Search results

Jump to: navigation, search

Page title matches

  • ...ut how to practically apply it to a project? A specific example of project failure prior to introducing ISO 21500 will be provided to analyze which project ma ... May 2007, the merger of Chrysler and Daimler-Benz was dissolved. Can this failure be ascribed to mismanagement?
    26 KB (3,682 words) - 12:16, 20 December 2018
  • ... and have better justification for your succes and thereby avoid a greater failure in the future. This article is intended as inspiration to see how embracing ...hought for project managers to improve their end products by the Embracing Failure methodology. The article will seek to answer the following two research que
    19 KB (3,084 words) - 12:31, 20 December 2018
  • #REDIRECT [[Analyzing the failure of the DaimlerChrysler merger from a project management perspective]]
    103 B (13 words) - 14:26, 19 November 2014
  • ...EAs: Achieving Safe, Reliable, and Economical Products and Processes Using Failure Mode and Effects Analysis''", John Wiley & Sons, Inc.''' - this book outlin This article aims to show the application of the Failure Modes and Effects Analysis (FMEA) in project management, and in particular
    30 KB (4,526 words) - 15:48, 18 December 2018
  • ...nd reliability<ref name="Numberone">'''D. H Stamatis, 2003, 2. Edition, "''Failure Mode and Effect Analysis – FMEA from theory to execution''", ASQ Quality ..., which can be achieved through applying risk management tools such as: “Failure Modes and Effects Analysis (FMEA)”. FMEA is a systematic step-by-step app
    21 KB (3,316 words) - 17:46, 16 November 2018
  • ...oject risks before they occur, thus eliminating the probability of project failure. Studies have shown that one of the most effective tools that can prepare p ...bilities or any signs of threats at the outset that could lead to risks of failure in the project and its course of action, hence increasing the success rate
    26 KB (4,130 words) - 18:54, 19 May 2022
  • This article explores the risk assessment method Failure mode and effect analysis (FMEA). Before diving into the specifics of the to ...in different forms to address projects risks. The tool identifies possible failure modes, causes and resulting effects in relation to either a product, proces
    26 KB (4,305 words) - 21:38, 9 May 2023
  • ...dely used quality management tool for identifying and evaluating potential failure modes in a system, figuring out their causes and effects, estimating the ri ...n process. System FMEA examines the entire system and identifies potential failure sources that can impact the entire system <ref name="Brueggemann"/>.
    25 KB (3,908 words) - 21:52, 9 May 2023

Page text matches

  • ...ortant stakeholder, because the outcome of the project can become an utter failure if the accept of the client/end-user is taken for granted. This is why it i
    27 KB (3,921 words) - 12:34, 20 December 2018
  • ...ective for making projects successful as well as being the main reason for failure.
    23 KB (3,616 words) - 12:11, 20 December 2018
  • ...ere is a right answer to problems/situations, and that failure hereof is a failure in analysis on the underlying causal relationships<ref name="HBS"/>.
    21 KB (3,144 words) - 12:36, 20 December 2018
  • ...obability of success of a given project depends on the outcome (success or failure) of one or more of the other projects <ref name= "Chien" /><ref name= "Fox"
    28 KB (4,072 words) - 12:48, 20 December 2018
  • ...tp://en.wikipedia.org/wiki/Failure_mode,_effects,_and_criticality_analysis failure modes and effects and criticality analysis (FMECA)]:'''
    19 KB (2,957 words) - 11:21, 20 December 2018
  • ...PM software has been identified, namely 1) choosing the wrong software, 2) failure in the implementation phase, 3) underestimate the role of the decision make ...Successful PPM Implementation," IBM, January 2006</ref>. Four pitfalls for failure have been identified.
    18 KB (2,784 words) - 12:33, 20 December 2018
  • ...ut how to practically apply it to a project? A specific example of project failure prior to introducing ISO 21500 will be provided to analyze which project ma ... May 2007, the merger of Chrysler and Daimler-Benz was dissolved. Can this failure be ascribed to mismanagement?
    26 KB (3,682 words) - 12:16, 20 December 2018
  • ...ing and poor quality control. As a consequence, the root cause for project failure can usually be tracked back to a lack of proper Project Management. Therefo
    26 KB (4,088 words) - 12:07, 20 December 2018
  • ...and observed, the factors which influence whether a team was successful or failure. His research resulted in two main conclusions (Mullins 2007);
    17 KB (2,606 words) - 11:58, 20 December 2018
  • ...ter business results. A poor requirements management often lead to project failure<ref name="deux">Standish Group Report ''Chaos'', www.standishgroup.com (ava == Poor requirement management as a cause for project failure ==
    19 KB (2,807 words) - 12:15, 20 December 2018
  • ...e, such as [http://en.wikipedia.org/wiki/Failure_mode_and_effects_analysis Failure Mode and Effects Analysis (FMEA)] or Cost-Worth Analysis (CWA)<ref name="pr
    26 KB (3,905 words) - 12:36, 20 December 2018
  • ... and have better justification for your succes and thereby avoid a greater failure in the future. This article is intended as inspiration to see how embracing ...hought for project managers to improve their end products by the Embracing Failure methodology. The article will seek to answer the following two research que
    19 KB (3,084 words) - 12:31, 20 December 2018
  • : Studies the effect of the “Do” phase. It discusses the success and failure of the implemented countermeasures. The “Check” section of the A3-repor
    20 KB (3,185 words) - 12:28, 20 December 2018
  • ...ulture of accepting mistakes helps in [[creating a positive culture around failure in project management]]. This means that the project groups are usually not
    18 KB (2,922 words) - 11:50, 20 December 2018
  • ...ey, it the organization is working against Scrum the chances are higher of failure. <br>
    28 KB (4,770 words) - 12:40, 20 December 2018
  • * [[Failure mode and effect analysis]] (FMEA)
    20 KB (3,201 words) - 11:27, 20 December 2018
  • However, some previous research has found supporting evidence of a high failure rate on managing changes by the business <ref name="REF 1">''Exploring Stra While the failure of program management could appear when expected benefits of the project ar
    16 KB (2,434 words) - 11:10, 20 December 2018
  • #REDIRECT [[Analyzing the failure of the DaimlerChrysler merger from a project management perspective]]
    103 B (13 words) - 14:26, 19 November 2014
  • * '''Communication deficiency''': failure to communicate properly due to the elimination of body language or the incr
    26 KB (3,958 words) - 11:13, 20 December 2018
  • ...k created by the addition of the projects to the daily operations. Another failure was the fact that the employees have to work with people from other departm
    16 KB (2,721 words) - 12:08, 20 December 2018
  • ...on which they over predict the revenue stream of that project leading to a failure when running selected projects<ref>Society for Cost Analysis and Forecastin
    23 KB (3,634 words) - 14:07, 11 February 2019
  • ...m more tangible and to see if the theory can work in reality. Uncovering a failure of an idea at an early stage saves valuable resources. IDECO recommends, fo
    22 KB (3,476 words) - 16:56, 16 November 2018
  • * [[Creating a positive culture around failure in project management]] * [[Analyzing the failure of the DaimlerChrysler merger from a project management perspective]]
    3 KB (355 words) - 12:05, 30 August 2015
  • * [[The Failure Mode and effects analysis (FMEA) in product development projects]]
    4 KB (470 words) - 08:03, 25 August 2016
  • ...people do not understand the role they have each other it will end up in a failure<ref name="succp">Managing Successful Project with PRINCE2™, 2009, Office ...nisms it impossible to be implemented in a project. Moreover, the possible failure to understand specifically how it works could bring a lot of problems and d
    30 KB (4,935 words) - 15:40, 18 December 2018
  • [https://en.wikipedia.org/wiki/Failure_mode_and_effects_analysis Failure mode and effect analysis (FMEA)], [[Fault tree analysis]], [https://en.wiki
    36 KB (5,576 words) - 15:22, 18 December 2018
  • ...omeone else to unlock the situation, make the first move, can already be a failure.
    26 KB (4,278 words) - 15:19, 18 December 2018
  • ...ion interruptions such as meetings or unexpected problems such as computer-failure i.a.
    26 KB (4,022 words) - 15:39, 18 December 2018
  • ... for the minimal cut set to be found, allowing for a simple way of finding failure pathways that might otherwise have been missed.<ref name=RiskMan>Risk manag ... has to include a lot of different events to compensate for possible human failure, which clouds up the diagrams, or simplify it with a simple "Human error" s
    16 KB (2,639 words) - 15:35, 18 December 2018
  • ...iated to those factors will be the trigger for slow development and likely failure, as it will be discussed after defining the four factors. ...e of the employees. Also, over optimistic schedules increasing the risk of failure as well as poorly defined or changing standards of quality.
    17 KB (2,765 words) - 21:45, 21 September 2015
  • ...iew, a Startup that does not have a governance strategy it is condemned to failure, but not having a governance strategy can also be a governance strategy, th
    21 KB (3,127 words) - 15:01, 18 December 2018
  • Second, the efficiency is a huge driver to failure in projects. In the pursuit of efficiency, fewer and fewer things are contr ...the initial Lupo car, several other projects within VW prospered from this failure.
    17 KB (2,716 words) - 15:51, 18 December 2018
  • ...t chart '''does not highlight the WBS elements''' with the highest risk of failure or delay the project.
    21 KB (3,419 words) - 15:14, 18 December 2018
  • * It doesn't highlight the activities with the highest risk of failure or delay. ...oject, product or services means being reliable and experienced. Delays or failure can always happen but through detailed scheduling techniques it's possible
    39 KB (6,222 words) - 15:41, 18 December 2018
  • ...oject management, still a large number of construction projects experience failure or critical situations. During the front-end stage project, a constant unce ...future problems. Depending of the responses, action and decisions can be a failure or success for the project process as shown in figure 1.
    15 KB (2,228 words) - 15:10, 18 December 2018
  • *Preoccupation with failure
    25 KB (4,111 words) - 14:53, 18 December 2018
  • ...effective communication can lead to problems in new development or project failure. The findings demonstrated the importance of relationship between patterns
    21 KB (3,183 words) - 15:46, 18 December 2018
  • ...ess in a project's life cycle that aims to reduce the possibilities of its failure and increase the possibilities for its success. However, there are unexpect ...t is believed that spending time focusing on the elements that could cause failure, can yield important benefits.
    20 KB (3,030 words) - 15:26, 18 December 2018
  • 3. '''Failure to pass on early completion ''' The failure to pass on early completion and the propensity to multitask are two factors
    29 KB (4,486 words) - 22:16, 28 September 2015
  • ...basis of ([https://en.wikipedia.org/wiki/Failure_mode_and_effects_analysis Failure mode and effects analysis]). ...rix is used for a bigger purpose. It is used for a criticality analysis in Failure mode, effects, and criticality analysis ([https://en.wikipedia.org/wiki/Fai
    21 KB (3,422 words) - 15:25, 18 December 2018
  • | '''Preoccupation with failure''' |A preoccupation with failure focuses the organization to convert small errors and failures into organiza
    23 KB (3,439 words) - 15:54, 18 December 2018
  • ...alf of the projects result in being unsuccessful, and one of the causes of failure is poor or insufficient communication. A project can have a well-defined go
    933 B (133 words) - 22:59, 13 September 2015
  • ... of their recurrence rather than attempting to control potential causes of failure on a project-by-project basis.
    8 KB (1,159 words) - 08:41, 22 September 2015
  • ...iated to those factors will be the trigger for slow development and likely failure, as it will be discussed after defining the four factors. ...e of the employees. Also, over optimistic schedules increasing the risk of failure as well as poorly defined or changing standards of quality.
    21 KB (3,455 words) - 15:18, 18 December 2018
  • ...s a company can lose its identity which can eventually lead to the overall failure of the company <ref>[(Katsioloudes, M. I., 2006).]</ref>
    2 KB (262 words) - 13:00, 15 September 2015
  • ...f the projects result in being unsuccessful, and one of the main causes of failure is poor or insufficient communication. A project can have well-defined goal
    19 KB (2,722 words) - 14:58, 18 December 2018
  • ...d. It can be very costly for actors not to account for risk. The chance of failure in turnkey shows that project coalition actors, especially contractors, nee
    27 KB (4,284 words) - 15:26, 18 December 2018
  • ... milestones needs to be somehow challenging and carry a degree of risk for failure. This is done to inspire your team members to stay motivated and feel a gre
    12 KB (2,008 words) - 15:36, 18 December 2018
  • ...chieved in the design, process, procedure or system. Lastly, it identifies failure modes of a process, system or procedure, their causes and consequences. ...e may be used qualitatively to identify potential causes and pathways to a failure (the top event) or quantitatively to calculate the probability of the top e
    21 KB (3,034 words) - 15:12, 18 December 2018
  • ...knowledge and manage sources of uncertainty in order to reduce the risk of failure of either the project or the resulting product[4]. ...finition of project above explains, a project can be either a success or a failure since the project goals cannot be achieved.
    10 KB (1,435 words) - 13:30, 21 September 2015
  • ...n order to control projects of this type, and can be the outcome of either failure or success.
    13 KB (2,168 words) - 14:54, 18 December 2018
  • ...EAs: Achieving Safe, Reliable, and Economical Products and Processes Using Failure Mode and Effects Analysis''", John Wiley & Sons, Inc.''' - this book outlin This article aims to show the application of the Failure Modes and Effects Analysis (FMEA) in project management, and in particular
    30 KB (4,526 words) - 15:48, 18 December 2018
  • In many cases, failure of commitment from top management will result in some individual trials to
    30 KB (4,402 words) - 15:50, 18 December 2018
  • ... of their recurrence rather than attempting to control potential causes of failure on a project-by-project basis.
    20 KB (2,923 words) - 00:05, 29 September 2015
  • ...sful oil extraction was large enough for the lenders to accept the risk of failure. ...nly after all other debts and interest is paid off. In the case of project failure dividends may not be returned on the equity so this is where the risk lies.
    27 KB (4,209 words) - 15:17, 18 December 2018
  • 3. '''Failure to pass on early completion ''' The failure to pass on early completion and the propensity to multitask are two factors
    29 KB (4,519 words) - 15:45, 18 December 2018
  • First, people on carriers are preoccupied with failure. Every landing is graded and the grades are used to improve performance. Ev
    6 KB (1,027 words) - 21:42, 28 September 2015
  • ... of their recurrence rather than attempting to control potential causes of failure on a project-by-project basis.
    20 KB (2,929 words) - 15:28, 18 December 2018
  • ...igned, and if organizational members are prepared to take risks and accept failure as an opportunity for learning and development <ref name="Managing Innovati
    26 KB (3,782 words) - 13:11, 18 December 2018
  • ...s and unwanted events must be carried out, this can be done by using FMEA (Failure mode and effects analysis). ... the delivery date can be weather conditions, mechanical failure, personal failure (accidents) etc. If any of these threats occur it will lead to a delay for
    15 KB (2,375 words) - 12:49, 18 December 2018
  • ...tionally, Lukas (2008) points out several reasons which in reality lead to failure of EVA<ref name="Lukas" />:
    29 KB (4,294 words) - 09:35, 17 May 2019
  • ...is to ensure that everyone has an opportunity to take action if there is a failure or delay. Furthermore, the process manager is the one which controls the pr ... which aims to improve the construction process in the future, so that the failure in the workflow can be improved. It is also important that PPC doesn't lead
    16 KB (2,706 words) - 12:46, 18 December 2018
  • ...ol to provide an overall analysis of a whole project as it starts from the failure of a small component and determines its consequences for the whole project.
    37 KB (6,103 words) - 14:02, 18 December 2018
  • ...ainlinks">[https://en.wikipedia.org/wiki/Failure_mode_and_effects_analysis Failure Mode and Effect Analysis (FMEA)]</span> or FMECA where the "C" stands for C ...different. The ETA branches represent the impact if it is ether success or failure event. This technique should be applied early in the stage and therefore mi
    32 KB (5,360 words) - 12:41, 18 December 2018
  • |High failure rates. which creates high downstream failure rates.
    33 KB (4,703 words) - 12:44, 18 December 2018
  • ...keholders compared to other industries. The consequences for a requirement failure from a stakeholder in a construction project are also often more severe tha ... of not working with stakeholder management can in the worst cases lead to failure of the construction project. Some of the other challenges in working with s
    19 KB (2,913 words) - 14:12, 18 December 2018
  • The process of controlling is fundamental to the success or failure of any project. Therefore, it is likewise important to measure the project
    39 KB (6,064 words) - 13:08, 18 December 2018
  • | Lack of leadership or failure in management commitment or non-supportive organisational climate ...ing exchange of ideas and experiences which include stories of success and failure.
    26 KB (4,273 words) - 13:59, 18 December 2018
  • ...on’s Law'', and ''Self-protection''. These three syndromes can lead to a failure of completing activities early.
    41 KB (6,367 words) - 17:31, 19 February 2023
  • ...he solutions as the improvement efforts are allowed to lead to failure and failure is even a welcomed learning. The efforts themselves are encouraged to be sm
    24 KB (3,865 words) - 12:48, 18 December 2018
  • ...of it being constructive. Thus, the drawback concerning this aspect is the failure to distinguish between individuals and cater to their needs.
    36 KB (5,281 words) - 13:10, 18 December 2018
  • *'''Failure to conclude risks and uncertainty:''' Ignoring the risks and uncertainties
    19 KB (3,092 words) - 13:57, 18 December 2018
  • A litterature review also shows that there are two main factors leading to a failure of a portfolio to contribute to the implementation of the chosen strategy. ...more losses, for instance in case of technical failure (for instance tests failure, or other technical risks) or any economic risk, such as negative market va
    26 KB (4,014 words) - 14:12, 18 December 2018
  • ...ere are some critical aspects to roadmaps, that determine their success or failure within an organisation and should be kept in mind.<ref name="Milosevic"/>
    29 KB (4,260 words) - 14:04, 18 December 2018
  • On one hand most of the parameters for the later success or failure are set in the first two stages. On the other hand project managers are rel
    34 KB (5,155 words) - 00:14, 6 November 2018
  • ...f proper support from the business stakeholders would probably lead to the failure of the project.<ref> Making Sense of Agile Project Management: Balancing Co
    28 KB (4,298 words) - 14:07, 18 December 2018
  • *Is there a high risk of failure?
    21 KB (3,393 words) - 14:13, 18 December 2018
  • Kaplan and Norton indicated the most common failure causes as:
    25 KB (3,970 words) - 14:01, 18 December 2018
  • ...rs when funds are added. Dogs are not necessary at all, they are a sign of failure and should be liquidated.
    24 KB (3,919 words) - 12:32, 18 December 2018
  • ...: the team must be free from any mistakes and have to be able to solve any failure that could happen. After this, you also have to take care of the '''Belongi
    32 KB (5,070 words) - 12:42, 18 December 2018
  • ...ssibility to consolidate activities and prevent double-work. Thus possible failure can be avoided and the possibility of project success is increased. However
    38 KB (5,626 words) - 14:08, 18 December 2018
  • ...oject management arose as a result of the eighties’ tendency for project failure and budget overrun as a consequence <ref name="Jud"> [''Project Management
    21 KB (3,418 words) - 14:08, 18 December 2018
  • ...ompanies, these projects are of crucial importance to the organisation and failure of these projects has severe consequences, stressing the need for effective
    29 KB (4,536 words) - 12:48, 18 December 2018
  • *DOE (Design of Experiments), FMEA (Failure Mode Effects Analysis) *FMEA - ''Failure Mode Effects Analysis''
    24 KB (3,649 words) - 12:46, 18 December 2018
  • Failure costs can be further subdivided into two groups: internal and external fail ...nd before the product or service reaches the customer. Example of internal failure includes, scrap and rework costs, downgrading costs, repair costs, and corr
    23 KB (3,388 words) - 14:09, 18 December 2018
  • ...uck in '''seeing members as competitors''', which can lead to the team’s failure. It is a critical but also constructive stage when successfully passed. ... what is the attitude toward failure?
    23 KB (3,518 words) - 13:00, 13 May 2019
  • ...sector of the size and history like the British construction industry, the failure represented an inflection point in several senses. Some are mentioned in th
    33 KB (5,053 words) - 13:00, 18 December 2018
  • A bad leadership can be a failure for the company´s journey for different aspects:
    28 KB (4,202 words) - 12:47, 18 December 2018
  • ...e, but the mutual bond and respect might be difference between success and failure. If the project manager can navigate the expert knowledge of the project te
    28 KB (4,649 words) - 09:01, 7 April 2023
  • ...crucial to stay within the budget's limits, therefore a top event could be failure to meet the expected budget.<ref name="krysinski" /> Only one top event can ...easing. The increase in prices will then lead to the top event, which is a failure to complete the project within the budget.
    29 KB (4,848 words) - 12:37, 18 December 2018
  • ...me. Completion of tasks depends on a number of factors. On the other hand, failure to meet the deadlines in a project can create adverse effects. As the sayin =='''Examples of Failure in managing constraints'''==
    28 KB (4,076 words) - 14:09, 18 December 2018
  • | '''Preoccupation with failure''' |A preoccupation with failure focuses the organization to convert small errors and failures into organiza
    37 KB (5,425 words) - 13:00, 18 December 2018
  • ...ut when we look at how the project was managed, it will be seen as a total failure, mostly due to poor planning in the inception phase. Detailed plans were in
    22 KB (3,463 words) - 14:07, 18 December 2018
  • ...on do not align, the strategy change will most often develop into complete failure.<ref name=Blue_Ocean_Strategy>W. Chan Kim & Renée Mauborgne (2015) The Blu
    26 KB (4,049 words) - 14:07, 18 December 2018
  • ...mand for more complex and unique constructions increases, and the risk for failure increases with it. Furthermore, the nature of construction projects, with t ...d plumbing drawings as external references (xrefs), leaving many steps for failure).
    31 KB (4,891 words) - 14:01, 18 December 2018
  • ...:''' Information incompatibility; Software incompatibility; Communications failure; Security issues *Lack of clear information flow paths, failure of process to produce information needed
    23 KB (3,502 words) - 12:43, 18 December 2018
  • ...esired end state. If this isn’t done, your project can not be rated as a failure or success, if you don’t have a target.
    20 KB (3,294 words) - 17:53, 4 March 2019
  • ...lders in an appropriate manner can mean the difference between success and failure''”. <ref name="PMI">Project Management Institute, ''A Guide to the Projec
    21 KB (3,160 words) - 15:08, 23 February 2021
  • ...program ends within the expected budget and perfectly in time, it may be a failure in terms of additional value acquired by the company. <br /> ...rary, it could happen that the outcomes provided by a program outweigh the failure in terms of cost and timing. <br />
    28 KB (4,492 words) - 21:35, 4 March 2019
  • ...equests are results of an error in defining the scope of the project, e.g. failure to include a required feature in the design, or a change which adds more va
    35 KB (5,350 words) - 16:21, 4 March 2019

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox