Search results

Jump to: navigation, search

Page title matches

  • ...of [[Communication in Project Management]] enabling continuous information flow to translate the owner’s value preposition into a successful project. The ...s to see both the limitations and advantages of this method of information flow. First the paper will make a description and application of BIM during the
    17 KB (2,581 words) - 19:18, 20 November 2018

Page text matches

  • ...Construction is based on three views in production theory, Transformation, Flow and Value (TFV). These three views do not compete with each other but are r ...niversity, USA.</ref>. Furthermore, Koskela introduced the Transformation, Flow and Value (TFV) theory that is derived from earlier theories regarding prod
    25 KB (3,805 words) - 12:20, 20 December 2018
  • ...t aims to optimize and develop projects: (1) Value, (2) Value stream, (3) flow, (4) pull, (5) perfection <ref name="3a" /> '''3. Create flow'''
    20 KB (3,113 words) - 22:57, 28 February 2021
  • ...nning'', John Wiley & Sons Inc. Hoboken, NJ</ref>. Colleting the necessary information can be divided into two subgroups; primary and secondary data gathering <re Identifying the right stakeholders can provide access to information and knowledge. This is due to the fact that knowledge is not only embedded
    23 KB (3,510 words) - 12:29, 20 December 2018
  • ...ization and in-depth analysis does not form part of this article (for more information, consult the section ''Related Material''). ...ertheless, both benefits and risks are difficult to measure, since perfect information is almost never available. In part, [http://apppm.man.dtu.dk/index.php/Risk
    28 KB (4,072 words) - 12:48, 20 December 2018
  • ... der Veen (2005), Mental model mapping as a new tool to analyse the use of information in decision-making in integrated water management, Physics and Chemistry of The analysis of the current state is based on information found in the [http://en.wikipedia.org/wiki/Task_analysis task analysis]. Th
    15 KB (2,424 words) - 11:11, 20 December 2018
  • ...ilable, and the project management guide has to be revised to take the new information into account. ...to develop a project charter and Project Management Plan. It also includes information about how to direct and manage project work, and how to control the work.
    13 KB (1,877 words) - 11:09, 20 December 2018
  • ...right place at the right time in the right quality to achieve perfect work flow, while minimizing waste and being flexible. *Principle 3: Make the project '''flow''' continuously without interruptions.
    26 KB (4,088 words) - 12:07, 20 December 2018
  • ...e the final product gets handed over to the customer <ref name=four/>. The flow of the APM model is shown in Figure 1. ...kshops lessons learned will be discussed, and as all stakeholders get more information about APM, new projects can be initiated using the approach <ref>ESI Intern
    18 KB (2,884 words) - 14:18, 11 February 2021
  • ...ai, P. C. (2013). Applying Lean Production A3 to Enhance Construction Work Flow. Life Science Journal, 10(2).'' </ref>. ...n projects within the program. The status A3 report can provide systematic information across the organisation as input for program managers to systematically upd
    20 KB (3,185 words) - 12:28, 20 December 2018
  • The information available regarding risk management at portfolio level is fairly scarce. Me #The integration of risk information into project portfolio management is positively related to project portfoli
    23 KB (3,310 words) - 12:41, 20 December 2018
  • ...nates from the TPS, where the method is called “Material and Information Flow Mapping” and used to depict current, future or ideal states in the proces #Flow
    15 KB (2,404 words) - 11:12, 20 December 2018
  • ...is to mitigate poor multitasking. One initiative is to provide prioritized information to all resources. A relay race works as an analogy. While each component in ... again merging as the project has intermediate deliverables. These complex flow are not optimally compatible with deriving a feeding chain with accompanyin
    16 KB (2,526 words) - 12:04, 20 December 2018
  • ...le="height:10px; width:150px; text-align:left;" |11.6.1.3 Work Performance Information Work performance information related to various performance results includes, but is not limited to:
    23 KB (3,698 words) - 12:06, 20 December 2018
  • ''5. Flow and pace'' – The projects must deliver fast and often, thus the project s ...ship. However, consensus building must not over shadow the principle on “flow and pace”. There are countless tools that the project manager can make us
    14 KB (2,353 words) - 11:19, 20 December 2018
  • # Create '''flow'''. ...adding element or activity is key in a Kaizen Event. Current relations and flow between the elements are thus mapped in order to understand where to make i
    33 KB (5,037 words) - 12:30, 20 December 2018
  • When all estimated cash flow is converted to AW value, the value is assigned to every year of the projec ...vestment (ROI), this is the rate that accomplished the balance of the cash flow of a particular project to exactly zero considering interest rate. The comp
    23 KB (3,634 words) - 14:07, 11 February 2019
  • ...'Project Mandate'''. A Project Mandate is a document containing sufficient information about the project, for example why the project is important for the organiz ...to prepare the next stage of the project and provide relevant and accurate information to the project board, so that the decision for project continuation can be
    23 KB (3,577 words) - 15:37, 18 December 2018
  • ...ictable source of issues is here checked. Furthermore, the process gathers information to update the plan for next stages in order to follow the actual progress a ...he project. It does so by enabling the Board to be provided with essential information from the project manager. So to review the correct execution of the current
    30 KB (4,935 words) - 15:40, 18 December 2018
  • ...alue Management]] technique. Thirdly, by using the '''''Project Management Information System''''' you can access performance indicators, records and financial da ...akdown Structure (WBS)]], Scope Baseline and the Work Packages, which give information of the tasks that need to be completed in terms of resources needed, time t
    36 KB (5,576 words) - 15:22, 18 December 2018
  • ...kes place. The different tasks in the projects need to proceed in the same flow to create a constant progression without wasting time. The method is visual ...ment during execution, nor does it create a continuous and thus economical flow of resources.
    27 KB (4,029 words) - 08:18, 2 September 2022
  • ...ped continuing to the toolbox. In short, TPS is focusing on optimizing the flow throughout the whole production process and meet the costumers needs. Howev ... This will also make the production more flexible and create a much better flow in the production process. It is important to notice that this customer can
    19 KB (3,150 words) - 15:40, 18 December 2018
  • ...term Building Information Model (BIM) is introduced. A model used to store information of physical features and functionality of the facility as data that can be ...s add the time schedule along material's quantity, pricing and maintenance information to the 3D model. An upcoming feature of VDC is virtual reality, which gives
    19 KB (3,120 words) - 13:19, 18 December 2018
  • ...his, three important methods are evaluated: the TFV-model (transformation, flow and value), the Last Planner System and the Location-Based Scheduling; conc ...the difference between the information required to make a decision and the information available. There are two concepts attached to this<ref> ''Graham M. Winch -
    14 KB (2,243 words) - 15:02, 18 December 2018
  • ...nt. In this model (figure 4), there is a complete structure in the flow of information which is well controlled with the decoupling points and defines the desired ...e information. However, in the beginning of a project, as there is limited information available, uncertainty is further increased. To deal effectively with this
    38 KB (5,492 words) - 15:21, 18 December 2018
  • ...Institute there are five steps (Figure 2) to determine the entire managing flow of the process from the beginning to the end: ... to the important role that the environment plays in a company. The latest information technology, and decision making are also included.
    39 KB (6,222 words) - 15:41, 18 December 2018
  • *Create Flow; *Make those processes flow;
    23 KB (3,693 words) - 15:45, 18 December 2018
  • ...ment contractor, and he will be responsible for the subcontractors and the flow of resources. ..., but it could include a wish to reduce buffers in warehousing, by sharing information and co-ordinating the suppliers. The focus of a supply chain is to establis
    24 KB (3,737 words) - 13:06, 29 September 2015
  • ...y boxes (Picture 2). Each task has an Activity Identity Box which contains information regarding task name, duration, early start, early finish, late finish, late ...ion methods and equipments. CPM provides the projects manager with precise information on the effects of each variation or delay in the adopted plan and thereby i
    23 KB (3,695 words) - 14:56, 18 December 2018
  • ...ists of five principles; Specify value, Integrate the value stream, Create flow by eliminating waste, Establish pull and Seek perfection (see description b |3. Create Flow by Eliminating Waste
    17 KB (2,674 words) - 15:49, 18 December 2018
  • ... communicate each others to achieve the same goal and how people can share information in a larger scale. Visual communication is one of the methods used to communicate information or expression of ideas through a visual form.
    21 KB (3,183 words) - 15:46, 18 December 2018
  • ...rom the earliest stages of the project's life cycle. The lack of available information or knowledge are considered to be some of the basic reasons that cause unce ...rtunities that may occur during the project's life cycle. In figure 3, the flow lines show how the roots of uncertainties influence the project. The arrows
    20 KB (3,030 words) - 15:26, 18 December 2018
  • ...cholz, P.; Sacks, R.; Liston, K., 2008, "BIM Handbook: a Guide to Building Information Modeling for owners, managers, designers, engineers, and contractors"</ref> ...us on construction projects since the benefits achieved through the use of information modelling are especially applicable to the challenges of diversified constr
    30 KB (4,385 words) - 14:55, 18 December 2018
  • ...f screening all the options, the managers only identify the most important information and options. It follows that they cannot maximize their objectives. Rather
    13 KB (1,927 words) - 15:35, 18 December 2018
  • ...n to contractors there are electricians, carpenters, bricklayers, etc. The flow of the different projects is entirely dependent on the planning and interac ...veloped waste, and therefore a shift in the industry was needed, to a more flow-based management. Lean Construction was evolved, and in 1993, the term was
    25 KB (3,882 words) - 15:24, 18 December 2018
  • ...ere also has to be a very clear communication strategy, for information to flow efficiently within an organization. The duo needs to have a good chemistry
    17 KB (2,739 words) - 19:05, 28 September 2015
  • ...ng style, timing and channel, organizations ensure everyone can access the information they need, when they need it. ...ations-management-strategy </ref>. It controls the bi-directional flow of information with stakeholders, thus encouraging their engagement. PRINCE2™ <ref name=
    19 KB (2,722 words) - 14:58, 18 December 2018
  • ...is to mitigate poor multitasking. One initiative is to provide prioritized information to all resources. A relay race works as an analogy. While each component in ... again merging as the project has intermediate deliverables. These complex flow are not optimally compatible with deriving a feeding chain with accompanyin
    16 KB (2,522 words) - 14:10, 27 November 2018
  • The goal of PD is approached by producing useful information that reduces uncertainty and risk[7]. ...duct development phases, design decisions are made within the context of a flow of decisions[4], which implies that knowledge over the product, problems,
    10 KB (1,435 words) - 13:30, 21 September 2015
  • *maximize flow by using iterative development to reduce development time; ...particularly for the first few Sprints, this facilitates communication and information sharing.
    20 KB (3,205 words) - 15:13, 18 December 2018
  • ...//en.broad.com] ]][[File:1111.png |600px|thumb|right|BSB Project operation flow chart[http://en.broad.com] ]] ...because the Broad Town workshops were not fully constructed and production flow was not optimal at that time. Today a similar 17.000 m2 order can be produc
    30 KB (4,402 words) - 15:50, 18 December 2018
  • ...ps://blogs.commons.georgetown.edu/cctp-745-spring2010/files/organizational-information-requirements.pdf '''Summary:''' The article discuss communication medias us ...rruptions or a noisy ambience can be very disturbing for the communication flow.
    23 KB (3,593 words) - 14:50, 18 December 2018
  • : - Lack of information. * '''T-plant''': The general material flow is as described for the I-plant, but the T-plant produces many different pr
    11 KB (1,768 words) - 15:49, 18 December 2018
  • ...n is crucial tool for managing risks, allowing the manager to get detailed information about a specific risk. ...risk identification should always be seen in. The blue line represents the flow of sub-processes of risk management. The blue-line loop also indicates that
    22 KB (3,515 words) - 15:27, 18 December 2018
  • ...st step in a lean process should not only be to make value stream maps and flow charts, but to also understand the product portfolio in depth, and get to k ...s companies simplify their strategy, organization, products, processes and information technology.
    16 KB (2,321 words) - 10:02, 22 September 2015
  • ...ment contractor, and he will be responsible for the subcontractors and the flow of resources. ..., but it could include a wish to reduce buffers in warehousing, by sharing information and co-ordinating the suppliers. The focus of a supply chain is to establis
    25 KB (3,802 words) - 15:39, 18 December 2018
  • ...ere also has to be a very clear communication strategy, for information to flow efficiently within an organization. The duo needs to have a good chemistry
    19 KB (3,033 words) - 13:30, 20 December 2018
  • A learning organization evaluates projects to capture and interpret information that can benefit future projects by translating new knowledge into ways of ...s article describes the importance of learning in an organization, and how information is created, captured and interpreted, and used in future projects. It also
    26 KB (3,782 words) - 13:11, 18 December 2018
  • ...or would be communicated in real-time. Workers passed a card with capacity information between workstations. ...als used at one point in the production line was emptied, a card with this information was sent to the warehouse. There it would be a new batch ready to be transp
    25 KB (4,116 words) - 13:10, 18 December 2018
  • ...fectively workflow. The tool has the benefits that it discovers misleading information and makes sure the work is done in the right order and is planned as effect ...s was changed to improving the work flows reliability \textcolor{red}{work flow reliability?}. The change was a result of the knowledge that Glenn Ballard
    16 KB (2,706 words) - 12:46, 18 December 2018
  • ...ontractor or supplier and from the client (lack of fund to ensure the cash flow for a given milestone for example). ...2.png|500px |left | thumb| |'''Figure 7:''' An example of risk matrix. The information on top (consequences) may for example be used as acceptance criteria.]]
    37 KB (6,103 words) - 14:02, 18 December 2018
  • The technique developed in late 1950s utilizes information from a <span class="plainlinks">[https://en.wikipedia.org/wiki/Work_breakdo Based on acquired information from the '''CPM''', the next question could be if it is possible to shorten
    40 KB (6,164 words) - 14:05, 18 December 2018
  • ...work is one of the main focuses. The idea behind LPS is to create a steady flow by minimizing waste and constantly implementing reformation, all in order t ...to preparation. By doing this, weekly plans get more reliable and the work flow increases <ref>Ballard, G., & Howoll, G. (1998). ''Shielding Production: An
    26 KB (4,273 words) - 13:59, 18 December 2018
  • ...the source of various downfalls of a project, streaming from prevention of information sharing to decreased performance and unproductiveness. In order to prevent ...mation and hence continuing the group development with individuals lacking information and consequently decreased motivation.
    36 KB (5,281 words) - 13:10, 18 December 2018
  • ...worth mentioning that PERT does not include the quantity, quality and cost information, it only deals with the time constraints.<ref name=disadv1 /> PERT-CPM was ...the node represents an activity and the arrow shows dependency and project flow.<ref name=PMbook />
    36 KB (5,735 words) - 12:44, 18 December 2018
  • *'''Project information and contact information for additional detail''' [[Category:Project Management]][[Category:Uncertaity]][[Category:Information flow]][[Category:Tool]]
    39 KB (6,018 words) - 11:07, 16 November 2018
  • ...gation of each individual, each subsequent interrogation is accompanied by information regarding the preceding round of replies, usually presented anonymously. Th It is an essential project management technique used to gather information, the goal is to reduce the amount of different responses and reach the cons
    27 KB (4,208 words) - 13:08, 18 December 2018
  • ...ish buffers for some activities with high risks, that can allow the smooth flow of the project. He can allocate them also in different phases of the projec At early stages of the project, there is lack of details and information about it, thus the manager has to use one of the top down techniques like t
    19 KB (3,092 words) - 13:57, 18 December 2018
  • ...ion presented above, there are other methods, e.g. ''tables'',''graphs'',''flow charts'' and others, that may be better suited to represent the situation c ...tate the building process of a roadmap. Its focus is on the utilization of information that should mostly be available in an organization anyways.
    29 KB (4,260 words) - 14:04, 18 December 2018
  • ...hrough the utilisation of tools like the product backlog, all the required information can be easily found. *Through the use of Kanban and the cumulative flow diagram, the management team balanced the different steps of the process: t
    28 KB (4,298 words) - 14:07, 18 December 2018
  • * Are the correct drawings and information available? ...l more satisfied and balanced because they can achieve a better production flow and avoid the constant need of having to “put out fires” and take care
    20 KB (3,196 words) - 14:12, 18 December 2018
  • ...eduled work and the quality assurance. It can be argued that the stream of information was not carried in the most efficient manner. An example of the latter is t ...HEX team had to overcome the difficulties of restructuring the information flow inside the project, develop a solution to the crisis and implement a differ
    33 KB (5,053 words) - 13:00, 18 December 2018
  • ... [[Lean construction]] Theory. TFV stands for Transformation (operations), Flow (processes), and Value.''' ...non-value adding (waste) activities, and mainly controlling the processes (flow) in a project rather than the operations (transformations/activities) them
    22 KB (3,441 words) - 14:08, 18 December 2018
  • ...on of finding linkages with interdisciplinary impacts and multidimensional information <ref name="Lessons_Learned">Lessons Learned from War Room Designs and Imple ...nges. The war room is ideal to make quick and clever decisions, as all the information is visible to everyone and therefore tangible.
    28 KB (4,649 words) - 09:01, 7 April 2023
  • The linkages are flows of information, goods, services, and systems or processes adjusting activities.<ref name=p ...ages are extremely important and represent the cooperation and information flow between the value chain activities needed to run the activities.
    15 KB (2,272 words) - 13:05, 18 December 2018
  • *'''Mind Mapping''': A visualization technique used to organize information. A mind map is hierarchical and illustrates the relationships between pie *Position in the information flow network.
    19 KB (2,789 words) - 18:54, 8 May 2023
  • ...ifting tasks within their slack allowances". <ref> Schwalbe, Kathy (2007). Information Technology Project Management 5th Edition.</ref> ...struction and the arrows that connect the different nodes show the process flow. [Figure 1] It is possible to identify different types of activities like a
    18 KB (2,690 words) - 12:47, 18 December 2018
  • Gantt charts convey all the above mentioned information visually. They outline all of the tasks involved in a project, and their or ...ing project schedules. For this it is useful to be able to show additional information about the various tasks or phases of the project, for example how the tasks
    24 KB (4,080 words) - 12:34, 18 December 2018
  • ...udies, financing and the conceptual design. This phase is transforming the information to a machine-executable form. ...ommon goal, it was considered not necessary to communicate and interchange information on a detailed level because the plan was to work and meet the other team in
    22 KB (3,463 words) - 14:07, 18 December 2018
  • ...ork or value. Scrum Artifacts are designed to have maximum transparency of information in order to make them understandable for everybody. In addition to this, tr ...name="AF" />]][[File:AE.png|150px|right|thumb|Figure 3: Simple information flow. Source: Own Illustration, based on<ref name="AF" />]]
    26 KB (4,155 words) - 14:09, 20 December 2018
  • ...ot, where circle or ellipse are used instead the single points, and extra information are provided by varying the shape, the size and the colour. Furthermore the ...ameters could be used with the bubble charts in order to provide different information. Below the table show the most popular parameters used in the bubble charts
    19 KB (3,038 words) - 18:41, 19 September 2016
  • ...onal characteristics of a facility. BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cyc ...onal characteristics of a facility. BIM is a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cyc
    20 KB (3,114 words) - 13:59, 18 December 2018
  • ...SNA) appears recently as a technique that explore, maps and measure data & information flows and relationship between organizations, groups, people or other entit ... a low use of technology in their processes affecting the flow of data and information between the stakeholders creating conflicts and lowering the quality of the
    35 KB (4,877 words) - 12:34, 18 December 2018
  • ...ot, where circle or ellipse are used instead the single points, and extra information are provided by varying the shape, the size and the colour. Furthermore the This example will be analyzed and the information obtained from it will be explained; this will be helpful to have a genera
    23 KB (3,608 words) - 13:07, 18 December 2018
  • ...l product, efficiently '''linking''' them together to form a '''continuous flow stream of value'''.<ref name="VSA as lean">http://dspace.mit.edu/bitstream/ *'''Flow:''' seamless movement through value-creating steps.
    23 KB (3,502 words) - 12:43, 18 December 2018
  • <li>'''Performance Reports''' - Performance reporting gives information on the scope performance, comparing which deliverables have been completed ...he lessons learned through the project requires to be documented, and this information should be available to improve other projects in the future and probably no
    35 KB (5,350 words) - 16:21, 4 March 2019
  • ... create more lines in the table and replace the example text with your own information: |[[BIM-based information flow during construction phase]]
    4 KB (570 words) - 12:27, 8 December 2017
  • ... the construction industry often thought of as ''having a sustainable work flow''. A continuing increasing movement is however about to change the meaning. :* first-order information loops around static standards, and
    27 KB (3,835 words) - 13:35, 19 November 2018
  • ...location conflicts are marked with the red squares. By optimizing the work flow and reallocating resources between the tasks, an optimized schedule can be ... <ref name=Winch>Winch, Graham (2010), "Managing Construction Projects. An Information Processing Approach" Second Edition, Wiley-Blackwell, United Kingdom. ISBN
    19 KB (3,131 words) - 12:41, 19 November 2018
  • ...ss. Insecurity often result in withhold of important information about the flow and processes, and will consequent lead to delay and loss of value. One vit ...wiki/Muda_(Japanese_term) Muda]</span>) is often present within the a work flow system. This waste is identified by reflecting the current state. The futur
    19 KB (2,921 words) - 12:42, 19 November 2018
  • ...he output doesn't have be a physical product but can as well be a service, information or conducted paperwork as illustrated on Figure 1. Examples of defects that * Missing information in drawing material
    20 KB (3,048 words) - 10:00, 20 June 2017
  • ...mmon ways to rearrange or change the matrix to reduce loops of information flow or to let non-dependent activities run in parallel. Also the practical proc ...ction of buildings a simple Gantt chart may be of use to schedule the work flow of different tasks. Otherwise a CPM analysis (Critical Path Method), CCM an
    24 KB (3,853 words) - 13:31, 19 November 2018
  • ... less time is spend on queuing before being processed and the reduction of flow variation, resulting in continuous ongoing improvements. - Make the value adding steps flow without interruption
    21 KB (3,205 words) - 19:50, 20 June 2017
  • ...s changes since 1990, due to the growth of the internet, which changed the information flows on construction projects. These changes are grouped under the term e- ...esses. The evolution of ICT in the recent years has changed the process of information creation, storage and access. Through fixed ICT agreements the optimal foun
    18 KB (2,663 words) - 13:40, 19 November 2018
  • ...of [[Communication in Project Management]] enabling continuous information flow to translate the owner’s value preposition into a successful project. The ...s to see both the limitations and advantages of this method of information flow. First the paper will make a description and application of BIM during the
    17 KB (2,581 words) - 19:18, 20 November 2018
  • ...ling]</span> (BIM) which is a process that came to revolutionize the work -flow of the Architecture, Engineering and Construction (AEC) Industry. The fourt ...construct and manage buildings through a holistic approach and model-based information. Figure 1. shows the 7-dimensions of BIM.
    25 KB (3,674 words) - 19:21, 20 November 2018
  • ...t places the construction project manager as the key person in the project information flows. <ref> Winch, G. (2010). Managing Construction Projects. Wiley-Blackw ...formation flow during construction phase#Application|BIM-based information flow during construction phase § Application]]''
    24 KB (3,639 words) - 19:21, 20 November 2018
  • ... are fixed price, can do no more than manage the shape of the project cash-flow s-curve.<ref name="winch2">Winch, Graham M., Routledge, (2014) "Institution This paper synthesizes some of the information that exists around international construction industry productivity and com
    16 KB (2,368 words) - 19:24, 20 November 2018
  • [[Cash Flow in construction industry]] presents an aspect of utmost importance for the the accountant. Cash flow is an ongoing process, in which the project manager must cope with
    10 KB (1,571 words) - 20:02, 12 June 2017
  • ...ness of assumptions. It is also possible to use cause and effect diagrams, flow charts and influence diagrams. These methods for identifying risk sources, ..., with a three-step data flow <ref name=" PMI " />, is defined. Inputs are information used for the risk identification and the risk register is the product of ri
    21 KB (3,036 words) - 19:26, 20 November 2018
  • ===Discounted cash flow=== ...e exploitation of the project. This concept is referred as discounted cash flow.
    22 KB (3,435 words) - 19:25, 20 November 2018
  • Cash Flow in construction industry presents an aspect of utmost importance for the co the accountant. Cash flow is an ongoing process, in which the project manager must cope with
    10 KB (1,556 words) - 21:46, 12 June 2017
  • ... does not have to be a physical product but can just as well be a service, information or conducted paperwork as illustrated by Figure 1. Examples of defects that * Missing information in drawing material
    27 KB (4,004 words) - 12:46, 19 November 2018
  • ... less time is spend on queuing before being processed and the reduction of flow variation, resulting in continuous ongoing improvements. * Make the value adding steps flow without interruption
    21 KB (3,196 words) - 13:35, 19 November 2018
  • This page is mostly oriented for project management information-seekers students or practitioners. * Cash flow ([http://wiki.doing-projects.org/index.php/Cash_flow_and_milestone_payments
    15 KB (1,817 words) - 08:38, 9 August 2022
  • *Payback analysis – simply considers the cash flow of costs and benefits *Discounted cash flow – considers the ‘time value’ of cash flows
    4 KB (684 words) - 10:49, 16 November 2018
  • ...nties and strategy modifications. According to Simons they are "the formal information systems that managers use to monitor organizational outcomes and correct de ...y creating '''positive forces'''. According to Simons they are the "formal information systems managers use to involve themselves regularly and personally in the
    18 KB (2,592 words) - 09:30, 17 May 2019
  • ===Information gathering=== *System or process flow charts: shows how elements in the project interrelate.
    2 KB (250 words) - 11:26, 13 August 2017
  • ... financial measurement. Is the classic organisations measurement like cash flow, income, return and more like it. Dependent on which phase the organization Also that it is dependent on the information given to the tool. if wrong information gets in the wrong info comes out.
    20 KB (3,246 words) - 18:23, 17 November 2018
  • *Design an optimum flow ... the week is to develop solutions to eliminate critical waste, develop new flow scenarios with new standard work combinations, prioritize changes, plan the
    22 KB (3,436 words) - 18:25, 17 November 2018
  • ...gement decisions; reveals and defines both methodicalness and slack in the flow plan or the network of sequential activities that must be performed to meet In this model, the activities are represented as boxes with all the information and the events as the arrows linking them.
    14 KB (2,198 words) - 18:26, 17 November 2018
  • ...He is usually responsible for the P&Id (explanation later) and the process flow diagram and development. ...d each team member has to acknowledge their definitions. At the same time, information about the plant’s design/operating data are gathered.
    22 KB (3,365 words) - 18:24, 17 November 2018
  • ... B could be assumed due to the uncertainty of the future. As a result, the flow in the project plan will be altered<ref name="PMIPRO"></ref>. |+'''Table 1:''' General flow Vs Scenario-based flow of project plan <ref name="PMIPRO"> Craddock, W. T. (2009) "''What are the
    25 KB (3,832 words) - 13:02, 23 November 2018
  • ... system is providing information about the progression of a project. These information should be available in a time range that allows the project manager to even Performance reporting needs to provide information at an appropriate level for each audience as it is delivered the project ma
    21 KB (3,096 words) - 09:23, 30 September 2017
  • ...croll through the entire project life cycle. Figure 2 discloses the system flow and output of Teamweek. Additionally, the scrolling calendar allows more lo ** Introduction to “Total Information Transfer System” an internet-based project management system mainly used
    22 KB (3,261 words) - 18:44, 17 November 2018
  • [[File:scopecreep2.png|400px|thumb|right|Flow chart: How to deal with a scope change request ]] ...t and Develop it). The source is highly relevant in terms of more academic information and includes many real life examples.
    16 KB (2,718 words) - 15:41, 21 December 2018
  • ... and a preliminary technical assessment. The market assessment will gather information about the market and will try to determine the potential future market posi ...decision on the idea screen gate with the consideration of the most recent information gathered from the stage 1. At this gate additional criteria may be added, d
    31 KB (4,877 words) - 18:47, 17 November 2018
  • ...or any program or portfolio, where there is a more or less uninterruptible flow of projects that starts and ends, are the capabilities of the persons who l ...lem. Project managers must be able to; focus on the project goals, analyze information, use and follow a decision-making process, involve team members in the deci
    20 KB (2,979 words) - 18:52, 17 November 2018
  • ... it is important to ensure any implications are accounted for. The process flow of Scope Change Control includes inputs, tools and outputs. This is depicte ... carries corrective actions. All learnings must be documented so that this information is available for future projects
    20 KB (3,134 words) - 18:51, 17 November 2018
  • ...s V-Model vs Agile: A Comparative Study on SDLC", International Journal of Information Technology and Business Management (JITBM), 2012 </ref>
    17 KB (2,562 words) - 18:41, 17 November 2018
  • ...L. A.H.M., Natrop M. (2015) BIM ON THE CONSTRUCTION SITE: PROVIDING HIDDEN INFORMATION ON TASK SPECIFIC DRAWINGS, ITcon, Vol. 20, 97, ISSN 1874-4753'' </ref>. Thi ...h <ref test=''(Hattab, 2013)''> ''Hattab M., Hamzeh F., (2013) INFORMATION FLOW COMPARISON BETWEEN TRADITIONAL AND BIM-BASED PROJECTS IN THE DESIGN PHASE,
    17 KB (2,647 words) - 18:54, 17 November 2018
  • ...from the project manager’s side is all that is required for a project to flow much more smoothly. Incidentally, both of these theorems are somewhat appli ...ontact” is a confidential knowledgeable person in the U.S., who provides information regarding the ADS-B system used in the tracking system.]]
    15 KB (2,306 words) - 18:55, 17 November 2018
  • ...ir contractual obligations. It involves decision-making and timely flow of information to achieve project goal in conformity with the contract documents. In pract : Focuses on collecting and analyzing information to provide assurance to the customer that progress is being made in line wi
    25 KB (3,660 words) - 18:01, 17 November 2018
  • A ''network'' is a flow diagram constituting of activities and events that are connected logically Such estimation information can be used for this step of the process.
    15 KB (2,346 words) - 19:01, 17 November 2018
  • ''“A strategy for flow efficiency, with key principles just-in-time and visual management”'' • '''Flow:''' The product should go through the production process, which should only
    27 KB (4,416 words) - 19:02, 17 November 2018
  • ...ect, about what happened. The outcome of these measurements do not provide information about the cause of that result nor what to do about it <ref name="amara">Am * performance measurement should convey information through as few and as simple a set of measures as possible
    24 KB (3,457 words) - 18:53, 17 November 2018
  • Collecting all information on a spreadsheet or worksheet ensures full transparency and high commitment ...s a crucial part of the goal setting as it strongly influences the project flow.
    30 KB (4,310 words) - 12:46, 8 May 2023
  • Decision Tree is a graphical method for illustrating the flow of decisions faced on a project depending on the possibility of each decis ...e relationship among various actions and thereby, is representation of the flow of events, and as such, stays robust with a little chance for errors, provi
    23 KB (3,467 words) - 13:07, 23 November 2018
  • ... how it is applied to various management standards to achieve optimal cash flow in systems. The book was first published in 1984 and since has been revised ...of 2017 and its content is able to be verified by similar articles and the information they value. </ref>. Bottlenecks often results in slow production times, sur
    24 KB (3,740 words) - 19:10, 17 November 2018
  • ... projects is by ensuring that the people/teams are communicating the right information at the right time. But in order to do that, it is first and foremost necess ...es of interdependency data can be represented on a DSM. They can represent information relations among components of a product, teams working on a project, activi
    14 KB (2,154 words) - 18:50, 17 November 2018
  • *'''''Payback Period''''' - simply considers the cash flow of costs and benefits ...n stage is a rather challenging task, due to the lack of available project information. Therefore, cost estimation models using parametric computational methods
    29 KB (4,381 words) - 19:30, 20 November 2018
  • ... create more lines in the table and replace the example text with your own information: |[[Cash flow & payment milestones ]]
    8 KB (1,000 words) - 09:28, 18 February 2019
  • ...uring meetings as a decision-making technique, as a planning tool or as an information gathering technique.<ref name="PMBOK" /> Furthermore, it can play a large r ...g ideation. During for example brainstorming there is a fluctuation in the flow of ideas, this technique can facilitate the generation of new ideas.
    21 KB (3,311 words) - 09:53, 4 February 2019
  • ...rkshops. These inputs, tool, and techniques are illustrated in the process flow of the define scope process in Figure 2 and defined here below in a detaile ...r, lesson learned, stakeholder register, past project files and historical information.<ref name="PMG"/> <sup>(p.122)</sup>
    22 KB (3,424 words) - 15:37, 16 November 2018
  • ...art-time resources. These may be both internal and external. Based on this information, ::*Control the flow and availability of user resources
    20 KB (2,933 words) - 18:49, 17 November 2018
  • ...gineering. [Online]' </ref> The possibility of concentrating knowledge and information without moving to the same location has facilitated and enhanced the way CE ...f implementing new process in an already established and incorporated work-flow, is it a good idea to include the processes included as a project deliverab
    22 KB (3,313 words) - 08:59, 11 January 2019
  • ...used in monitoring and controlling processes in projects, but also provide information of what a KPIs is, and how to visualize the data measured in the KPI. ...business and corporate level in an organisation, but also showing that the information that KPIs give should be limited to the part organisation that uses it.
    19 KB (2,905 words) - 17:30, 16 November 2018
  • ...s, along with their strengths and weaknesses are described in Table 1. The information in Table 1 is taken directly from “The Nine Belbin Roles” <ref name=Bel ...nted. A project manager of such a team should be aware of when to stop the flow of ideas and pick one to continue working on.
    23 KB (3,609 words) - 17:12, 16 November 2018
  • ... team. If a project manager can form an optimal team, there will be a good flow in the Five Stages of Group Development. It is of the upmost importance tha ...follow. This can be guidelines for working hours, dress code, how to share information or how a certain process should be performed. The project manager should su
    30 KB (4,516 words) - 17:16, 16 November 2018
  • ...ns for the board and other major stakeholders on how relevant and reliable information are exchanged between them. Summarizing, project governance helps to: ...nt and (corporate) governance. It institutionalizes a targeted information flow that enables the building of necessary knowledge. With this strategic orien
    26 KB (3,691 words) - 17:19, 16 November 2018
  • ...and external to the project. The strategy establishes a controlled flow of information which seeks to facilitate engagement with stakeholders.<ref name="prince2"> ...n? Where should the information be stored, and in what format? How can the information be retrieved? Other considerations such as time zones, language barriers, a
    15 KB (2,291 words) - 17:21, 16 November 2018
  • ...rket matrix:''' also referred to as Ansoff matrix, is a tool that provides information about the risk of growth/expansion in other markets <ref name="r"> ''Rober ...roximately 11x17 inches), is a status report that helps managers to gather information into a visual form facilitating the comprehension when communicated with ot
    27 KB (4,209 words) - 16:55, 16 November 2018
  • ...Two main concerns, that are crucial in Project Cost Management are '''cash flow''' and '''payment milestones'''. ...d project. Similarly it is with payment milestones, which are part of cash flow organisation and planning.
    18 KB (2,744 words) - 17:21, 16 November 2018
  • ...the construction phase, and not creating a continuous, and thus financial, flow of resources<ref name="lbs" /><ref name="imp" />. ...e to CPM. It implies a shift in focus from primarily the activities to the flow of work through the various locations of the project. LBS is a scheduling m
    33 KB (5,054 words) - 08:38, 26 February 2018
  • ...e development phase is more crucial than the planning phase, namely within information systems and technology projects <ref name=" Scrum " />. ...iven process. The purpose of using burn-down charts is to provide relevant information about these progress in an easy-to-comprehend manner. This is especially re
    25 KB (3,916 words) - 17:40, 16 November 2018
  • ... to earn revenue. The project manager needs to think about budget and cash flow throughout the project life cycle. ... project manager when addressing different stakeholders and when gathering information from these. The theories included are research-based and the book provides
    16 KB (2,532 words) - 17:29, 16 November 2018
  • ..., Institutional client, customer) and Risk Management Area, the forecasted information(indicators) after being processed is beneficial to the organization specia = Building Information Modeling (BIM) Analysis 3D =
    25 KB (3,945 words) - 17:30, 16 November 2018
  • ...ner” of the project, the person who paid for the work and controlled the flow of the money. Turner made the distinction between the sponsor as the owner ... includes lists of what the sponsor should do. However, it is hard to find information about what the sponsor needs to do to fulfill the sponsor's role effectivel
    29 KB (4,309 words) - 17:42, 16 November 2018
  • ...raction between team members and the environment. On the figure below, the flow of inputs, tools and techniques, and outputs of developing project team are * Information for the manager on how to strengthen relationship
    20 KB (2,926 words) - 17:20, 16 November 2018
  • ...ocess and inspire the future changes to the projects. It provides valuable information for the potential investors. ...orary costs, permanent costs, etc. The study should show the expected cash flow scheme. Moreover, the expected spendings may change throughout the project,
    19 KB (3,094 words) - 17:46, 16 November 2018
  • #'''Structure''': transformational flow, themes, blueprint, tranches. ...the outer ring, the principles, governance themes and the transformational flow will be explained in depth to demonstrate how they each contribute to provi
    23 KB (3,453 words) - 17:47, 16 November 2018
  • ''Data'' is defined as "reinterpretable representation of information in a formalised manner suitable for communication, interpretation, or proce ...y, and pragmatic quality''<ref>2015 ed. ISO 8000-8: Data Quality - Part 8: Information and data quality: Concepts and measuring, ISO</ref>. As illustrated in figu
    27 KB (3,985 words) - 17:14, 16 November 2018
  • ...ction increase efficiency and support maintaining sufficient communication flow. More organized work often results in increased motivation, awareness of th The flow of Schedule Development is determined by the steps (see Figure 1.) :
    22 KB (3,339 words) - 22:06, 28 February 2018
  • ''Enterprise Environmental Factors'' is the public information that affects the portfolio e.g. academic studies and benchmarking among oth ...s and techniques<ref name="SPM" /> are called ''Documentation Reviews'', ''Information Gathering Techniques'', ''Checklist Analysis'', ''Assumptions Analysis'' an
    27 KB (4,134 words) - 15:20, 16 November 2018
  • .... For example in civil engineering, constructions, mechanical engineering, information technology etc. Effective collaboration is crucial to the success of a pro ::*Control the flow and availability of user resources
    24 KB (3,471 words) - 15:30, 16 November 2018
  • ...pe baseline control, build a communication plan to improve the information flow, asses stakeholder needs and get the commitment of the internal stakeholder ... the sequential relationship in mind, it is important to know that in this flow of processes, the tasks are pushed by the team leader to the project team m
    18 KB (2,845 words) - 17:10, 16 November 2018
  • ...ve a software tool that can help organize and manage the increased flow of information and degree of details.
    3 KB (518 words) - 12:07, 26 February 2018
  • ...the construction phase, and not creating a continuous, and thus financial, flow of resources<ref name="lbs" /><ref name="imp" />. ...e to CPM. It implies a shift in focus from primarily the activities to the flow of work through the various locations of the project. LBS is a scheduling m
    33 KB (5,149 words) - 17:23, 16 November 2018
  • ...ve a software tool that can help organize and manage the increased flow of information and degree of details as the project progresses. ...es between the building owner and the supplier. ''Risk register'' involves information associated to the identified risks which leads to the next input. ''Risk co
    21 KB (3,480 words) - 15:31, 16 November 2018
  • ...measure of progress and the pace of work, both possibly affecting the cash flow and payments. ...y for those activities that are performed in the first iteration. For cash flow estimates it is crucial to consider the amount and duration of the iteratio
    25 KB (3,713 words) - 17:35, 16 November 2018
  • ...ction increase efficiency and support maintaining sufficient communication flow. More organized work often results in increased motivation, awareness of th The flow of Schedule Development is determined by the steps (see Figure 1.) :
    22 KB (3,389 words) - 15:07, 16 November 2018
  • ... information), or nD (energy, sustainability, facilities management, etc., information) representations of a project. ...project management software does more than automate tasks. It connects BIM information and people, helping to increase productivity and lay the digital groundwork
    27 KB (4,169 words) - 18:54, 4 March 2019
  • ...assist project managers to complete the tasks within the given time frame. Information given in this category is for example how to plan and develop a schedule an ...le ways for information flow within the team and how to collect and manage information concerning the project. The category consists of two parts. The first part
    23 KB (3,665 words) - 18:00, 2 March 2019
  • ...ituation and shares the information with its supervisor. At this time, the information about the critical situation is not visible outside the project or organiza The second step is to determine the facts, which includes reconstructing the information to obtain the facts and recognizing the problems which will be encountered.
    27 KB (4,214 words) - 20:34, 4 March 2019
  • ...icted by a boundary. In an open system, this is a permeable boundary since information, energy, or matter is exchanged with and received from outside, but in a cl ::*'''Stock and Flow Diagrams''': used when the dynamics associated with the loops are also diff
    24 KB (3,691 words) - 21:51, 4 March 2019
  • ...ct management tools, decision-making techniques, risk assessment tools and information communication technology support tools. #General information about the project
    20 KB (3,041 words) - 15:35, 2 March 2019
  • ...dustry Institute''': "''... the process of developing sufficient strategic information with which owners can address risk and decide to commit resources to maximi ...ioned above the need to make the best possible decision based on the given information at that stage. This will eventually lead to the Project Management Office c
    26 KB (3,756 words) - 21:03, 4 March 2019
  • ... highly recommended to be familiar with this management technique (precise information can be acquired about the EVM here: [[Earned Value Analysis]]). Then it aim ...forms the project’s measurement baseline".'' It contains all the planned information which is needed in order to perform the monitoring process, that is to say
    24 KB (3,740 words) - 11:47, 4 March 2019
  • This article will focus on, how Cash flow and milestone payment <ref name=Milestone> ''O'Brien, Dan & Revell, Grant The two fundamental ideas of cash flow and milestone payments will be described, and to get an idea of how to impl
    21 KB (3,634 words) - 18:58, 4 March 2019
  • ...f artifacts and implementation of activities designed to achieve effective information exchange"'' <ref name=pmbok> Project Management Institute (2017), A Guide t The attributes are descriptions under each class indicating additional information that should be considered in the part-of. It can be constraints e.g. no pro
    21 KB (3,360 words) - 14:24, 4 March 2019
  • *''When plotted out, it should form a logical flow in a unidirectional way. *''Needs to be updated regularly with the most recent information.
    14 KB (2,237 words) - 22:25, 6 May 2019
  • ...ferent inputs needed to complete a project schedule. Illustration based on information from A Guide to the Project Management Body of Knowledge (PMBOK® Guide) <r ...see a simple milestone plan in figure 2. The figure displays the logically flow milestone to milestone and shows that it is logically impossible to obtain
    16 KB (2,589 words) - 15:44, 4 March 2019
  • ...oject management and is defined as the intended or involuntary exchange of information. <ref name="Pmbokguide">''Project Management Institute. A Guide to the Proj ...fter this article was published, Warren Weaver recognised that Shannon’s information theory and model has a wider potential for the general communication theory
    23 KB (3,394 words) - 11:52, 5 March 2019
  • ...ogy, toxicology and drug metabolism. This phase helps to gather sufficient information to secure clinical trial application required for clinical studies in human ...ce evaluations. It establishes the pharmacokinetic profile and it provides information about the efficacy of the new drug in healthy human volunteers.
    24 KB (3,660 words) - 16:32, 3 March 2019
  • ..., the portfolio manager works closely with the project managers to: Gather information to monitor the performance of the portfolio, identify and resolve issues wi ... cover their accounts payable or they are going to experience serious cash flow problems.
    21 KB (3,090 words) - 21:12, 4 March 2019
  • ...y. There are few main points which need to be considered when implementing flow: To assist the progress of safe and fast flow through the system, it is needed to limit the size of work batches;
    25 KB (4,038 words) - 11:58, 11 February 2021
  • ...ities and their root curse, well-argued management decisions based on such information and can ensure a gradually increase of the performance. It focuses on creat ...t is obligated to follow the QMS and make decisions based on the collected information from it. These decisions must be made using a risk-based approach. Manageme
    24 KB (3,763 words) - 21:23, 4 March 2019
  • ...o PPM could be planning accuracy, employee development and availability of information.<ref name="Align" /><ref name="Niven" /> When this as the last perspective | The information and communication flow between projects and programs is not clarified, and as a result, we have li
    33 KB (5,064 words) - 06:36, 23 April 2019
  • ...ally tree structure, as it shows a certain framing of the system, and when information is spread across documents, it can be difficult to understand a particular ...rally two photos may show similar elements, but they will depict different information about these elements to make you understand the entire properties of the mo
    21 KB (3,140 words) - 23:01, 4 March 2019
  • * Functional flow diagrams ...and improve performance. To re-evaluate outputs should be observed and the information should be used to modify the system, the inputs, the product or the process
    18 KB (2,733 words) - 22:47, 4 March 2019
  • ...'media richness''' (or '''information richness''') refers to the amount of information a medium is capable of transmitting per given time unit. ...and email correspondence, have different characteristics in terms of their information capacity and transfer rate as well as notable advantages and disadvantages.
    48 KB (6,651 words) - 21:57, 1 March 2019
  • ... finance and loan conditions be considered since the quality and amount of information processed is enhanced leading to wise decision making. It is considered a g ... consultants are accused of inadequate disclosure to investors of material information that define a project when it comes to selling equities, due diligence defe
    19 KB (2,792 words) - 22:58, 4 March 2019
  • ...g tools and is a graphical way to explain and display the schedule-related information. The tool displays each activity and the duration, and clarify what should ''"A graphic display of schedule-related information. In the typical bar chart, schedule activities or work breakdown structure
    21 KB (3,244 words) - 21:47, 4 March 2019
  • ...cluding government regulations, industry conditions, 
project management information system (PMIS), scheduling tool, or work authorisation system (WAS). ...quence activities can benefit from additional descriptive data provided by information related to activity characteristics in templates.
    20 KB (2,936 words) - 18:29, 4 March 2019
  • *External Information Attacks- copyright infringement, loss of information, counterfeiting, Rumors ...smoother transition of information than others. This efficient information flow reduces the uncertainty levels driving a chain reaction in the reduction of
    28 KB (4,023 words) - 16:55, 4 March 2019
  • ...inability to mobilize resources right, the decision-making and information flow lacks, and the execution of the strategy becomes ineffective<ref name="Kate ...tructure. The figure is created by the author of this article and based on information given/showed in <ref name="Temo"/>]]
    24 KB (3,629 words) - 19:27, 4 March 2019
  • ...e involved to perform teamwork in a project. For example in constructions, information technology, mechanical engineering, civil engineering etc. Effective collab *Communication and information sharing
    29 KB (4,491 words) - 12:47, 4 March 2019
  • ...ogy, toxicology and drug metabolism. This phase helps to gather sufficient information to secure clinical trial application required for clinical studies in human ...ce evaluations. It establishes the pharmacokinetic profile and it provides information about the efficacy of the new drug in healthy human volunteers.
    25 KB (3,831 words) - 20:24, 3 March 2019
  • '''Progress Management''' is vital to get information on how the project is performing in comparison with the initial plan of ach ...ol for the company to increase the efficiency of information and knowledge flow.
    5 KB (550 words) - 11:03, 15 March 2020
  • ...tes and creates an overview of the progress/phase of the project and gives information related to time, costs, and resources (planned and actual) <ref>[https://ww ...n organization evaluate how well their goals are achieved. KPI’s provide information about how the department performs in relation to its goals and as well wher
    8 KB (1,232 words) - 09:27, 4 March 2020
  • *'''Structure:''' transformational flow, themes, blueprint, tranches. ...e desired value and different tools are used in order to map the benefits. Information about the beneficiary, the time and the life span of the outcomes are analy
    28 KB (4,232 words) - 08:06, 11 May 2020
  • ...ers/WP1018_Business_Case.pdf' </ref> is a document which containts crucial information about the project. It explores all feasible approaches to a given problem t An interview is a formal or informal approach to elicit information from stakeholders by talking to them directly. It is typically performed by
    22 KB (3,451 words) - 10:47, 9 March 2020
  • The information flow from project management to portfolio management is essential for the succes ''This area defines how the information and decisions are shared throughout the structure.''</li>
    17 KB (2,578 words) - 10:53, 9 March 2020
  • ...ovides a better understanding of how the flow of materials and information flow through the value stream.
    15 KB (2,286 words) - 10:08, 9 March 2020
  • ...rvice on the horizontal axis. The resulting matrix allows to represent the flow of actions that each role needs to perform along the process, highlighting ...service delivery, and their mutual links (e.g. flows of materials, energy, information, money, documents, etc.). The system map clarifies how the different servic
    23 KB (3,317 words) - 19:55, 7 March 2020
  • ...to understand their team members' needs and motivations. They can use such information to create the most efficient work environment which will aid the quality of It shows the information flow and response to IT. This cut across the structure of an organization; after
    49 KB (8,109 words) - 08:48, 10 March 2020
  • ...f data representation includes affinity diagram, cause-and-effect diagram, flow chart and histogram. For instance, can flow charts illustrate the steps in a process, that lead to a defect or failure.
    18 KB (2,586 words) - 08:35, 9 March 2020
  • ... it is essential to create communication channels and increase information flow to keep the stakeholders satisfied. The interest vs. influence matrix offer Based on the information from the interviews a SWOT analysis was carried out. It seems that the main
    20 KB (3,180 words) - 09:58, 12 May 2020
  • * be based on the best available information 3. By eliminating waste, create value flow
    19 KB (2,850 words) - 13:46, 9 March 2020
  • '''Title: Elaboration of the Processes Flow of the PMBOK® Guide 6th Edition''' ... The video is based on the PMBOK® Guide 6th Edition and it focuses on the flow of the processes and their interactions.
    5 KB (610 words) - 10:36, 8 March 2020
  • '''Title: Transformational Flow - Managing Successful Programmes''' '''Title: Transformational Flow - Managing Successful Programmes'''
    5 KB (577 words) - 09:46, 22 March 2020
  • ...best optimise and deliver the final value for the client. Below is shown a flow chart of a TVD design process chart. [[File:IrritativeDesignProcess.png|40 The initial five steps of the flow chart all concern establishing or verifying the clients project visualizati
    21 KB (3,432 words) - 16:30, 8 March 2020
  • ...erent stakeholders and investors and handle the work-, risk- and resources-flow as the project proceeds.[2][3] # Gather information; Collect all the information and documentation on the project.
    15 KB (2,615 words) - 21:17, 22 March 2022
  • ..., and deliver a good or service to a customer, including the dual flows of information and material".<ref>Martin, K; Osterling, M (2013): Value Stream Mapping, Ho ...ean?'' In lean manufacturing, the focus lays on creating a smooth and even flow of work, by using small batch sizes, reducing work in progress (WIP), preve
    34 KB (5,230 words) - 15:14, 27 February 2021
  • ''Lag measures'' are previous information and can help to understand where the project currently stands. These are me ...nds. All lead measures should also be on the board and their progress. The information on the board is to be updated regularly so that the team knows exactly wher
    19 KB (3,259 words) - 20:13, 28 February 2021
  • ...ves as the baseline of the communications plan by stipulating who receives information, how frequently, and at what level of detail.” To gain advantage of the R ...e of the informed, as a project manager has to compile all project-related information.
    34 KB (5,119 words) - 16:18, 24 February 2021
  • ...e work and personal life of people are constantly changing and involves an information overload that no system can describe or coordinate. To cope with the comple ...o sift through massive amounts of information to obtain the most important information' '' <ref name = "PMBOK3"> p. 62, Project Management Institute (PMI). (2017)
    23 KB (3,700 words) - 15:47, 9 May 2023
  • ...g a beautiful design feature, nor have the software specialist analyze the flow of material through the nozzle of the printer head. Obviously assigning peo ... go through three major critiques of Maslow's theory. This is based on the information found in the Book "Employee Motivation In Saudi Arabia; An investigation In
    22 KB (3,540 words) - 15:50, 28 February 2021
  • ...ifically on their use by project managers. It will explore the fundamental information needed before implementing a Gantt chart and how to work with a Gantt chart To ensure a Gantt chart has the appropriate information it is necessary to implement a framework such as the Work Breakdown Structu
    28 KB (4,389 words) - 16:14, 26 February 2021
  • ...hat interrupt their work, while also complaining if they don't have enough information through meetings and feeling left in the dark. Good meeting practices is al ...e meeting. If too few people are attending the meeting, there might be key information that is missing in order to make the correct decisions, while also possibly
    23 KB (3,960 words) - 21:46, 28 February 2021
  • ...mentation and processes the project should have. Due to this informal work flow it is easy to forget creating essential documentation.<ref name="Laron"> La ...</ref>. This document does not have to be very formal and contain a lot of information. Keep it to one or two pages and primarily describe content in bullets. The
    20 KB (3,245 words) - 21:51, 28 February 2021
  • ... Variation orders must be clear and detailed without leaving any important information related to description of the work, pricing and timing missing. ...ry carefully. Variation orders should particularly involve below mentioned information in order not to be the source of conflict/dispute later on between the agre
    20 KB (3,081 words) - 20:24, 25 February 2021
  • ...tion phase. Gantt Charts can be either very simple or contain more complex information, as milestones, dependencies, critical paths, responsibilities, and resourc ...he project. Gantt Charts can be either very simple or contain more complex information, as milestones, dependencies, critical paths, responsibilities, and resourc
    27 KB (4,317 words) - 19:16, 22 March 2021
  • The Kanban idea was originated from the observation of the product flow in supermarkets. The customer buys what is sufficient and necessary, knowin #'''Manage flow:''' Bottlenecks or waiting times in systems are a major concern, as they wi
    23 KB (3,587 words) - 11:16, 27 February 2021
  • ...s. Project reporting involves the process of collecting day-to-day project information and distributing necessary updates to relevant stakeholders.<ref name="PMBO ...rnally to a client or customer. The internal version is providing detailed information regarding task fulfilment, explanations and forecasts. This data is usually
    28 KB (4,209 words) - 16:14, 27 February 2021
  • The general steps are described in an attempt to provide a general flow model of SWOT analysis: <ref name="Chermack"> Chermack, T.H, Kasshanna, B.K *It is a flexible model which can incorporate corporate or market information systems on request. <ref name="Piercy"> Piercy, N., Giels, W. (1989). Makin
    23 KB (3,386 words) - 22:55, 28 February 2021
  • ...making individual remarks for each of them as they provided with important information that led to the composition of this article. ...efore creates a commitment that a defective part or handling of inaccurate information should never proceed to the next process. The end-result concluded by follo
    29 KB (4,462 words) - 14:46, 30 March 2022
  • ...project failure: an examination of the key factors," Journal of Enterprise Information Management, vol. 30, pp. 142-165, 2017</ref> <ref name="unsucc1">T.R.A.J.S. ...by a team internal to the company that could provide them useful pieces of information which will be translated into code or upload to a specific page. For exampl
    21 KB (3,376 words) - 16:22, 27 February 2021
  • ... main issues address these challenges are Information distortion, delay in information, miscommunication between key stakeholders, conflicts between the client an As the name states the amount of information is limited and it becomes more difficult to predict the future outcome. Sin
    20 KB (2,952 words) - 07:41, 22 February 2021
  • .../ref> However, this approach can cause major errors and provide misleading information. As projects are complex processes that involve a large number of aspects a ...toring method, such that one single graph contains a much larger amount of information on the project.
    34 KB (5,280 words) - 18:00, 8 March 2021
  • ...rt of three other and just as important criteria of success including; the information system, the benefits to the organization, and the benefits to the stakehold ...throughout all of these from the PMBOK Guide's<ref name="PMBOK" /> process flow; '''planning''' and '''controlling'''. The general assessments having to be
    29 KB (4,468 words) - 16:54, 28 February 2021
  • ...tion Management is grouping processes based on the requirement to meet the information needs of a project and relevant stakeholders. The study revealed that the m In order to manage the flow of information throughout the functional departments, the respective article discusses the
    28 KB (4,023 words) - 20:49, 28 February 2021
  • ...he cycle time is a valuable metric to monitor as it provides the user with information how long one certain process step takes. In comparison to the lead time, th ...cal equation coming originally from queuing theory linking the three basic flow metrics cycle time, lead time and throughput in a system. Changing two of t
    28 KB (4,386 words) - 15:23, 27 February 2021
  • ... similar in a project management context; without critical project-related information at a glance, it can become difficult for the project manager to drive/contr ...ument panel dashboards, but instead on digital dashboards that display key information needed to achieve objectives in a business or project-related context. Thes
    30 KB (4,539 words) - 22:36, 4 March 2021
  • ...nd breakdown a variety of tasks with different due dates and large project information. A Gantt Chart consists of an activity list or a work breakdown structure ...ting tasks, planning, list of resources, previous and new incoming project information, deliveries, milestones, monitoring etc. [1]
    13 KB (2,081 words) - 17:50, 28 February 2021
  • ...anagement during execution and for not providing a continuous and economic flow of resources<ref name="lbs" />. ...al overview of the project schedule, which helps in achieving an efficient flow of activities. You can adjust the activities if you want a greater distance
    18 KB (2,805 words) - 13:47, 28 February 2021
  • ...rstood as preplanned and predefined phases followed in a linear sequential flow. This approach is no longer sufficient as today´s business environment is Areas to be investigated are market, user needs, trends, and other sources of information. Different techniques can be used to effectively progress this phase. The D
    18 KB (2,761 words) - 22:51, 28 February 2021
  • *transparent sharing of overall information .... Instead of explaining this in a message in a channel, you can store this information centrally in the wiki app.
    21 KB (3,150 words) - 22:56, 28 February 2021
  • ...on. Change orders must be clear and detailed without leaving any important information related to description of the work, pricing and timing missing. ...on project management. The main goal of the article is to provide accurate information regarding the change orders and its impacts on construction projects. It ca
    27 KB (4,217 words) - 17:47, 28 February 2021
  • ...ealing with various stakeholders, and designing suitable knowledge sharing information is critical because of unforeseeable project actions and uncertainty <ref n ...tion-related issues address challenges in Information distortion, delay in information, miscommunication between key stakeholders, conflicts between the client an
    33 KB (4,804 words) - 21:10, 28 February 2021
  • [[File:Sankey_Diagrams_01.png|470px|thumb|right|Sankey diagram of flow of information between countries<ref>"[https://www.originlab.com/doc/Origin-Help/Sankey-Di ...ganization has. The Sankey diagrams are a graphical way of visualizing the flow of resources in a team, project, process, company, etc. Resources mapped in
    34 KB (5,629 words) - 09:04, 22 March 2022
  • ...l S., “FMEA AND PMBOK APPLIED FOR PROJECT RISK MANAGEMENT”, Journal of Information Systems and Technology Management, Vol. 5, No. 2, p. 347-364, 2008, DOI: 10 ...e taken into consideration. To collect accurate, useful, and comprehensive information about the investigated project, the responsible team can get help through i
    31 KB (4,532 words) - 12:23, 19 March 2022
  • ...l to get key stakeholders ready for project transitions. Secondly, getting information from stakeholders has a great impact on defining the scope of a project bec ...eady offer numerous programs and services will be crucial to communicating information, facilitating communication, and coordinating activities. Even though desig
    19 KB (2,863 words) - 16:44, 28 March 2022
  • ... 5 minutes by email.<ref name="TJackoson"/> Consequently the phenomenon of information overload or; '''email overload''' emerges, rather than email being benefici ...ail to respond to critical mail, responded less accurately / wrong, ignore information, or even quit. Studies have shown that email systems contribute to the top
    23 KB (3,554 words) - 14:44, 22 March 2022
  • ... but it is an important influence on financial attractiveness. If the cash flow turns out to be as predicted, that the asset was valued rationally, the inv ...V to decide the acceptance of a project. This breakdown generates valuable information helping to determine the uncertainty of a project allowing risk to be explo
    33 KB (5,018 words) - 15:32, 20 March 2022
  • ...de assesses market risks through long term contracts that can provide cash flow and mitigate risk of the possible price variations. ...could strengthen the sustainability of project. This is by getting as much information from as many stakeholders as possible, and eventually ending up with the be
    22 KB (3,270 words) - 13:20, 19 March 2022
  • # The most efficient and effective method of conveying information to and within a development team is face-to-face conversation. ...ls are being met in the process; there are tangible deliverables that give information to the team and stakeholders about the progress of the project; and, during
    31 KB (4,756 words) - 05:11, 29 April 2022
  • ...rnal rate of return; however, when the IRR is unique, it provides relevant information about the [[Wikipedia: return on investment |return on investment]] and is ...ments (or initial costs). A key consideration regarding '''discounted cash flow methods''' is the Time Value of Money (TVM). In [[Wikipedia: finance | fina
    23 KB (3,585 words) - 11:41, 19 March 2022
  • ...rstand and identify one’s goals in life. A lot of people just follow the flow, get an education, get kids, work, get old. But thinking out of the box and Our way of reaction to situations and to information is a physical response. It can be an increase in heart rate, facial express
    12 KB (2,142 words) - 16:38, 6 March 2022
  • # "The most efficient and effective method of conveying information to and within a development team is face-to-face conversation." ...ing and tracking progress is normally deformalized and part of the team´s flow.
    25 KB (3,903 words) - 11:17, 20 March 2022
  • ...rstand and identify one’s goals in life. A lot of people just follow the flow, get an education, get kids, work, get old. But thinking out of the box and Our way of reaction to situations and information is a physical response. It can be an increase in heart rate, facial express
    12 KB (2,136 words) - 19:01, 27 March 2022
  • ...hnology–enabled capabilities: A resource‐interdependence perspective," INFORMATION SYSTEMS JOURNAL, vol. 29, no. 3, pp. 582-608, 2019]</ref> These resources v ...wless operation. <ref name=''K'> C. Tomkins, "Interdependencies, trust and information in relationships, alliances and networks," Accounting, Organizations and So
    31 KB (4,457 words) - 09:48, 20 March 2022
  • To frontload information for urgent use, the first part of the article describes what a manager can * Improving communication flow and ensuring clarity about career development prospects.
    25 KB (3,817 words) - 14:53, 20 March 2022
  • [[File:DMAIC_Key_concepts.png|750px|right|thumb|The DMAIC project flow and key concepts.]] ...ope the project, a SIPOC diagram can be used to aggregate already gathered information, aswell as cover angles not yet explored. SIPOC is an acronym for supplier,
    23 KB (3,628 words) - 12:15, 25 March 2022
  • '''Preparation Phase, Information Phase, Function Analysis Phase, Creative Phase, Evaluation Phase, Developme ==== Information Phase ====
    20 KB (3,026 words) - 18:28, 27 March 2022
  • The article provides useful guidelines and information helpful to better understand the implementation of Scrum methodology – on * Transparency - Tools for exchanging information and controlling progress such as Sprint Burndown Chart and Scrumboard are s
    20 KB (3,173 words) - 18:19, 20 March 2022
  • ... The milestone schedule is sometimes also referred to as a milestone plan. Information to be included is the project start date, project end date, other major mil ... the MTA uses the typical triangle shape whereas a MTC in general can be a flow chart as well. <ref name="Toolbox">R. J. Martinelli and D. Z. Milosevic, Pr
    30 KB (4,616 words) - 14:10, 19 March 2022
  • ...of managers, budget allocation, as well as initiating a smooth information flow. ...ies see the matrix structure as a benefit to their operational efficiency, information transparency, and increased collaboration between different functional depa
    21 KB (3,018 words) - 20:42, 17 March 2022
  • ...ks. Here the WBS dictionary is used for deliverable definition and further information. Once all activities are specified, the sequencing stage begins. In this st ... by WBS structure and WBS Dictionary is enough to have a fluid information flow. Secondly, WBS structure in itself cannot provide a thorough project schedu
    20 KB (3,123 words) - 13:01, 18 March 2022
  • ...ref> Later, it got the name because all the phases are done one by one and flow downwards like a waterfall. It is the finest and oldest known SDLC model. T In this phase, all the information, requirements, and analysis gathered in the two previous phases are convert
    21 KB (3,330 words) - 13:42, 27 March 2022
  • ...eview by the project team. A project charter develops containing following information: :During the gate review, the project manager should cover the project information including the design, project timeline, risk assessment, business plan and
    24 KB (3,509 words) - 18:56, 20 March 2022
  • manufacturing, pharmaceutical, Information technology uses this method for successful identification of Flowchart represent the process flow which was used through a simplified representation. [https://asq.org/qualit
    20 KB (3,019 words) - 16:36, 19 March 2022
  • Another information aspect that can be illustrated in Gantt charts are the dependencies across *If other restraints are incorporated into the chart, this information can be obfuscated (for example, the requirement of a crane to move material
    15 KB (2,377 words) - 19:37, 22 March 2022
  • 3. Flow: The process must be designed to flow smoothly, without interruption. ...ch involves creating a diagram that shows the entire flow of materials and information from the beginning of the process to the end. This can help identify areas
    33 KB (5,259 words) - 21:30, 20 February 2022
  • ... on the ability to collaborate, share, gather and interprete knowledge and information to carry out the objectives of any project - hence, they rely on the abilit ...formation, interpreting this information and effectively disseminating the information to persons who might need it. Communication is of vital importance to every
    25 KB (3,605 words) - 09:43, 8 March 2022
  • * ''Practical information:'' '''Practical information:''' It is important to include the points mentioned below.
    20 KB (3,279 words) - 21:48, 27 March 2022
  • * <span style="color: cadetblue">'''''Increase'''''</span> the speed of information exchange. ... the cards move forward. By doing this, bottlenecks can be avoided and the flow optimization is maximized.<ref name="ATL"> Atalassian Agile Coach. Last acc
    30 KB (4,774 words) - 21:55, 27 March 2022
  • ...is taking place. The team is expected to take into account every available information regarding the project.The stakeholders of the project are analysed, since t ...e its effects, however without necessarily controlling it. Teams achieve a flow state when trust is high and people have mastered their roles. In a state o
    14 KB (2,336 words) - 13:59, 20 March 2022
  • ...ject agility because of the necessity that everyone needs to have the same information before deciding. To ensure a project's success there are certain pitfalls t ...gn the management around multiple tasks and still ensure a high sharing of information among the technical departments and handle complex projects and programs.<r
    29 KB (4,488 words) - 19:55, 22 March 2022
  • ...of a pull system called “Drum-Buffer-Rope” which is an application for flow problems and an approach in the “Theory of Constraints” framework devel ...ifferent from other agile methodologies like Scrum, see [[Scrum]] for more information, because Scrum focuses on ways to handle the process of Project Management
    25 KB (3,990 words) - 13:10, 21 March 2022
  • ...opular agile managing method, and the internet provides a whole ocean with information on the topic. SCRUM has even become that popular that it is possible to tak ...UM is the events and is what that makes it agile since it creates a shared flow for the team. As previous mention the SCRUM framework in iterations. When t
    13 KB (2,198 words) - 19:49, 27 March 2022

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox