Search results

Jump to: navigation, search

Page title matches

  • ...te in order to complete the project within the available time. Furthermore CPM can be used to monitor if the project follows the time schedule and it allo CPM is one of the fundamental concepts in traditional project management. CPM utilizes tasks duration as the parameter for optimization of the schedule,
    23 KB (3,695 words) - 14:56, 18 December 2018
  • ...andling problems with stochastic activities' times''' while they have used CPM for '''problems with deterministic times'''. In PERT networks, the activities '''were represented with edges''' while in CPM networks, the '''nodes''' symbolized the activities.
    26 KB (4,197 words) - 15:11, 18 December 2018
  • ...iki/Critical_path_method <b>Critical Path Method (CPM)</b>]</span>. The <b>CPM</b> is a mathematically-network based algorithm in which can be used for pl Based on acquired information from the '''CPM''', the next question could be if it is possible to shorten the project in
    40 KB (6,164 words) - 14:05, 18 December 2018
  • ...cts and so on. <ref name=''math''> Anon. (n.d.) ''Project Scheduling: PERT/CPM.'' Retrieved 08.09.2016 from http://www.math.csusb.edu/faculty/prakash/611/ ...ion/critical-path-method-CPM.html </ref> Therefore, the key essence of the CPM is to compute the shortest time, which a project can take, by valuating a t
    28 KB (4,474 words) - 13:58, 18 December 2018
  • ...nning'', in other words the 3D is linked to the time schedule. The methods CPM and 4D-Planning will be explained with a historical perspective while the m ==Critical path method (CPM)==
    14 KB (2,410 words) - 10:23, 20 June 2017
  • ...nning'', in other words the 3D is linked to the time schedule. The methods CPM and 4D-Planning will be explained with a historical perspective while the m ==Critical path method (CPM)==
    14 KB (2,410 words) - 11:16, 20 June 2017
  • ...he time schedule which is linked to it, that gives 4D-Planning.The methods CPM and 4D-Planning will be explained, while the methods will be seen from a hi ==Critical path method (CPM)==
    17 KB (2,904 words) - 12:31, 19 November 2018
  • '''Critical Path Method or CPM''', is a tool used in the planning and management of different types of pro ... cost. This method has since been developed into '''Critical Path Method, (CPM)'''.
    15 KB (2,346 words) - 19:01, 17 November 2018
  • [[Category:Project Management]][[Category:Management]][[Category:CPM]] ...on, 2013, ISBN-13: 978-1-935589-67-9 '' </ref>. This article describes the CPM methodology, provides an example of this technique so as to be perceivable,
    21 KB (3,516 words) - 15:13, 16 November 2018
  • ...rt]] and CPM network diagram<ref name="ssrg" />. However, criticism of the CPM has been raised, specifically in the case of construction projects, for not ...nage workflows and may therefore be expected to be a useful alternative to CPM. It implies a shift in focus from primarily the activities to the flow of w
    33 KB (5,149 words) - 17:23, 16 November 2018
  • ...s to introduce practitioners to the concept of Complex Project Management (CPM) and propose tools for analysing project complexity in the early stage of a
    21 KB (3,157 words) - 16:50, 28 February 2021
  • Lag, lead and CPM
    17 B (4 words) - 17:18, 17 March 2022
  • ...ill be Precedence Diagram Method (PDM) including Critical Path Management (CPM) to get a quantified take on possible scheduling risks that might be faced< ...sier to grasp if examples are given. To accommodate this, a video guide on CPM calculations in a PDM with lag and lead has been made and embedded.
    24 KB (3,868 words) - 20:20, 27 March 2022
  • ...ackling complex projects and a thought example of a project where PERT and CPM is applied to estimate the duration. The manager can through the work of PERT and CPM analyze the tasks in the network diagram to reduce project deadline or impr
    22 KB (3,452 words) - 20:27, 26 February 2023

Page text matches

  • ** CPM - Critical Path Method (http://en.wikipedia.org/wiki/Critical_path_method).
    33 KB (5,037 words) - 12:30, 20 December 2018
  • ...The history of modern project management. Key milestones in the early PERT/CPM/PDM days: how did we get here—where do we go?", Project Management Journa
    15 KB (2,447 words) - 17:02, 16 November 2018
  • * [[PERT/CPM]] * [[The Critical Path Method (CPM)]]
    4 KB (470 words) - 08:03, 25 August 2016
  • |[[The Critical Path Method (CPM)]] ... scheduling in particular. It is not meant to be a detailed explanation of CPM, but merely a refresher, focusing on how the schedule is used in project co
    36 KB (5,576 words) - 15:22, 18 December 2018
  • ...source planning of projects. Thus, some critique has been raised about the CPM-method in relation to construction projects, as it does not sufficiently su ...of workflows and could therefore be expected to be a viable alternative to CPM. The construction industry struggles with the subsequent delays and budget
    27 KB (4,029 words) - 08:18, 2 September 2022
  • ...s category includes also other tools like the [[ The Critical Path Method (CPM) | Critical Path Analysis ]], the matrix-based Design Structure Matrix, pet * [[ The Critical Path Method (CPM) ]]
    15 KB (2,461 words) - 15:29, 18 December 2018
  • ... An activity that is on the critical path (see [[The Critical Path Method (CPM)]]) has no float. In addition to float there a sub-term called free float w ...t possible completion date of the project (See [[The Critical Path Method (CPM)]] for more information on this topic).
    19 KB (3,218 words) - 15:12, 18 December 2018
  • In the [[The Critical Path Method (CPM)]], a network diagram for a project is constructed, and its activities are
    27 KB (4,322 words) - 15:26, 18 December 2018
  • ... with other scheduling techniques, for example [[The Critical Path Method (CPM)]], it could provide invaluable insight into the true schedule status of th
    18 KB (2,857 words) - 15:51, 18 December 2018
  • '''Critical Path Method (CPM)''' is a project management method created in 1958 in American company DuPo ...ect on time and within the budget. Methodology of '''creation of the basic CPM direct acyclic graph''' (DAG) is presented in a way of short step-by-step t
    28 KB (4,436 words) - 15:34, 18 December 2018
  • ...>[https://en.wikipedia.org/wiki/Critical_path_method Critical Path Method (CPM)]</span> . The results of calculations appear in the following table. ...tt chart. A very useful book for this method is the ''Introduction to PERT-CPM'' by ''Baker, B.N.'' published in 1964.
    21 KB (3,419 words) - 15:14, 18 December 2018
  • ...ources. Techniques such as PERT (Program Evaluation and Review Technique), CPM (Critical Path Method) and GANTT are the most used to plan into details a p ...activities and links. An important tool, mostly used together with PERT is CPM that selects the activities that are mainly critical: their delays affect t
    39 KB (6,222 words) - 15:41, 18 December 2018
  • The CPM can be used as input for developing a 3 step quantitative tool for the sche
    936 B (140 words) - 17:25, 13 September 2015
  • ...te in order to complete the project within the available time. Furthermore CPM can be used to monitor if the project follows the time schedule and it allo CPM is one of the fundamental concepts in traditional project management. CPM utilizes tasks duration as the parameter for optimization of the schedule,
    23 KB (3,695 words) - 14:56, 18 December 2018
  • ...Both these types of scheduling is based on the [[The Critical Path Method (CPM)]]. The critical path can be more accurately determined with the use of BIM
    30 KB (4,385 words) - 14:55, 18 December 2018
  • ...er, with traditional methods it is referred to [[The Critical Path Method (CPM)]] and [[Program evaluation and review technique (PERT)]]
    29 KB (4,486 words) - 22:16, 28 September 2015
  • ...he critical chain use reduced activity duration estimates compared to PERT-CPM. In other words it means that the critical chain constitutes the constraint ...thumb|center|upright=4|alt=Con| Figure 3 CPPM compared to traditional PERT-CPM]]
    21 KB (3,389 words) - 09:36, 17 May 2019
  • ... [https://en.wikipedia.org/wiki/Critical_path_method Critical Path Method (CPM)] and [http://apppm.man.dtu.dk/index.php/Program_evaluation_and_review_tech
    11 KB (1,768 words) - 15:49, 18 December 2018
  • ...er, with traditional methods it is referred to [[The Critical Path Method (CPM)]] and [[Program evaluation and review technique (PERT)]]
    29 KB (4,519 words) - 15:45, 18 December 2018
  • ...andling problems with stochastic activities' times''' while they have used CPM for '''problems with deterministic times'''. In PERT networks, the activities '''were represented with edges''' while in CPM networks, the '''nodes''' symbolized the activities.
    26 KB (4,197 words) - 15:11, 18 December 2018
  • |[[How PERT builds up on CPM]] |[[The Critical Path Method (CPM) in Project Management]]
    9 KB (1,149 words) - 16:23, 1 September 2017
  • ...ch?v=18GWVtVAAzs|600|center|'''Video 1:'''Visual way of explaining LBS vs. CPM.|frame}}
    17 KB (2,637 words) - 12:45, 18 December 2018
  • ...iki/Critical_path_method <b>Critical Path Method (CPM)</b>]</span>. The <b>CPM</b> is a mathematically-network based algorithm in which can be used for pl Based on acquired information from the '''CPM''', the next question could be if it is possible to shorten the project in
    40 KB (6,164 words) - 14:05, 18 December 2018
  • ...her methods. One tool typically used with EVM is the critical-path method (CPM), which can use the EVM's WBS activities as input. Other techniques that ca
    39 KB (6,064 words) - 13:08, 18 December 2018
  • ...strict schedules through [[The Critical Path Method in project planning]] (CPM) or [[Program evaluation and review technique (PERT)]], lack of efficiency '''[[The Critical Path Method in project planning]] (CPM)''' is a traditional scheduling and planning method. The method is based on
    41 KB (6,367 words) - 17:31, 19 February 2023
  • ... path cannot start until the predecessor activity is completed. When using CPM to plan a project a graphical diagram is often represented showing how each ...dressed. The main focus of this article is to walk the readers through the CPM process step by step with the aim that they will be able to execute the met
    36 KB (5,735 words) - 12:44, 18 December 2018
  • ...>[https://en.wikipedia.org/wiki/Critical_path_method critical path method(CPM)]</span> , with the necessary resources integrated into the CPM model, and the sum of these resources must sum to 100% of the contract valu
    34 KB (5,199 words) - 14:10, 18 December 2018
  • ...cts and so on. <ref name=''math''> Anon. (n.d.) ''Project Scheduling: PERT/CPM.'' Retrieved 08.09.2016 from http://www.math.csusb.edu/faculty/prakash/611/ ...ion/critical-path-method-CPM.html </ref> Therefore, the key essence of the CPM is to compute the shortest time, which a project can take, by valuating a t
    28 KB (4,474 words) - 13:58, 18 December 2018
  • ...ref> The Associated General Contractors of America(AGC) (1976). The Use of CPM In Construction.</ref> ...ce availability.” <ref> Kim, Kyunghwan (2003). “A Resource-constrained CPM (RCPM) Scheduling and Control Technique with Multiple Calendars” - Virgin
    18 KB (2,690 words) - 12:47, 18 December 2018
  • With the introduction of CPM/PERT in 1958’, the use of technology has been gradually extended in the P ...wed the status of research SNA in construction project management context (CPM) that is coincident with the aim of this article.
    35 KB (4,877 words) - 12:34, 18 December 2018
  • #REDIRECT [[How PERT builds up on CPM]]
    39 B (7 words) - 20:04, 25 September 2016
  • |[[Time management by CPM and 4D-Planning]]
    4 KB (570 words) - 12:27, 8 December 2017
  • ...on Beta distribution]</span> <ref name="PERT_CPM">Project Scheduling: PERT/CPM, Available at http://learngroup.org/uploads/2015-01-02/Lecture_-_Project_Ma
    25 KB (4,174 words) - 19:12, 17 November 2018
  • ... <span class="plainlinks">[http://apppm.man.dtu.dk/index.php/PERT/CPM PERT/CPM]</span>. When the tasks are defined and the durations are specified, the ta [[File:CPM Winch.PNG|350px|thumb|center|Figure 1: Visualization of the critical path m
    19 KB (3,131 words) - 12:41, 19 November 2018
  • ...imate the time used and needed for activities dependent on each other. But CPM is limited in the way that it only looks at sequential activities, though i ...rt may be of use to schedule the work flow of different tasks. Otherwise a CPM analysis (Critical Path Method), CCM analysis ([[The Critical Chain Method|
    24 KB (3,853 words) - 13:31, 19 November 2018
  • ...nning'', in other words the 3D is linked to the time schedule. The methods CPM and 4D-Planning will be explained with a historical perspective while the m ==Critical path method (CPM)==
    14 KB (2,410 words) - 10:23, 20 June 2017
  • ...l methods of planning like [[Gantt Chart]] and [[The Critical Path Method (CPM)]] to address difficulties regarding synchronization either with the desig ...dered a promising alternative to activity-based scheduling method, such as CPM, combining the time of an activity with the location that this activity is
    25 KB (3,674 words) - 19:21, 20 November 2018
  • ...nning'', in other words the 3D is linked to the time schedule. The methods CPM and 4D-Planning will be explained with a historical perspective while the m ==Critical path method (CPM)==
    14 KB (2,410 words) - 11:16, 20 June 2017
  • ...he time schedule which is linked to it, that gives 4D-Planning.The methods CPM and 4D-Planning will be explained, while the methods will be seen from a hi ==Critical path method (CPM)==
    17 KB (2,904 words) - 12:31, 19 November 2018
  • |[[Critical Path Method (CPM)]]
    6 KB (763 words) - 21:24, 2 October 2017
  • ...in project management and commonly together with the critical path method (CPM) to control, plan and schedule. ... for each activity. However, PERT use has been increasingly applied to all CPM scheduling.[1]
    14 KB (2,198 words) - 18:26, 17 November 2018
  • ...made on the early or late actualization of the [[The Critical Path Method (CPM)|critical path]]. The slack of of near-critical path can be measured in rel
    21 KB (3,096 words) - 09:23, 30 September 2017
  • ...[ONLINE] Accessed September 21st 2017</ref> Post WWII, methods as PERT and CPM was invented, introducing mathematically based project management, still ma
    22 KB (3,261 words) - 18:44, 17 November 2018
  • ; Use [[The Critical Path Method (CPM)]]
    17 KB (2,455 words) - 18:57, 17 November 2018
  • '''Critical Path Method or CPM''', is a tool used in the planning and management of different types of pro ... cost. This method has since been developed into '''Critical Path Method, (CPM)'''.
    15 KB (2,346 words) - 19:01, 17 November 2018
  • ...h as Program Evaluation and Review Technique (PERT), Critical Path Method (CPM), or Milestone Trend Analysis. These tools together with the settled milest
    24 KB (3,726 words) - 20:42, 19 March 2022
  • |[[Programming a project with the CPM]] |[[Construction scheduling using Location Based Scheduling instead of CPM]]
    8 KB (1,000 words) - 09:28, 18 February 2019
  • ...ith scheduling software, a simple example at how to set up a visual of the CPM is shown below excelPIC
    19 KB (2,905 words) - 17:30, 16 November 2018
  • ... Evaluation and Review Technique''' (PERT) and '''Critical Path Method''' (CPM). It will also answer the question "''Why cash flow and payment milestones ...e used for Payment Milestones establishment is '''Critical Path Method''' (CPM).
    18 KB (2,744 words) - 17:21, 16 November 2018
  • ==New title: Scheduling using Location Based Scheduling instead of CPM== ...rt]] and CPM network diagram<ref name="ssrg" />. However, criticism of the CPM has been raised, specifically in the case of construction projects, for not
    33 KB (5,054 words) - 08:38, 26 February 2018
  • [[Category:Project Management]][[Category:Management]][[Category:CPM]] ...on, 2013, ISBN-13: 978-1-935589-67-9 '' </ref>. This article describes the CPM methodology, provides an example of this technique so as to be perceivable,
    21 KB (3,516 words) - 15:13, 16 November 2018
  • ...ject with Critical Phat Method (CPM) or PERT Method that is a extension of CPM. The knowledge of time and duration in the project is important to manageme ==The Critical Path Method (CPM)==
    25 KB (3,945 words) - 17:30, 16 November 2018
  • CPM
    18 KB (2,935 words) - 17:36, 16 November 2018
  • ...ities connectd through the network is identification of the critical path (CPM - Critical Path Method), so the base for controlling and planning the proje ...the boxes have no specific identification. What else differs PERT from the CPM is that the first one permits explict treatment of probability for its time
    13 KB (2,234 words) - 17:38, 16 November 2018
  • ...ing techniques in Project Management]] such as [[The Critical Path Method (CPM)]] or [[PERT]] assume the unlimited resource availability in the project ne ...me means in calculations to reduce the stochastic model to a deterministic CPM model. A single critical path is then calculated and implemented, while in
    18 KB (2,731 words) - 17:44, 16 November 2018
  • ...were presented, highlighting one of the methods: ''Critical Path Method'' (CPM). Proper application of tools leads to a fully developed schedule of all ac Out of many tools to support schedule development, CPM was chosen for a wider description, based on its general simplicity<ref>Pag
    22 KB (3,339 words) - 22:06, 28 February 2018
  • ...rt]] and CPM network diagram<ref name="ssrg" />. However, criticism of the CPM has been raised, specifically in the case of construction projects, for not ...nage workflows and may therefore be expected to be a useful alternative to CPM. It implies a shift in focus from primarily the activities to the flow of w
    33 KB (5,149 words) - 17:23, 16 November 2018
  • ...were presented, highlighting one of the methods: ''Critical Path Method'' (CPM). Proper application of tools leads to a fully developed schedule of all ac Out of many tools to support schedule development, CPM was chosen for a wider description, based on its general simplicity<ref>Pag
    22 KB (3,389 words) - 15:07, 16 November 2018
  • ...Both these types of scheduling is based on the [[The Critical Path Method (CPM)]]. The critical path can be more accurately determined with the use of BIM
    27 KB (4,169 words) - 18:54, 4 March 2019
  • This article aims to build upon a PERT/CPM analysis and describe the theory behind crashing a project and how a PM mig Resource loading builds upon an intial CPM/PERT analysis where the critical path has been well identified, meaning tha
    16 KB (2,728 words) - 11:24, 4 March 2019
  • ...are, Request analysis, lessons learned, statement on the scope of project, CPM, CBA, Risk management and contract management.''
    20 KB (3,041 words) - 15:35, 2 March 2019
  • ...ut defining how to control the project during the execution. This involves CPM schedules, procurement schedules, safety guidelines. Moreover aspects such
    26 KB (3,756 words) - 21:03, 4 March 2019
  • ...to a specific project management technique called '''Critical Path Method (CPM)'''. According to Project Management Body of Knowledge (PMBOK), CPM ''is a method used to estimate the minimum project duration and determine t
    26 KB (4,160 words) - 13:41, 2 March 2019
  • Critical Path Method, CPM, is a method used to estimate the minimum duration of a project, as well as ...e and monitor activities related to a project’s schedule. Similar to the CPM, the PERT also uses information such as start dates and finish dates as wel
    16 KB (2,710 words) - 22:57, 4 March 2019
  • ...lgorithm for scheduling a set of project activities in the project. In the CPM a Network diagram needs to be developed. The Network diagram is about ident ...g process in the project. Tools like Gantt Chart and Critical Path Method (CPM) are tools often used in the planning process of a project.
    21 KB (3,244 words) - 21:47, 4 March 2019
  • ...T/CPM diagram example. <ref name=VPO> Visual Paradigm Online (2018) ''PERT/CPM diagram example'' [image] Available at: https://online.visual-paradigm.com/ ...e two methods are often used together and their combination is called PERT/CPM. <ref name=Gail> Thornley, G. (2007) ''Critical Path Analysis in Practice:
    16 KB (2,620 words) - 13:13, 4 March 2019
  • '''Title: PERT/CPM''' '''Link to the resource:''' [[PERT/CPM]]
    5 KB (614 words) - 11:02, 9 March 2020
  • ==PERT/CPM== ...hods have emerged with one another in a common method which is called PERT/CPM method.
    14 KB (2,195 words) - 20:28, 8 March 2020
  • |[[Complex Project Management (CPM)]]
    13 KB (1,759 words) - 08:25, 20 February 2023
  • The most well-known network planning techniques are the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT). These methods incl ...volve the use of PERT or a similar technique because of its effectiveness. CPM was designed initially for the preparation and coordination of chemical pla
    24 KB (3,668 words) - 19:10, 27 February 2021
  • ... are calculated for all activities without regard to resource limitations. CPM helps the project manager determine if a schedule is on the critical path.< :However, in CPM activity durations tend to be purposely overestimated by employees to ensur
    24 KB (3,651 words) - 10:32, 10 January 2022
  • After having done the network diagram [[The Critical Path Method (CPM)]] can be used to identify the Critical path in a project. When identifying
    20 KB (3,397 words) - 14:52, 28 February 2021
  • ...critical activities in accordance with the Critical Path Method (CPM). The CPM provides a framework for outlining the mission critical activities of a pro ... "Location Based Scheduling In The Form Of Flow Line and Its Comparison to Cpm/Bar Chart Scheduling, International Journal of Mechanical and Mechatronics
    28 KB (4,389 words) - 16:14, 26 February 2021
  • ...s to introduce practitioners to the concept of Complex Project Management (CPM) and propose tools for analysing project complexity in the early stage of a
    21 KB (3,157 words) - 16:50, 28 February 2021
  • ==== Critical Path Method (CPM) ==== ... determine the total duration of their project. During the planning phase, CPM is key since it identifies important deadlines and the activities which mus
    27 KB (4,096 words) - 22:57, 28 February 2021
  • ... activities which delays the project due date if only one of them is late. CPM draws the attention on this sequence of activities, which require much effo This method applies to projects designed under either Critical Path Method (CPM) or Critical Chain Project Management (CCPM) and motivates employees to com
    19 KB (2,856 words) - 14:37, 22 March 2021
  • [[File:CPM.png|400px|thumb|right|Figure 5, Example of the Critical Path Method, From P ...heduling-8040 ''Kramer, S. W. & Jenkins, J. L. Understanding the basics of CPM calculations: what is scheduling software really telling you?'', Project Ma
    22 KB (3,402 words) - 22:39, 28 February 2021
  • ...hod (CPM) and the last planning method is Location-Based Scheduling (LBS). CPM is a tool for discovering the critical path, which in simple terms is the p ===Critical Path Method (CPM)===
    18 KB (2,805 words) - 13:47, 28 February 2021
  • |[[Lead, lag and CPM]]
    10 KB (1,371 words) - 21:56, 6 February 2023
  • ...n 4 basic requirements:<ref>Samuel L. Baker, Ph.D. ,"Critical Path Method (CPM)", ''University of South Carolina'', Health Services Policy and Management<
    15 KB (2,377 words) - 19:37, 22 March 2022
  • ...nt has been a mature research area using well entrenched methods like PERT/CPM to solve variant problems. The application of theory of constraints in the
    26 KB (4,032 words) - 18:46, 15 March 2022
  • Lag, lead and CPM
    17 B (4 words) - 17:18, 17 March 2022
  • ...ill be Precedence Diagram Method (PDM) including Critical Path Management (CPM) to get a quantified take on possible scheduling risks that might be faced< ...sier to grasp if examples are given. To accommodate this, a video guide on CPM calculations in a PDM with lag and lead has been made and embedded.
    24 KB (3,868 words) - 20:20, 27 March 2022
  • ...s such as worker sickness, that push the critical path of a project (Wiki: CPM) and similar occurrences can be seen as variation in a project (Meyer et al
    25 KB (3,578 words) - 20:08, 9 May 2023
  • ...project scheduling techniques, such as Gantt charts, Critical Path Method (CPM), and Program Evaluation and Review Technique (PERT) ...tion, leading to the development of methods like the critical path method (CPM) and program evaluation and review technique (PERT), which account for prec
    7 KB (942 words) - 10:41, 5 May 2023
  • In addition to PERT, the '''Critical Path Method (CPM)''' is the method most frequently used for project scheduling. Since both o The CPM, on the other hand, is a deterministic method rather than a stochastic one
    30 KB (4,614 words) - 17:00, 9 May 2023
  • ...ity and uncertainty. One of the most common is the critical path method or CPM. This scheduling tool calculates the theoretical early and late start and f ...ve a good overview in which task they must put more focus on. Nonetheless, CPM also has its limitations. In this article these disadvantages will be descr
    9 KB (1,420 words) - 14:43, 19 February 2023
  • ...ackling complex projects and a thought example of a project where PERT and CPM is applied to estimate the duration. The manager can through the work of PERT and CPM analyze the tasks in the network diagram to reduce project deadline or impr
    22 KB (3,452 words) - 20:27, 26 February 2023
  • ...span>]. This article introduces the following scheduling techniques: PERT, CPM, and Gantt.
    31 KB (4,650 words) - 20:20, 8 May 2023
  • ... the modern project management era started in 1958 with the development of CPM/PERT. Morris (1987) argues that the origin of project management comes from
    4 KB (525 words) - 16:08, 12 February 2023
  • ... path method (CPM) and the Program evaluation and review technique (PERT). CPM and PERT was developed in the 1950’s and have since then been used widely ...described and elaborated in this article are the ''Critical Path Method'' (CPM) and the ''Program Evaluation and Review technique'' (PERT), which original
    22 KB (3,689 words) - 20:48, 9 May 2023
  • ... the modern project management era started in 1958 with the development of CPM/PERT.<ref>BRIEF HISTORY OF PROJECT MANAGEMENT - George Washington Universit
    17 KB (2,342 words) - 21:50, 9 May 2023
  • ...osely tied to the project scheduling methods such as Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT), which are predominantl ...uling problems which are solved by using scheduling tools such as PERT and CPM. These particular scheduling techniques demonstrate a network of tasks. On
    23 KB (3,342 words) - 11:58, 8 May 2023
  • <ref> Designer, Edward. "Critical Path Method (CPM) vs Critical Chain Method (CCM) for PMP Exam." Accessed May 5, 2023. https: The critical path method, also known as CPM, was developed by James E. Kelley from Remington Rand and Morgan R. Walker
    30 KB (4,701 words) - 16:18, 8 May 2023
  • ...ity and uncertainty. One of the most common is the critical path method or CPM. This scheduling tool calculates the theoretical early and late start and f Additionally, this article will explain how the CPM can be combined with other scheduling techniques, in particular with the we
    20 KB (3,164 words) - 14:51, 9 May 2023

View (previous 100 | next 100) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox