Search results

Jump to: navigation, search
  • ...topics are key: the project organization, the risk management, the quality control and the problem management.<ref name="NumberOne">“Fundamentals of the V-M ...o another test when ready. Last but not least, the quality controls should control the performance of single elementary parts of the final system, but also th
    25 KB (4,074 words) - 14:59, 18 December 2018
  • ...how to plan effectively. Every project relies in an effective planning and control process, even if the project is very small, it require planning. Planning p ...it is a comprehensive planning method that enables the project managers to control progress, it provides a description of product requirements, which skills n
    23 KB (3,577 words) - 15:37, 18 December 2018
  • ... the so-called PRINCE2 method, focused on processes and continue viability control. PRINCE2's relevance in this subject is bilt upon its universal nature, whi ... pledge to stay on time and within the budget, is able to ensure a perfect control, coordination and implementation of the project. Making this possible throu
    30 KB (4,935 words) - 15:40, 18 December 2018
  • ...s highly unpredictable and uncertain. Therefore, it is really important to control how the different tasks are progressing. In order to get an overview of the ...e time, the budgeted cost and the actual cost can also be balanced ''(Cost Control)''. Nevertheless, if these aspects are analysed separately, one can initial
    36 KB (5,576 words) - 15:22, 18 December 2018
  • ...ction Division-ASCE, 100(NCO3), p. 203–210</ref> was that scheduling and control in the construction industry should aim to complete the projects in the sho ====Control of resources and linkages====
    27 KB (4,029 words) - 08:18, 2 September 2022
  • ... to read. In these cases companies often need to hire specific managers to control the chart. For smaller companies this can be rather expensive.
    16 KB (2,841 words) - 15:04, 18 December 2018
  • === Project control === * Good control over the project from the beginning; weak points of the project located rig
    15 KB (2,461 words) - 15:29, 18 December 2018
  • ...on behalf of the US Air Force in connection with the Minuteman ICBM launch control system. It was very succesful, and were subsequently adopted by the Boing C
    16 KB (2,639 words) - 15:35, 18 December 2018
  • It takes a disciplined approach to manage and control projects carefully. The best way is to use a systematic and deliberate proc ...agement, Program Management was introduced as a higher layer of managerial control to guarantee and sustain alignment. So, to conciliate the Program and the
    18 KB (2,933 words) - 15:19, 18 December 2018
  • ... the process the amount of rework will be reduced which leads to increased control of costs as well as the ability to make risk management decisions based on
    17 KB (2,765 words) - 21:45, 21 September 2015
  • ... 1''' illustrates the use of a simple Gantt Chart from a Security & Access Control project. As it can be seen in the figure, all activities are marked with a
    19 KB (3,218 words) - 15:12, 18 December 2018
  • Goldratt describes three measurements that can control the manufacturing plant; Advantages of using the CCPM method is that the project manager is put in control of contingency and that it allows time to act if things slip. The example f
    27 KB (4,322 words) - 15:26, 18 December 2018
  • ... the smallest groupings of work tasks which are necessary for the level of control needed. Material, labor and other resources are allocated to each work pack There is a fundamental distinction between using a traditional cost control approach and the Earned Value management. In traditional project cost manag
    18 KB (2,857 words) - 15:51, 18 December 2018
  • ... document for everyone on the programme. It formed the basis of our change control. It captured the scope of work that we had to deliver, the cost of that wor ...ut of many individual projects (scale of a venue). In their effort to have control over each and every individual project, ODA together with CLM followed the
    30 KB (4,537 words) - 15:16, 18 December 2018
  • ... in cooperation with VDC is Lean Construction. This is because you can not control the activities if the knowledge sharing and communication is leaking in the
    19 KB (3,120 words) - 13:19, 18 December 2018
  • Furthermore, it is necessary to control the risk source through the project life cycle, since the probability of ri
    14 KB (2,243 words) - 15:02, 18 December 2018
  • ...thod, therefore this article was primarily limited by the type in order to control the flow to a certain level and keep the reader's focus. A greater depth of
    38 KB (5,492 words) - 15:21, 18 December 2018
  • ...achieved by a vertical line, indicating the time when the project progress control is made. ... its target within accepted timeframes and simultaneously will allow it to control all intermediary activities. The table below shows the immediately foregoin
    21 KB (3,419 words) - 15:14, 18 December 2018
  • ... fields. <ref name="booz"> Booz, Allen & Hamilton, 1963, PERT Planning and Control Procedures: Deere & Company, Moline, Illinois. </ref> Through PERT is possible to keep under control the project’s activities using the visual representation that keeps in mi
    39 KB (6,222 words) - 15:41, 18 December 2018
  • |Wrong specifications, missing competencies, insufficient or not effective control
    23 KB (3,693 words) - 15:45, 18 December 2018

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox