived from earlier theories regarding prod
    25 KB (3,805 words) - 12:20, 20 December 2018
  • ...t aims to optimize and develop projects: (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection <ref name="3a" /> '''3. Create flow'''
    20 KB (3,113 words) - 22:57, 28 February 2021
  • ...nning'', John Wiley & Sons Inc. Hoboken, NJ</ref>. Colleting the necessary information can be divided into two subgroups; primary and secondary data gathering <re Identifying the right stakeholders can provide access to information and knowledge. This is due to the fact that knowledge is not only embedded
    23 KB (3,510 words) - 12:29, 20 December 2018
  • ...ization and in-depth analysis does not form part of this article (for more information, consult the section ''Related Material''). ...ertheless, both benefits and risks are difficult to measure, since perfect information is almost never available. In part, [http://apppm.man.dtu.dk/index.php/Risk
    28 KB (4,072 words) - 12:48, 20 December 2018
  • ... der Veen (2005), Mental model mapping as a new tool to analyse the use of information in decision-making in integrated water management, Physics and Chemistry of The analysis of the current state is based on information found in the [http://en.wikipedia.org/wiki/Task_analysis task analysis]. Th
    15 KB (2,424 words) - 11:11, 20 December 2018
  • ...ilable, and the project management guide has to be revised to take the new information into account. ...to develop a project charter and Project Management Plan. It also includes information about how to direct and manage project work, and how to control the work.
    13 KB (1,877 words) - 11:09, 20 December 2018
  • ...right place at the right time in the right quality to achieve perfect work flow, while minimizing waste and being flexible. *Principle 3: Make the project '''flow''' continuously without interruptions.
    26 KB (4,088 words) - 12:07, 20 December 2018
  • ...e the final product gets handed over to the customer <ref name=four/>. The flow of the APM model is shown in Figure 1. ...kshops lessons learned will be discussed, and as all stakeholders get more information about APM, new projects can be initiated using the approach <ref>ESI Intern
    18 KB (2,884 words) - 14:18, 11 February 2021
  • ...ai, P. C. (2013). Applying Lean Production A3 to Enhance Construction Work Flow. Life Science Journal, 10(2).'' </ref>. ...n projects within the program. The status A3 report can provide systematic information across the organisation as input for program managers to systematically upd
    20 KB (3,185 words) - 12:28, 20 December 2018
  • The information available regarding risk management at portfolio level is fairly scarce. Me #The integration of risk information into project portfolio management is positively related to project portfoli
    23 KB (3,310 words) - 12:41, 20 December 2018
  • ...nates from the TPS, where the method is called “Material and Information Flow Mapping” and used to depict current, future or ideal states in the proces #Flow
    15 KB (2,404 words) - 11:12, 20 December 2018
  • ...is to mitigate poor multitasking. One initiative is to provide prioritized information to all resources. A relay race works as an analogy. While each component in ... again merging as the project has intermediate deliverables. These complex flow are not optimally compatible with deriving a feeding chain with accompanyin
    16 KB (2,526 words) - 12:04, 20 December 2018
  • ...le="height:10px; width:150px; text-align:left;" |11.6.1.3 Work Performance Information Work performance information related to various performance results includes, but is not limited to:
    23 KB (3,698 words) - 12:06, 20 December 2018
  • ''5. Flow and pace'' – The projects must deliver fast and often, thus the project s ...ship. However, consensus building must not over shadow the principle on “flow and pace”. There are countless tools that the project manager can make us
    14 KB (2,353 words) - 11:19, 20 December 2018
  • # Create '''flow'''. ...adding element or activity is key in a Kaizen Event. Current relations and flow between the elements are thus mapped in order to understand where to make i
    33 KB (5,037 words) - 12:30, 20 December 2018
  • When all estimated cash flow is converted to AW value, the value is assigned to every year of the projec ...vestment (ROI), this is the rate that accomplished the balance of the cash flow of a particular project to exactly zero considering interest rate. The comp
    23 KB (3,634 words) - 14:07, 11 February 2019
  • ...'Project Mandate'''. A Project Mandate is a document containing sufficient information about the project, for example why the project is important for the organiz ...to prepare the next stage of the project and provide relevant and accurate information to the project board, so that the decision for project continuation can be
    23 KB (3,577 words) - 15:37, 18 December 2018
  • ...ictable source of issues is here checked. Furthermore, the process gathers information to update the plan for next stages in order to follow the actual progress a ...he project. It does so by enabling the Board to be provided with essential information from the project manager. So to review the correct execution of the current
    30 KB (4,935 words) - 15:40, 18 December 2018
  • ...alue Management]] technique. Thirdly, by using the '''''Project Management Information System''''' you can access performance indicators, records and financial da ...akdown Structure (WBS)]], Scope Baseline and the Work Packages, which give information of the tasks that need to be completed in terms of resources needed, time t
    36 KB (5,576 words) - 15:22, 18 December 2018
  • ...kes place. The different tasks in the projects need to proceed in the same flow to create a constant progression without wasting time. The method is visual ...ment during execution, nor does it create a continuous and thus economical flow of resources.
    27 KB (4,029 words) - 08:18, 2 September 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox