  • ...and applicability of the method. CPM is a step-by-step project management method for process planning. CPM was developed in 1956 by the E.I. du Pont de Nemo ... project duration time, so less acurate time estimates can be used in this method. PPS focus on estimates on both cost and time for design, construction and
    23 KB (3,695 words) - 14:56, 18 December 2018
  • ...re originally related to machine capacity but Toyota experienced that this method could be used on employees as well. Figure 4 shows how the development of t
    17 KB (2,674 words) - 15:49, 18 December 2018
  • ...ound studies for starting the project and for comparing these studies good method could be to use SWOT analysis. ...re several tools for solving a decision problem. Sometimes “the simpler method, the better” but complex decision problems may require complex methods, a
    17 KB (2,786 words) - 15:50, 18 December 2018
  • ...cause negative impacts on a project, has become a more cost-time efficient method. However, it requires high level of skills and knowledge to intepret the re
    20 KB (3,030 words) - 15:26, 18 December 2018
  • ... project <ref name="Bips"> Bips, Digital Constructions 2006, “3D Working Method 2006” </ref>. Using information levels when working with BIM tools, helps ...ling]]. Both these types of scheduling is based on the [[The Critical Path Method (CPM)]]. The critical path can be more accurately determined with the use o
    30 KB (4,385 words) - 14:55, 18 December 2018
  • Critical Chain Project Management(CCPM) is a method to plan, execute, manage, and control both single and multi projects, which The Critical Chain method mainly differs from the traditional methodologies* on the attention it plac
    29 KB (4,486 words) - 22:16, 28 September 2015
  • Benchmarking is a method of assessing the quality of a project’s management and learning from it f Even though the scope of Atkinson's method is logical, substantial disaggregation will still be needed for benchmarkin
    28 KB (4,139 words) - 15:27, 18 December 2018
  • ... Gantt chart, can almost be considered as a world standard even though the method is quite old. <ref name="Gantt.com,2016">Gantt.com (2016), ''What is a Gant ...(TPM), which were introduced in 1950s and it is known that since then this method has been used widely around the world.<ref name="Wysocki,R.K.2011">Wysocki,
    23 KB (3,723 words) - 21:50, 26 September 2016
  • This method has two limitations. It only works if the stabile dynamics exists by being
    13 KB (1,927 words) - 15:35, 18 December 2018
  • ...er new markets. More recently, organizations are integrating the Six Sigma method to the PMBOK project management process to try to gain maximum advantage. ...plates and advice, promotes appropriate use of tools such as critical path method, and perhaps performs periodic project reviews.
    8 KB (1,159 words) - 08:41, 22 September 2015
  • ... to exploration (eg reserves estimation), development (eg wrong extraction method or engineering complex challenges) and construction risks.
    13 KB (1,980 words) - 15:41, 18 December 2018
  • ...s in a production line. However TOC has evolved from a production schedule method to a project management methodology that can be used to schedule resources ...zation. One of the most known is “Drum-Buffer-Rope” (DBR), which is a method of synchronizing a production to the constraint while minimizing inventory
    21 KB (3,389 words) - 09:36, 17 May 2019
  • ...haracterizes the traditional model and its strict requirements the extreme method is more suitable to face the common unexpected changes that come up during Rapid planning is a project managing method used for developing project plans which is based on the Rapid Application D
    21 KB (3,455 words) - 15:18, 18 December 2018
  • * The part dedicated for the description of the method is clear but i think there is something missing to make the reader more con ...that the methodology itself is general because it is not a so "expertised" method and because it is not linked with a specific type of project management(For
    5 KB (949 words) - 16:11, 27 September 2015
  • ... for your article. Please make sure to follow the suggested structure for "method" articles. ... refering to a case, but since this is an atricle of type 1 where only the method is explained I chose not to.'''''
    7 KB (1,256 words) - 08:30, 24 September 2015
  • ...feel that for your article, you can either follow the "case study" or the "method" structure (as you could frame it from either perspective). Make it clear w *It’s hard to say if the article follows the method structure. It’s partly unfinished. Overall I would say that the written p
    6 KB (1,023 words) - 23:01, 28 September 2015
  • ...n ''Benefits'' and Limitations). Try to work this out to better fit in the method description theme. '''Answer''': '''Thanks for this comment, I feel that a '''Answer''': '''That was my initial title, but in order to relate with the "method" wiki type, I decided on process. Both are good. Agreeable!'''
    9 KB (1,453 words) - 03:25, 29 September 2015
  • ... comparison of standards, a particular phase and its methods, a particular method in a particular phase etc. If you want to describe an overall project RM ap
    374 B (66 words) - 09:07, 15 September 2015
  • ...ead thread throughout the article even though the suggested structure for "method" articles for this task is not completely followed. The author also has a w The article explains a method and gives few examples with good and developed explanations. To address cas
    9 KB (1,553 words) - 11:44, 29 September 2015
  • ...cle are not thoroughly explained (eg. buffer inventory, the critical chain method). Therefore, since the article is less than 3000 words in length, the defin
    8 KB (1,375 words) - 16:23, 1 October 2015