Welcome to our Conceptbox* - an online resource for project management tools, methods and theories. The content is oriented toward practitioners and students of project management.
 
Welcome to our Conceptbox* - an online resource for project management tools, methods and theories. The content is oriented toward practitioners and students of project management.
The concepts cover the core practices for doing projects and are organized according to our four perspectives([https://www.doing-projects.org/perspectives]) on projects:
+
The concepts cover the core practices for doing projects and are organized according to our four perspectives([https://www.doing-projects.org/perspectives]) on projects: <span style="color: #c11e4a">PURPOSE</span>, <span style="color: #474099">PEOPLE</span>, <span style="color: #16898b">COMPLEXITY</span> and <span style="color: #1f8b43">UNCERTAINTY</span>.
 
+
<span style="color: #c11e4a">PURPOSE</span>, <span style="color: #474099">PEOPLE</span>, <span style="color: #16898b">COMPLEXITY</span> and <span style="color: #1f8b43">UNCERTAINTY</span>.
+
  
 
The light version of the Conceptbox is available here([http://wiki.doing-projects.org/index.php/ConceptBox_Projects]).
 
The light version of the Conceptbox is available here([http://wiki.doing-projects.org/index.php/ConceptBox_Projects]).
Line 16: Line 14:
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #c11e4a; border-bottom:solid 2px #c11e4a; width: 20%; height: 200px;" rowspan="2"| '''0. Foundational elements:'''
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #c11e4a; border-bottom:solid 2px #c11e4a; width: 20%; height: 200px;" rowspan="2"| '''0. Foundational elements:'''
 
* Efficiency and Effectiveness ([http://wiki.doing-projects.org/index.php/Efficiency_vs._Effectiveness])
 
* Efficiency and Effectiveness ([http://wiki.doing-projects.org/index.php/Efficiency_vs._Effectiveness])
 +
  
 
'''Connecting the dots:'''
 
'''Connecting the dots:'''
Line 27: Line 26:
 
* FAST Goals ([http://wiki.doing-projects.org/index.php/FAST_Goals])
 
* FAST Goals ([http://wiki.doing-projects.org/index.php/FAST_Goals])
 
* The paradox of project planning ([http://wiki.doing-projects.org/index.php/The_paradox_of_project_planning_from_an_uncertainty_perspective])
 
* The paradox of project planning ([http://wiki.doing-projects.org/index.php/The_paradox_of_project_planning_from_an_uncertainty_perspective])
* The rolling wave ([http://wiki.doing-projects.org/index.php/The_Rolling-wave_Planning])
+
* The rolling wave ([http://wiki.doing-projects.org/index.php/The_Rolling-wave_Planning], [http://wiki.doing-projects.org/index.php/The_Rolling-Wave_planning_technique])
  
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #c11e4a; border-bottom:solid 2px #c11e4a; width: 20%; height: 200px;" |'''2. Impacting: How do we reap the benefits?'''
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #c11e4a; border-bottom:solid 2px #c11e4a; width: 20%; height: 200px;" |'''2. Impacting: How do we reap the benefits?'''
Line 38: Line 37:
 
* Temporal context of projects ([http://wiki.doing-projects.org/index.php/Context_element])
 
* Temporal context of projects ([http://wiki.doing-projects.org/index.php/Context_element])
 
* Organizational context ([http://wiki.doing-projects.org/index.php/Organizational_context])
 
* Organizational context ([http://wiki.doing-projects.org/index.php/Organizational_context])
* Project based organisations
+
* Project-based organisations ([http://wiki.doing-projects.org/index.php/Project_based_organisations])
* Matrix organisations ([http://wiki.doing-projects.org/index.php/Matrix_Organisation])
+
* Matrix organisations ([http://wiki.doing-projects.org/index.php/Matrix_Organisation], [http://wiki.doing-projects.org/index.php/Matrix_organizations])
* Project organization
+
* Project organization ([http://wiki.doing-projects.org/index.php/Project_organization])
  
 
|-style=" width: 20%; background-color:white; vertical-align:top; border-right:solid 2px #c11e4a; border-bottom:solid 2px #c11e4a; width: 20%; height: 200px;"|
 
|-style=" width: 20%; background-color:white; vertical-align:top; border-right:solid 2px #c11e4a; border-bottom:solid 2px #c11e4a; width: 20%; height: 200px;"|
Line 49: Line 48:
 
* Agile (Adaptive) model ([http://wiki.doing-projects.org/index.php/The_Agile_methodology_and_its_frameworks],[http://wiki.doing-projects.org/index.php/SAFe],[http://wiki.doing-projects.org/index.php/(Re)Introducing_Project_Management_in_a_SAFe_world])
 
* Agile (Adaptive) model ([http://wiki.doing-projects.org/index.php/The_Agile_methodology_and_its_frameworks],[http://wiki.doing-projects.org/index.php/SAFe],[http://wiki.doing-projects.org/index.php/(Re)Introducing_Project_Management_in_a_SAFe_world])
 
* Scrum ([http://wiki.doing-projects.org/index.php/Scrum],[http://wiki.doing-projects.org/index.php/Scrum_method],[http://wiki.doing-projects.org/index.php/The_Scrum_framework])
 
* Scrum ([http://wiki.doing-projects.org/index.php/Scrum],[http://wiki.doing-projects.org/index.php/Scrum_method],[http://wiki.doing-projects.org/index.php/The_Scrum_framework])
* Concurrent models ([http://wiki.doing-projects.org/index.php/Integrated_Concurrent_Engineering])
+
* Concurrent models ([http://wiki.doing-projects.org/index.php/Integrated_Concurrent_Engineering], [http://wiki.doing-projects.org/index.php/Concurrent_Engineering])
 
* Over the wall (Chinese whispers)
 
* Over the wall (Chinese whispers)
  
Line 58: Line 57:
  
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left; border-right:solid 2px #c11e4a; border-bottom:solid 2px #c11e4a; width: 20%; height: 200px;" |'''6. Evaluating: Did we succeed?'''
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left; border-right:solid 2px #c11e4a; border-bottom:solid 2px #c11e4a; width: 20%; height: 200px;" |'''6. Evaluating: Did we succeed?'''
*[[Iron triangle ([http://wiki.doing-projects.org/index.php/Iron_Triangle],[http://wiki.doing-projects.org/index.php/Iron_Triangle_of_Project_Management],[http://wiki.doing-projects.org/index.php/The_iron_triangle_as_an_analytical_tool])
+
*Iron triangle ([http://wiki.doing-projects.org/index.php/Iron_Triangle],[http://wiki.doing-projects.org/index.php/Iron_Triangle_of_Project_Management],[http://wiki.doing-projects.org/index.php/The_iron_triangle_as_an_analytical_tool])
* Project Success vs. Project Management Success ([http://wiki.doing-projects.org/index.php/Project_Success_and_Project_Management_Success],[http://wiki.doing-projects.org/index.php/Evaluation_of_project_success])
+
* Project Success vs Project Management Success ([http://wiki.doing-projects.org/index.php/Project_Success_and_Project_Management_Success],[http://wiki.doing-projects.org/index.php/Evaluation_of_project_success])
 
* Conformance vs. Performance
 
* Conformance vs. Performance
  
Line 76: Line 75:
  
 
'''Connecting the dots:'''
 
'''Connecting the dots:'''
* Rework by google “Psychological Safety” ([http://wiki.doing-projects.org/index.php/Psychological_safety_as_a_key_factor_to_quality_and_productivity_of_Organizations])
+
* Rework by google “Psychological Safety” ([http://wiki.doing-projects.org/index.php/Psychological_safety_as_a_key_factor_to_quality_and_productivity_of_Organizations],[http://wiki.doing-projects.org/index.php/The_Influence_of_Psychological_Safety_in_Team_Development])
  
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #474099; border-bottom:solid 2px #474099; width: 20%; height: 200px;" |'''1. Engaging: For whom are we doing it?'''
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #474099; border-bottom:solid 2px #474099; width: 20%; height: 200px;" |'''1. Engaging: For whom are we doing it?'''
* Identification
+
* Identification ([http://wiki.doing-projects.org/index.php/Managing_stakeholders_through_persona])
 
* Assessment of stakeholders (analysis) ([http://wiki.doing-projects.org/index.php/Stakeholder_Analysis_Process])
 
* Assessment of stakeholders (analysis) ([http://wiki.doing-projects.org/index.php/Stakeholder_Analysis_Process])
 
* Managing stakeholders ([http://wiki.doing-projects.org/index.php/Stakeholder_Management],[http://wiki.doing-projects.org/index.php/Stakeholder_Expectations_Management])
 
* Managing stakeholders ([http://wiki.doing-projects.org/index.php/Stakeholder_Management],[http://wiki.doing-projects.org/index.php/Stakeholder_Expectations_Management])
  
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #474099; border-bottom:solid 2px #474099; width: 20%; height: 200px;" |'''2. Teaming: Who is doing it?'''
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #474099; border-bottom:solid 2px #474099; width: 20%; height: 200px;" |'''2. Teaming: Who is doing it?'''
* Group vs teams
+
* Group vs teams ([http://wiki.doing-projects.org/index.php/Groups_or_teams%3F])
 
* High performing teams ([http://wiki.doing-projects.org/index.php/High_performing_teams])
 
* High performing teams ([http://wiki.doing-projects.org/index.php/High_performing_teams])
 
* Cohesiveness ([http://wiki.doing-projects.org/index.php/The_Significance_of_Cohesiveness_in_Teams])
 
* Cohesiveness ([http://wiki.doing-projects.org/index.php/The_Significance_of_Cohesiveness_in_Teams])
Line 93: Line 92:
 
* Belbin's team roles([http://wiki.doing-projects.org/index.php/Effective_teams_with_Belbin],[http://wiki.doing-projects.org/index.php/Belbin%27s_Team_Roles],[http://wiki.doing-projects.org/index.php/Belbin%27s_9_team_roles],[http://wiki.doing-projects.org/index.php/Creating_effective_teams_with_the_use_of_Belbin%27s_Team_Roles])
 
* Belbin's team roles([http://wiki.doing-projects.org/index.php/Effective_teams_with_Belbin],[http://wiki.doing-projects.org/index.php/Belbin%27s_Team_Roles],[http://wiki.doing-projects.org/index.php/Belbin%27s_9_team_roles],[http://wiki.doing-projects.org/index.php/Creating_effective_teams_with_the_use_of_Belbin%27s_Team_Roles])
 
* The big five (OCEAN)([http://wiki.doing-projects.org/index.php/The_Big_Five_(Ocean)],[http://wiki.doing-projects.org/index.php/The_Big_Five(OCEAN)_Personality_Traits],[http://wiki.doing-projects.org/index.php/The_Five-Factor_Model_(OCEAN)])
 
* The big five (OCEAN)([http://wiki.doing-projects.org/index.php/The_Big_Five_(Ocean)],[http://wiki.doing-projects.org/index.php/The_Big_Five(OCEAN)_Personality_Traits],[http://wiki.doing-projects.org/index.php/The_Five-Factor_Model_(OCEAN)])
* Tuckmans model for Team Development ([http://wiki.doing-projects.org/index.php/Tuckmans_model_for_Team_Development])
+
* Tuckman's model for Team Development ([http://wiki.doing-projects.org/index.php/Tuckmans_model_for_Team_Development])
  
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #474099; border-bottom:solid 2px #474099; width: 20%; height: 200px;" |'''3. Communicating & Listening: How do they/we get to understand?'''
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #474099; border-bottom:solid 2px #474099; width: 20%; height: 200px;" |'''3. Communicating & Listening: How do they/we get to understand?'''
Line 100: Line 99:
 
* Choosing the appropriate medium (oral – written – hybrids) ([http://wiki.doing-projects.org/index.php/Choosing_the_appropriate_medium_(oral_%E2%80%93_written_%E2%80%93_hybrids)])
 
* Choosing the appropriate medium (oral – written – hybrids) ([http://wiki.doing-projects.org/index.php/Choosing_the_appropriate_medium_(oral_%E2%80%93_written_%E2%80%93_hybrids)])
 
* Managing "emails" ([http://wiki.doing-projects.org/index.php/Managing_%E2%80%9Cemails%E2%80%9D])
 
* Managing "emails" ([http://wiki.doing-projects.org/index.php/Managing_%E2%80%9Cemails%E2%80%9D])
* Active Listening Technique ([http://wiki.doing-projects.org/index.php/Active_Listening_Technique],[http://wiki.doing-projects.org/index.php/Improve_communication_with_active_listening])
+
* Active Listening Technique ([http://wiki.doing-projects.org/index.php/The_Active_Listening_Technique],[http://wiki.doing-projects.org/index.php/Active_Listening_Technique],[http://wiki.doing-projects.org/index.php/Improve_communication_with_active_listening])
* Self-Awareness! ([http://wiki.doing-projects.org/index.php/Self-awareness_in_management])
+
* Self-Awareness! ([http://wiki.doing-projects.org/index.php/Self-Awareness!],[http://wiki.doing-projects.org/index.php/The_Benefits_of_Self-Awareness])
  
 
|-style=" width: 20%; background-color:white; vertical-align:top; border-right:solid 2px #c11e4a; border-bottom:solid 2px #474099; width: 20%; height: 200px;"|
 
|-style=" width: 20%; background-color:white; vertical-align:top; border-right:solid 2px #c11e4a; border-bottom:solid 2px #474099; width: 20%; height: 200px;"|
Line 111: Line 110:
 
* Stress ([http://wiki.doing-projects.org/index.php/Stress],[http://wiki.doing-projects.org/index.php/Stress_Management])
 
* Stress ([http://wiki.doing-projects.org/index.php/Stress],[http://wiki.doing-projects.org/index.php/Stress_Management])
 
* Eisenhower matrix ([http://wiki.doing-projects.org/index.php/The_Eisenhower_Decision_Matrix],[http://wiki.doing-projects.org/index.php/Prioritizing_in_Projects_with_Eisenhower_Decision_Matrix])
 
* Eisenhower matrix ([http://wiki.doing-projects.org/index.php/The_Eisenhower_Decision_Matrix],[http://wiki.doing-projects.org/index.php/Prioritizing_in_Projects_with_Eisenhower_Decision_Matrix])
 +
* Time blocking ([http://wiki.doing-projects.org/index.php/The_Eisenhower_Decision_Matrix])
  
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #474099; border-bottom:solid 2px #474099; width: 20%; height: 200px;" |'''4. Mediating: How do we handle conflicts?'''
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #474099; border-bottom:solid 2px #474099; width: 20%; height: 200px;" |'''4. Mediating: How do we handle conflicts?'''
Line 119: Line 119:
  
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #474099; border-bottom:solid 2px #474099; width: 20%; height: 200px;" |'''5. Motivating: What motivates us/them?'''
 
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #474099; border-bottom:solid 2px #474099; width: 20%; height: 200px;" |'''5. Motivating: What motivates us/them?'''
* Scientific management
+
* Scientific management ([http://wiki.doing-projects.org/index.php/Scientific_Management])
 
* The Hawthorne studies ([http://wiki.doing-projects.org/index.php/Applying_the_Hawthorne_studies_to_project_management])
 
* The Hawthorne studies ([http://wiki.doing-projects.org/index.php/Applying_the_Hawthorne_studies_to_project_management])
 
* McGregor's X & Y theory ([http://wiki.doing-projects.org/index.php/McGregor%27s_X_%26_Y_theory,][http://wiki.doing-projects.org/index.php/Motivation_through_Theory_X%26Y_from_a_Project_Management_perspective])
 
* McGregor's X & Y theory ([http://wiki.doing-projects.org/index.php/McGregor%27s_X_%26_Y_theory,][http://wiki.doing-projects.org/index.php/Motivation_through_Theory_X%26Y_from_a_Project_Management_perspective])
 
* Maslow's Hierarchy of Needs([http://wiki.doing-projects.org/index.php/Maslow%27s_Hierarchy_of_Needs],[http://wiki.doing-projects.org/index.php/Maslow%27s_Hierarchy_of_Needs_and_Project_Management])
 
* Maslow's Hierarchy of Needs([http://wiki.doing-projects.org/index.php/Maslow%27s_Hierarchy_of_Needs],[http://wiki.doing-projects.org/index.php/Maslow%27s_Hierarchy_of_Needs_and_Project_Management])
* Extrinsic motivation ([http://wiki.doing-projects.org/index.php/Extrinsic_motivation])
+
* Extrinsic motivation ([http://wiki.doing-projects.org/index.php/Extrinsic_motivation],[http://wiki.doing-projects.org/index.php/Extrinsic_Motivation_in_the_Workplace])
 
* Intrinsic Motivation ([http://wiki.doing-projects.org/index.php/Intrinsic_Motivation])
 
* Intrinsic Motivation ([http://wiki.doing-projects.org/index.php/Intrinsic_Motivation])
 
* Daniel Pink on Motivation ([http://wiki.doing-projects.org/index.php/Dan_Pink_on_Motivation])
 
* Daniel Pink on Motivation ([http://wiki.doing-projects.org/index.php/Dan_Pink_on_Motivation])
Line 130: Line 130:
 
*  Management vs leadership ([http://wiki.doing-projects.org/index.php/The_Difference_Between_Leadership_and_Management],[http://wiki.doing-projects.org/index.php/Leadership_vs._management])
 
*  Management vs leadership ([http://wiki.doing-projects.org/index.php/The_Difference_Between_Leadership_and_Management],[http://wiki.doing-projects.org/index.php/Leadership_vs._management])
 
* Blake-Mouton Managerial Grid([http://wiki.doing-projects.org/index.php/Blake-Mouton_Managerial_Grid],[http://wiki.doing-projects.org/index.php/The_Blake_and_Mouton%27s_Managerial_(Leadership)_Grid])
 
* Blake-Mouton Managerial Grid([http://wiki.doing-projects.org/index.php/Blake-Mouton_Managerial_Grid],[http://wiki.doing-projects.org/index.php/The_Blake_and_Mouton%27s_Managerial_(Leadership)_Grid])
* Situational leadership - Hersey and Blanchard ([http://wiki.doing-projects.org/index.php/Situational_leadership_-_Hersey_and_Blanchard],[http://wiki.doing-projects.org/index.php/Hersey_and_Blanchard%27s_Situational_Leadership])
+
* Situational leadership - Hersey and Blanchard ([http://wiki.doing-projects.org/index.php/Situational_leadership_-_Hersey_and_Blanchard],[http://wiki.doing-projects.org/index.php/Situational_Leadership_Theory_(SLT)])
  
 
|}
 
|}
Line 145: Line 145:
  
 
'''Connecting the dots:'''
 
'''Connecting the dots:'''
* When – the scientific secrets of perfect timing
+
* When – the scientific secrets of perfect timing ([http://wiki.doing-projects.org/index.php/When_%E2%80%93_the_scientific_secrets_of_perfect_timing], [http://wiki.doing-projects.org/index.php/When:_The_Scientific_Secrets_of_Perfect_Timing])
 
+
  
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;" |'''1. Scoping: What to do?'''
+
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;" |'''1. Scoping: How to do it?'''
* Pooled, Sequential & Reciprocal dependence([http://wiki.doing-projects.org/index.php/Pooled,_Sequential_%26_Reciprocal_Interdependence])
+
* Pooled, Sequential & Reciprocal dependence([http://wiki.doing-projects.org/index.php/Task_Interdependecies_in_Projects],[http://wiki.doing-projects.org/index.php/Pooled,_Sequential_%26_Reciprocal_Interdependence])
* Work break down structure (WBS)([http://wiki.doing-projects.org/index.php/Work_Breakdown_Structure_(WBS)_in_Project_Management])
+
* Work break down structure (WBS)([http://wiki.doing-projects.org/index.php/Work_Breakdown_Structure_(WBS)_in_Project_Management], [http://wiki.doing-projects.org/index.php/WBS_-_Work_Breakdown_Structure])
  
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;" |'''2.Estimating: ?'''
+
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;" |'''2. Estimating: ?'''
 
* Top-down vs ground up estimations([http://wiki.doing-projects.org/index.php/Top-down_vs_bottom-up_estimations])
 
* Top-down vs ground up estimations([http://wiki.doing-projects.org/index.php/Top-down_vs_bottom-up_estimations])
 
* Estimation Techniques([http://wiki.doing-projects.org/index.php/Cost_Estimation_Techniques_for_Projects], [http://wiki.doing-projects.org/index.php/Basic_estimation_techniques])
 
* Estimation Techniques([http://wiki.doing-projects.org/index.php/Cost_Estimation_Techniques_for_Projects], [http://wiki.doing-projects.org/index.php/Basic_estimation_techniques])
Line 159: Line 158:
 
* Successive principle (cost or schedule)([http://wiki.doing-projects.org/index.php/The_Successive_Principle_for_Managing_Uncertainty])  
 
* Successive principle (cost or schedule)([http://wiki.doing-projects.org/index.php/The_Successive_Principle_for_Managing_Uncertainty])  
  
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;" |'''3. Scheduling: When to do it?'''
+
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;" |'''3. Timing: When to do it?'''
 
* Double diamond([http://wiki.doing-projects.org/index.php/Double_diamond],[http://wiki.doing-projects.org/index.php/Double_diamond:_A_design_process_model], [http://wiki.doing-projects.org/index.php/Double_Diamond_model], [http://wiki.doing-projects.org/index.php/Double_Diamond_Model])
 
* Double diamond([http://wiki.doing-projects.org/index.php/Double_diamond],[http://wiki.doing-projects.org/index.php/Double_diamond:_A_design_process_model], [http://wiki.doing-projects.org/index.php/Double_Diamond_model], [http://wiki.doing-projects.org/index.php/Double_Diamond_Model])
 
* Kanban([http://wiki.doing-projects.org/index.php/Kanban],[http://wiki.doing-projects.org/index.php/Kanban_in_Project_Management], [http://wiki.doing-projects.org/index.php/Kanban_in_APPPM])
 
* Kanban([http://wiki.doing-projects.org/index.php/Kanban],[http://wiki.doing-projects.org/index.php/Kanban_in_Project_Management], [http://wiki.doing-projects.org/index.php/Kanban_in_APPPM])
Line 172: Line 171:
 
|-style=" width: 20%; background-color:white; vertical-align:top; border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;"|
 
|-style=" width: 20%; background-color:white; vertical-align:top; border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;"|
  
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;"|'''4. Costing: How much?'''
+
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;"|'''4. Resourcing: How much?'''
 
* Type of resources ([http://wiki.doing-projects.org/index.php/Resource_allocation_and_crashing])
 
* Type of resources ([http://wiki.doing-projects.org/index.php/Resource_allocation_and_crashing])
 
* Critical chain ([http://wiki.doing-projects.org/index.php/Critical-Chain_Approach], [http://wiki.doing-projects.org/index.php/The_Critical_Chain_Method], [http://wiki.doing-projects.org/index.php/Critical_chain_project_management_(CCPM)])
 
* Critical chain ([http://wiki.doing-projects.org/index.php/Critical-Chain_Approach], [http://wiki.doing-projects.org/index.php/The_Critical_Chain_Method], [http://wiki.doing-projects.org/index.php/Critical_chain_project_management_(CCPM)])
* Cost build up
+
* Cost build-up
 
* Cost planning ([http://wiki.doing-projects.org/index.php/Construction_Cost_Management])
 
* Cost planning ([http://wiki.doing-projects.org/index.php/Construction_Cost_Management])
 
* Cash flow ([http://wiki.doing-projects.org/index.php/Cash_flow_and_milestone_payments], [http://wiki.doing-projects.org/index.php/Cash_flow_%26_payment_milestones])
 
* Cash flow ([http://wiki.doing-projects.org/index.php/Cash_flow_and_milestone_payments], [http://wiki.doing-projects.org/index.php/Cash_flow_%26_payment_milestones])
  
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;" |'''5. Improving: Can we do it better?'''
+
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #16898b; border-bottom:solid 2px #16898b; width: 20%; height: 200px;" |'''5. Improving: Can we make it better?'''
 
* Multi-tasking
 
* Multi-tasking
 
* Resources leveling and crashing ([http://wiki.doing-projects.org/index.php/Resources_loading,_leveling_and_crashing])
 
* Resources leveling and crashing ([http://wiki.doing-projects.org/index.php/Resources_loading,_leveling_and_crashing])
Line 191: Line 190:
 
* Fee-based contracts
 
* Fee-based contracts
 
* Fixed-price contracts ([http://wiki.doing-projects.org/index.php/Fixed-price_contracts])  
 
* Fixed-price contracts ([http://wiki.doing-projects.org/index.php/Fixed-price_contracts])  
* Incentive contracts  
+
* Incentive contracts ([http://wiki.doing-projects.org/index.php/Incentive_contract])
 
* Adversarial Relations ([http://wiki.doing-projects.org/index.php/The_dynamics_of_adversarial_relations], [http://wiki.doing-projects.org/index.php/Collaborative_Tendering])
 
* Adversarial Relations ([http://wiki.doing-projects.org/index.php/The_dynamics_of_adversarial_relations], [http://wiki.doing-projects.org/index.php/Collaborative_Tendering])
 
* Integrated Project Delivery (IPD)([http://wiki.doing-projects.org/index.php/Integrated_Project_Delivery_(IPD)], [http://wiki.doing-projects.org/index.php/The_integrated_project_delivery_method_(IPD)])
 
* Integrated Project Delivery (IPD)([http://wiki.doing-projects.org/index.php/Integrated_Project_Delivery_(IPD)], [http://wiki.doing-projects.org/index.php/The_integrated_project_delivery_method_(IPD)])
Line 226: Line 225:
 
* Technology and System Readiness ([http://wiki.doing-projects.org/index.php/System_Readiness_Level_Index])
 
* Technology and System Readiness ([http://wiki.doing-projects.org/index.php/System_Readiness_Level_Index])
  
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;" |'''2. Monitoring:'''
+
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;" |'''2. Monitoring: How far are we?'''
* Conformance / performance
+
* Conformance/performance
 
* Milestone trend analysis ([http://wiki.doing-projects.org/index.php/Milestone_trend_analysis])
 
* Milestone trend analysis ([http://wiki.doing-projects.org/index.php/Milestone_trend_analysis])
 
* Burn down charts ([http://wiki.doing-projects.org/index.php/Agile_Scrum_Methodology])
 
* Burn down charts ([http://wiki.doing-projects.org/index.php/Agile_Scrum_Methodology])
 
* Earned value ([http://wiki.doing-projects.org/index.php/Earned_value_management_(EVM)], [http://wiki.doing-projects.org/index.php/Earned_Value_Analysis], [http://wiki.doing-projects.org/index.php/Earned_Value_Management_(EVM)])
 
* Earned value ([http://wiki.doing-projects.org/index.php/Earned_value_management_(EVM)], [http://wiki.doing-projects.org/index.php/Earned_Value_Analysis], [http://wiki.doing-projects.org/index.php/Earned_Value_Management_(EVM)])
 
* Project reporting ([http://wiki.doing-projects.org/index.php/Performance_Reporting])
 
* Project reporting ([http://wiki.doing-projects.org/index.php/Performance_Reporting])
* Project war rooms ([http://wiki.doing-projects.org/index.php/Virtual_War_Rooms], [http://wiki.doing-projects.org/index.php/Visual_Project_Management_-_War_Rooms])
+
* Project war rooms ([http://wiki.doing-projects.org/index.php/Project_War_Rooms:_Physical_vs._Virtual],[http://wiki.doing-projects.org/index.php/Virtual_War_Rooms], [http://wiki.doing-projects.org/index.php/Visual_Project_Management_-_War_Rooms])
 
* Project dashboard ([http://wiki.doing-projects.org/index.php/Project_dashboard])
 
* Project dashboard ([http://wiki.doing-projects.org/index.php/Project_dashboard])
  
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;" |'''3. Adapting:'''
+
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;" |'''3. Adapting: Can we keep our project relevant?'''
 
* Corrective and Preventive Actions ([http://wiki.doing-projects.org/index.php/Corrective_and_Preventive_Actions_(CAPA)])
 
* Corrective and Preventive Actions ([http://wiki.doing-projects.org/index.php/Corrective_and_Preventive_Actions_(CAPA)])
 
* Adaptation and agile ([http://wiki.doing-projects.org/index.php/The_Agile_methodology_and_its_frameworks])
 
* Adaptation and agile ([http://wiki.doing-projects.org/index.php/The_Agile_methodology_and_its_frameworks])
 
* Scope creep ([http://wiki.doing-projects.org/index.php/Scope_creep])
 
* Scope creep ([http://wiki.doing-projects.org/index.php/Scope_creep])
 
* Change requests
 
* Change requests
* Resilience management
+
* Resilience management ([http://wiki.doing-projects.org/index.php/Resilience_management_-_readiness_and_response])
  
 
|-style=" width: 20%; background-color:white; vertical-align:top; border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;"|
 
|-style=" width: 20%; background-color:white; vertical-align:top; border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;"|
  
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;"|'''4. Learning:'''
+
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;"|'''4. Learning: How can we know?'''
 
* Paradox for project planning ([http://wiki.doing-projects.org/index.php/The_paradox_of_project_planning_from_an_uncertainty_perspective])
 
* Paradox for project planning ([http://wiki.doing-projects.org/index.php/The_paradox_of_project_planning_from_an_uncertainty_perspective])
 
* Learning plan ([http://wiki.doing-projects.org/index.php/Learning_plan], [http://wiki.doing-projects.org/index.php/Learning_plans_for_high_uncertainty_projects])
 
* Learning plan ([http://wiki.doing-projects.org/index.php/Learning_plan], [http://wiki.doing-projects.org/index.php/Learning_plans_for_high_uncertainty_projects])
Line 251: Line 250:
 
* Continuous Improvement ([http://wiki.doing-projects.org/index.php/Continuous_Improvement_/_Kaizen],[http://wiki.doing-projects.org/index.php/Continuous_Improvement_(CI)])
 
* Continuous Improvement ([http://wiki.doing-projects.org/index.php/Continuous_Improvement_/_Kaizen],[http://wiki.doing-projects.org/index.php/Continuous_Improvement_(CI)])
  
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;" |'''5. Deciding:'''
+
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left;border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;" |'''5. Deciding: What should we do?'''
* Scenario Analysis ([http://wiki.doing-projects.org/index.php/Scenario_Analysis], [http://wiki.doing-projects.org/index.php/Scenario_Planning_Strategy])
+
* Scenario Analysis ([http://wiki.doing-projects.org/index.php/Scenario_Analysis], [http://wiki.doing-projects.org/index.php/Scenario_Planning_Strategy], [http://wiki.doing-projects.org/index.php/Task_Interdependecies_in_Projects])
* Satisficing
+
* Satisficing ([http://wiki.doing-projects.org/index.php/Satisficing])
 
* The Decision Matrix ([http://wiki.doing-projects.org/index.php/The_Decision_Matrix])
 
* The Decision Matrix ([http://wiki.doing-projects.org/index.php/The_Decision_Matrix])
 
* [[Choosing by Advantages (CBA)]]
 
* [[Choosing by Advantages (CBA)]]
 
* Eisenhower matrix ([http://wiki.doing-projects.org/index.php/The_Eisenhower_Decision_Matrix],[http://wiki.doing-projects.org/index.php/Prioritizing_in_Projects_with_Eisenhower_Decision_Matrix])
 
* Eisenhower matrix ([http://wiki.doing-projects.org/index.php/The_Eisenhower_Decision_Matrix],[http://wiki.doing-projects.org/index.php/Prioritizing_in_Projects_with_Eisenhower_Decision_Matrix])
 +
* Data-Driven Decision-Making ([http://wiki.doing-projects.org/index.php/Data-Driven_Decision-Making_under_Uncertainty])
 
* Robust Decision Making ([http://wiki.doing-projects.org/index.php/Robust_decision_making],[http://wiki.doing-projects.org/index.php/Robust_Decision_Making_under_Deep_Uncertainty])  
 
* Robust Decision Making ([http://wiki.doing-projects.org/index.php/Robust_decision_making],[http://wiki.doing-projects.org/index.php/Robust_Decision_Making_under_Deep_Uncertainty])  
  
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left; border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;" |'''6. Interpreting:'''
+
|style=" width: 20%; background-color:white; vertical-align:top; text-align:left; border-right:solid 2px #1f8b43; border-bottom:solid 2px #1f8b43; width: 20%; height: 200px;" |'''6. Interpreting: What is our/their perspective?'''
 
* Biases ([http://wiki.doing-projects.org/index.php/Biases_in_Project_Management])
 
* Biases ([http://wiki.doing-projects.org/index.php/Biases_in_Project_Management])
 
* Kahneman - Two Thinking Systems([http://wiki.doing-projects.org/index.php/Kahneman_-_Two_Thinking_Systems],[http://wiki.doing-projects.org/index.php/Kahneman%27s_two_thinking_systems])
 
* Kahneman - Two Thinking Systems([http://wiki.doing-projects.org/index.php/Kahneman_-_Two_Thinking_Systems],[http://wiki.doing-projects.org/index.php/Kahneman%27s_two_thinking_systems])

Latest revision as of 15:35, 29 July 2023

Conceptlogo.png

Welcome to our Conceptbox* - an online resource for project management tools, methods and theories. The content is oriented toward practitioners and students of project management. The concepts cover the core practices for doing projects and are organized according to our four perspectives([1]) on projects: PURPOSE, PEOPLE, COMPLEXITY and UNCERTAINTY.

The light version of the Conceptbox is available here([2]).

Contents

[edit] PURPOSE

Purpose
0. Foundational elements:
  • Efficiency and Effectiveness ([3])


Connecting the dots:

  • (sustainable) project management
1. Projecting: Why should we do it?
  • Why, How, What (The Golden Circle)([4])
  • Goal Hierarchy ([5])
  • Work break down structures ([6],[7])
  • SMART goals ([8],[9],[10])
  • FAST Goals ([11])
  • The paradox of project planning ([12])
  • The rolling wave ([13], [14])
2. Impacting: How do we reap the benefits?
  • Outputs, outcomes and benefits ([15])
  • Benefit realization management ([16],[17])
  • Objectives and Key Results (OKR) ([18])
  • Impact (sustainability) ([19],[20])
3. Situating: Do we understand the context?
  • Temporal context of projects ([21])
  • Organizational context ([22])
  • Project-based organisations ([23])
  • Matrix organisations ([24], [25])
  • Project organization ([26])
4. Living: How should we live it? 5. Investing: Should we do it?
  • Business case([39],[40])
  • Net Present Value (NPV) - Discounted cash flow ([41],[42])
  • Internal Rate of Return (IRR) ([43],[44])
6. Evaluating: Did we succeed?
  • Iron triangle ([45],[46],[47])
  • Project Success vs Project Management Success ([48],[49])
  • Conformance vs. Performance

[edit] PEOPLE

People
0. Foundational elements:


Connecting the dots:

  • Rework by google “Psychological Safety” ([50],[51])
1. Engaging: For whom are we doing it?
  • Identification ([52])
  • Assessment of stakeholders (analysis) ([53])
  • Managing stakeholders ([54],[55])
2. Teaming: Who is doing it? 3. Communicating & Listening: How do they/we get to understand?
  • Shannon & Weavers Model for communication ([72])
  • Perception filters ([73])
  • Choosing the appropriate medium (oral – written – hybrids) ([74])
  • Managing "emails" ([75])
  • Active Listening Technique ([76],[77],[78])
  • Self-Awareness! ([79],[80])
Bonus: Self-management 4. Mediating: How do we handle conflicts?
  • Conflicts and controversy ([92], [93])
  • Sources of conflicts ([94],[95])
  • Conflict ladder ([96])
  • Constructive communication ([97])
5. Motivating: What motivates us/them? 6. Leading: How do we guide?

[edit] COMPLEXITY

Complexity
0. Foundational elements:


Connecting the dots:

  • When – the scientific secrets of perfect timing ([116], [117])
1. Scoping: How to do it?
  • Pooled, Sequential & Reciprocal dependence([118],[119])
  • Work break down structure (WBS)([120], [121])
2. Estimating: ?
  • Top-down vs ground up estimations([122])
  • Estimation Techniques([123], [124])
  • Program Evaluation and Review Technique (PERT)([125],[126])
  • Reference class forecasting([127],[128], [129])
  • Successive principle (cost or schedule)([130])
3. Timing: When to do it?
4. Resourcing: How much? 5. Improving: Can we make it better?


6. Contracting: Make or Buy?
  • Types of contracts ([167])
  • Fee-based contracts
  • Fixed-price contracts ([168])
  • Incentive contracts ([169])
  • Adversarial Relations ([170], [171])
  • Integrated Project Delivery (IPD)([172], [173])

[edit] UNCERTAINTY

Uncertainty
0. Foundational elements:
  • The Johari window / Rumfelds matrix ([174])
  • Types of uncertainty: Epistemic / Aleatory([175]])
  • Levels of uncertainty (i.e. risk, uncertainty, ignorance)


Connecting the dots:


1. Anticipating: What if something happens? 2. Monitoring: How far are we? 3. Adapting: Can we keep our project relevant?
  • Corrective and Preventive Actions ([209])
  • Adaptation and agile ([210])
  • Scope creep ([211])
  • Change requests
  • Resilience management ([212])
4. Learning: How can we know? 5. Deciding: What should we do? 6. Interpreting: What is our/their perspective?
  • Biases ([230])
  • Kahneman - Two Thinking Systems([231],[232])
  • Strategic misrepresentation ([233],[234])
  • The Affect Heuristic ([235])
  • Social Amplification of Risk
  • Disclaimer: The articles are created by DTU students. As part of the course, students are introduced to knowledge related to IP rights, plagiarism and copyright infringement. Additionally, the articles are a product of critical engagement of students with the literature review, and their aim is to contribute to the Project Management holistic field of science. If you discover any potential copyright infringement on the site, please inform thereof by sending an email to ophavsret@dtu.dk.