Search results

Jump to: navigation, search

Page title matches

  • ...ut how to practically apply it to a project? A specific example of project failure prior to introducing ISO 21500 will be provided to analyze which project ma ... May 2007, the merger of Chrysler and Daimler-Benz was dissolved. Can this failure be ascribed to mismanagement?
    26 KB (3,682 words) - 12:16, 20 December 2018
  • ... and have better justification for your succes and thereby avoid a greater failure in the future. This article is intended as inspiration to see how embracing ...hought for project managers to improve their end products by the Embracing Failure methodology. The article will seek to answer the following two research que
    19 KB (3,084 words) - 12:31, 20 December 2018
  • #REDIRECT [[Analyzing the failure of the DaimlerChrysler merger from a project management perspective]]
    103 B (13 words) - 14:26, 19 November 2014
  • ...EAs: Achieving Safe, Reliable, and Economical Products and Processes Using Failure Mode and Effects Analysis''", John Wiley & Sons, Inc.''' - this book outlin This article aims to show the application of the Failure Modes and Effects Analysis (FMEA) in project management, and in particular
    30 KB (4,526 words) - 15:48, 18 December 2018
  • ...nd reliability<ref name="Numberone">'''D. H Stamatis, 2003, 2. Edition, "''Failure Mode and Effect Analysis – FMEA from theory to execution''", ASQ Quality ..., which can be achieved through applying risk management tools such as: “Failure Modes and Effects Analysis (FMEA)”. FMEA is a systematic step-by-step app
    21 KB (3,316 words) - 17:46, 16 November 2018
  • ...oject risks before they occur, thus eliminating the probability of project failure. Studies have shown that one of the most effective tools that can prepare p ...bilities or any signs of threats at the outset that could lead to risks of failure in the project and its course of action, hence increasing the success rate
    26 KB (4,130 words) - 18:54, 19 May 2022
  • This article explores the risk assessment method Failure mode and effect analysis (FMEA). Before diving into the specifics of the to ...in different forms to address projects risks. The tool identifies possible failure modes, causes and resulting effects in relation to either a product, proces
    26 KB (4,305 words) - 21:38, 9 May 2023
  • ...dely used quality management tool for identifying and evaluating potential failure modes in a system, figuring out their causes and effects, estimating the ri ...n process. System FMEA examines the entire system and identifies potential failure sources that can impact the entire system <ref name="Brueggemann"/>.
    25 KB (3,908 words) - 21:52, 9 May 2023

Page text matches

  • ...ortant stakeholder, because the outcome of the project can become an utter failure if the accept of the client/end-user is taken for granted. This is why it i
    27 KB (3,921 words) - 12:34, 20 December 2018
  • ...ective for making projects successful as well as being the main reason for failure.
    23 KB (3,616 words) - 12:11, 20 December 2018
  • ...ere is a right answer to problems/situations, and that failure hereof is a failure in analysis on the underlying causal relationships<ref name="HBS"/>.
    21 KB (3,144 words) - 12:36, 20 December 2018
  • ...obability of success of a given project depends on the outcome (success or failure) of one or more of the other projects <ref name= "Chien" /><ref name= "Fox"
    28 KB (4,072 words) - 12:48, 20 December 2018
  • ...tp://en.wikipedia.org/wiki/Failure_mode,_effects,_and_criticality_analysis failure modes and effects and criticality analysis (FMECA)]:'''
    19 KB (2,957 words) - 11:21, 20 December 2018
  • ...PM software has been identified, namely 1) choosing the wrong software, 2) failure in the implementation phase, 3) underestimate the role of the decision make ...Successful PPM Implementation," IBM, January 2006</ref>. Four pitfalls for failure have been identified.
    18 KB (2,784 words) - 12:33, 20 December 2018
  • ...ut how to practically apply it to a project? A specific example of project failure prior to introducing ISO 21500 will be provided to analyze which project ma ... May 2007, the merger of Chrysler and Daimler-Benz was dissolved. Can this failure be ascribed to mismanagement?
    26 KB (3,682 words) - 12:16, 20 December 2018
  • ...ing and poor quality control. As a consequence, the root cause for project failure can usually be tracked back to a lack of proper Project Management. Therefo
    26 KB (4,088 words) - 12:07, 20 December 2018
  • ...and observed, the factors which influence whether a team was successful or failure. His research resulted in two main conclusions (Mullins 2007);
    17 KB (2,606 words) - 11:58, 20 December 2018
  • ...ter business results. A poor requirements management often lead to project failure<ref name="deux">Standish Group Report ''Chaos'', www.standishgroup.com (ava == Poor requirement management as a cause for project failure ==
    19 KB (2,807 words) - 12:15, 20 December 2018
  • ...e, such as [http://en.wikipedia.org/wiki/Failure_mode_and_effects_analysis Failure Mode and Effects Analysis (FMEA)] or Cost-Worth Analysis (CWA)<ref name="pr
    26 KB (3,905 words) - 12:36, 20 December 2018
  • ... and have better justification for your succes and thereby avoid a greater failure in the future. This article is intended as inspiration to see how embracing ...hought for project managers to improve their end products by the Embracing Failure methodology. The article will seek to answer the following two research que
    19 KB (3,084 words) - 12:31, 20 December 2018
  • : Studies the effect of the “Do” phase. It discusses the success and failure of the implemented countermeasures. The “Check” section of the A3-repor
    20 KB (3,185 words) - 12:28, 20 December 2018
  • ...ulture of accepting mistakes helps in [[creating a positive culture around failure in project management]]. This means that the project groups are usually not
    18 KB (2,922 words) - 11:50, 20 December 2018
  • ...ey, it the organization is working against Scrum the chances are higher of failure. <br>
    28 KB (4,770 words) - 12:40, 20 December 2018
  • * [[Failure mode and effect analysis]] (FMEA)
    20 KB (3,201 words) - 11:27, 20 December 2018
  • However, some previous research has found supporting evidence of a high failure rate on managing changes by the business <ref name="REF 1">''Exploring Stra While the failure of program management could appear when expected benefits of the project ar
    16 KB (2,434 words) - 11:10, 20 December 2018
  • #REDIRECT [[Analyzing the failure of the DaimlerChrysler merger from a project management perspective]]
    103 B (13 words) - 14:26, 19 November 2014
  • * '''Communication deficiency''': failure to communicate properly due to the elimination of body language or the incr
    26 KB (3,958 words) - 11:13, 20 December 2018
  • ...k created by the addition of the projects to the daily operations. Another failure was the fact that the employees have to work with people from other departm
    16 KB (2,721 words) - 12:08, 20 December 2018
  • ...on which they over predict the revenue stream of that project leading to a failure when running selected projects<ref>Society for Cost Analysis and Forecastin
    23 KB (3,634 words) - 14:07, 11 February 2019
  • ...m more tangible and to see if the theory can work in reality. Uncovering a failure of an idea at an early stage saves valuable resources. IDECO recommends, fo
    22 KB (3,476 words) - 16:56, 16 November 2018
  • * [[Creating a positive culture around failure in project management]] * [[Analyzing the failure of the DaimlerChrysler merger from a project management perspective]]
    3 KB (355 words) - 12:05, 30 August 2015
  • * [[The Failure Mode and effects analysis (FMEA) in product development projects]]
    4 KB (470 words) - 08:03, 25 August 2016
  • ...people do not understand the role they have each other it will end up in a failure<ref name="succp">Managing Successful Project with PRINCE2™, 2009, Office ...nisms it impossible to be implemented in a project. Moreover, the possible failure to understand specifically how it works could bring a lot of problems and d
    30 KB (4,935 words) - 15:40, 18 December 2018
  • [https://en.wikipedia.org/wiki/Failure_mode_and_effects_analysis Failure mode and effect analysis (FMEA)], [[Fault tree analysis]], [https://en.wiki
    36 KB (5,576 words) - 15:22, 18 December 2018
  • ...omeone else to unlock the situation, make the first move, can already be a failure.
    26 KB (4,278 words) - 15:19, 18 December 2018
  • ...ion interruptions such as meetings or unexpected problems such as computer-failure i.a.
    26 KB (4,022 words) - 15:39, 18 December 2018
  • ... for the minimal cut set to be found, allowing for a simple way of finding failure pathways that might otherwise have been missed.<ref name=RiskMan>Risk manag ... has to include a lot of different events to compensate for possible human failure, which clouds up the diagrams, or simplify it with a simple "Human error" s
    16 KB (2,639 words) - 15:35, 18 December 2018
  • ...iated to those factors will be the trigger for slow development and likely failure, as it will be discussed after defining the four factors. ...e of the employees. Also, over optimistic schedules increasing the risk of failure as well as poorly defined or changing standards of quality.
    17 KB (2,765 words) - 21:45, 21 September 2015
  • ...iew, a Startup that does not have a governance strategy it is condemned to failure, but not having a governance strategy can also be a governance strategy, th
    21 KB (3,127 words) - 15:01, 18 December 2018
  • Second, the efficiency is a huge driver to failure in projects. In the pursuit of efficiency, fewer and fewer things are contr ...the initial Lupo car, several other projects within VW prospered from this failure.
    17 KB (2,716 words) - 15:51, 18 December 2018
  • ...t chart '''does not highlight the WBS elements''' with the highest risk of failure or delay the project.
    21 KB (3,419 words) - 15:14, 18 December 2018
  • * It doesn't highlight the activities with the highest risk of failure or delay. ...oject, product or services means being reliable and experienced. Delays or failure can always happen but through detailed scheduling techniques it's possible
    39 KB (6,222 words) - 15:41, 18 December 2018
  • ...oject management, still a large number of construction projects experience failure or critical situations. During the front-end stage project, a constant unce ...future problems. Depending of the responses, action and decisions can be a failure or success for the project process as shown in figure 1.
    15 KB (2,228 words) - 15:10, 18 December 2018
  • *Preoccupation with failure
    25 KB (4,111 words) - 14:53, 18 December 2018
  • ...effective communication can lead to problems in new development or project failure. The findings demonstrated the importance of relationship between patterns
    21 KB (3,183 words) - 15:46, 18 December 2018
  • ...ess in a project's life cycle that aims to reduce the possibilities of its failure and increase the possibilities for its success. However, there are unexpect ...t is believed that spending time focusing on the elements that could cause failure, can yield important benefits.
    20 KB (3,030 words) - 15:26, 18 December 2018
  • 3. '''Failure to pass on early completion ''' The failure to pass on early completion and the propensity to multitask are two factors
    29 KB (4,486 words) - 22:16, 28 September 2015
  • ...basis of ([https://en.wikipedia.org/wiki/Failure_mode_and_effects_analysis Failure mode and effects analysis]). ...rix is used for a bigger purpose. It is used for a criticality analysis in Failure mode, effects, and criticality analysis ([https://en.wikipedia.org/wiki/Fai
    21 KB (3,422 words) - 15:25, 18 December 2018
  • | '''Preoccupation with failure''' |A preoccupation with failure focuses the organization to convert small errors and failures into organiza
    23 KB (3,439 words) - 15:54, 18 December 2018
  • ...alf of the projects result in being unsuccessful, and one of the causes of failure is poor or insufficient communication. A project can have a well-defined go
    933 B (133 words) - 22:59, 13 September 2015
  • ... of their recurrence rather than attempting to control potential causes of failure on a project-by-project basis.
    8 KB (1,159 words) - 08:41, 22 September 2015
  • ...iated to those factors will be the trigger for slow development and likely failure, as it will be discussed after defining the four factors. ...e of the employees. Also, over optimistic schedules increasing the risk of failure as well as poorly defined or changing standards of quality.
    21 KB (3,455 words) - 15:18, 18 December 2018
  • ...s a company can lose its identity which can eventually lead to the overall failure of the company <ref>[(Katsioloudes, M. I., 2006).]</ref>
    2 KB (262 words) - 13:00, 15 September 2015
  • ...f the projects result in being unsuccessful, and one of the main causes of failure is poor or insufficient communication. A project can have well-defined goal
    19 KB (2,722 words) - 14:58, 18 December 2018
  • ...d. It can be very costly for actors not to account for risk. The chance of failure in turnkey shows that project coalition actors, especially contractors, nee
    27 KB (4,284 words) - 15:26, 18 December 2018
  • ... milestones needs to be somehow challenging and carry a degree of risk for failure. This is done to inspire your team members to stay motivated and feel a gre
    12 KB (2,008 words) - 15:36, 18 December 2018
  • ...chieved in the design, process, procedure or system. Lastly, it identifies failure modes of a process, system or procedure, their causes and consequences. ...e may be used qualitatively to identify potential causes and pathways to a failure (the top event) or quantitatively to calculate the probability of the top e
    21 KB (3,034 words) - 15:12, 18 December 2018
  • ...knowledge and manage sources of uncertainty in order to reduce the risk of failure of either the project or the resulting product[4]. ...finition of project above explains, a project can be either a success or a failure since the project goals cannot be achieved.
    10 KB (1,435 words) - 13:30, 21 September 2015

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox