Search results

Jump to: navigation, search

Page title matches

  • ...Cycle Model in a Systems Engineering context. The article follows the Life Cycle Model phases chronologically, providing a theoretic backbone, which is illu The here introduced Life Cycle Model aims to adapt the holistic view derived from Systems Engineering. The
    18 KB (2,770 words) - 09:26, 17 May 2019
  • 442 B (78 words) - 12:05, 6 February 2018
  • 441 B (78 words) - 16:55, 4 February 2018
  • ... styles and approaches will be elaborated and discussed regarding the life cycle of a project. == The life cycle ==
    17 KB (2,641 words) - 12:43, 19 November 2018
  • ...igure 1:''' Typical cost and staffing levels across a generic project life cycle structure. Project Management Institute. '''“A Guide to the Project Manag ...ntermediate milestones, specific results or deliverables. The project life cycle also allows for the gate procedure to be used, this is a tried and tested m
    16 KB (2,525 words) - 15:34, 10 January 2019
  • 300 B (32 words) - 22:24, 13 February 2021
  • '''Life Cycle Assessment (LCA)''', is an approach used to analyze the environmental impac ...e to cradle.jpg|500x500px|thumb|Product life cycle <ref name="Product life cycle"> Sustainable Development and Other Solutions to Pollution and Global Chang
    25 KB (3,890 words) - 19:07, 5 May 2023

Page text matches

  • ...Cycle Model in a Systems Engineering context. The article follows the Life Cycle Model phases chronologically, providing a theoretic backbone, which is illu The here introduced Life Cycle Model aims to adapt the holistic view derived from Systems Engineering. The
    18 KB (2,770 words) - 09:26, 17 May 2019
  • ...d include representatives from all different stages in the facility's life-cycle; from the production team that will design and build the facility to the en ...uch techniques are e.g. involving stakeholders from the whole project life-cycle earlier in the project, last responsible moment thinking to prevent reworks
    25 KB (3,805 words) - 12:20, 20 December 2018
  • [[File:LifeCycle.jpg|thumb|500px|none|Requirements Engineering (RE) - life cycle model]] ...radigm needs to be identified is because they all use the requirement life cycle in different ways.
    23 KB (3,616 words) - 12:11, 20 December 2018
  • ...gies together with shorter [http://en.wikipedia.org/wiki/Product_lifecycle life cycles] make rivalry even harder today than ever. It is evident that a comp |Market attractiveness (growth, life cycle length etc.)
    16 KB (2,684 words) - 11:35, 20 December 2018
  • ...efining customer needs and required functionality early in the development cycle, documenting requirements, and then proceeding with design synthesis and sy ...d practices of the two domains for their general "authorized" view on life cycle and phase models.
    24 KB (3,577 words) - 12:27, 20 December 2018
  • Tuckman proposed that there are four stages which describe the team’s life-cycle. The group dynamics change from low efficient and troubled to highly produc ..., in the sense that Tuckman’s developmental sequence shows up during the life of the project.
    16 KB (2,617 words) - 12:25, 20 December 2018
  • Change is a fundamental part of life and business. It refers to any modification, alteration or transformation i ...unication, decision making and risk management throughout the program life cycle <ref>''https://www.projectsmart.com/articles/framework-for-programme-manage
    24 KB (3,559 words) - 09:39, 9 May 2023
  • ... management the SWOT analysis can be carried out in all phases of the life cycle in order to monitor and manage internal and external environments. In portf
    11 KB (1,631 words) - 11:28, 20 December 2018
  • Requirements management is performed during the entire project life-cycle, but it is also one of the major sub-processes of the pre-project planning, ... in different requirements and during different phases of the project life-cycle.
    19 KB (2,807 words) - 12:15, 20 December 2018
  • [[File:File.jpg|300px|thumb|left|Risk register within the project life cycle<ref name="Winch" />]] ... Winch’s risk process diagram on the left hand side, throughout the life cycle of how a risk is dealt with, the risk register is the tool that should be c
    19 KB (3,144 words) - 12:17, 20 December 2018
  • ...lp later to choose the right person that will be in charge during the life cycle of a project.
    26 KB (3,905 words) - 12:36, 20 December 2018
  • It is important not to think of failure as massive life changing failures every time. A failure is in this reference defined as mis *Perform four basic activities in every other cycle: Define win conditions of each important stakeholder, be aware of how to sa
    19 KB (3,084 words) - 12:31, 20 December 2018
  • ... C. (2013). Applying Lean Production A3 to Enhance Construction Work Flow. Life Science Journal, 10(2).'' </ref>. ... Common for the different types of A3 reports is that they follow the PDCA cycle<ref name=(Sobek II, 2011)>''Sobek II, D. K., & Smalley, A. (2011). Understa
    20 KB (3,185 words) - 12:28, 20 December 2018
  • ...e different methods and techniques among the main phases of a project life cycle. *PDCA cycle
    25 KB (3,557 words) - 12:31, 20 December 2018
  • ...duct, while improving operation process untill the end of the product life cycle. This means that at each closeout phase a change could be face. In the busi
    16 KB (2,434 words) - 11:10, 20 December 2018
  • ...t, which are patterns of growth and change that emerge across the group´s life span. A holistic perspective on groups prompted researchers to examine how Groups also tend to cycle repeatedly through some of these stages, as group members strive to maintai
    29 KB (4,370 words) - 11:25, 20 December 2018
  • ...lan, facilitate and evaluate meetings throughout the project's entire life cycle and especially during the execution phase, when project resources most ofte ...ticipants felt meetings weren't productive. 60% said they didn't have work-life balance, and the feeling of being unproductive contributed to this<ref name
    24 KB (3,629 words) - 17:18, 16 November 2018
  • ...f controls and mitigations should be evaluated throughout the project life cycle <ref name="RMGeorgUni" /><sup>(p142)</sup>.
    29 KB (4,328 words) - 15:34, 16 November 2018
  • ...ernatives life-cycle will be repeated with the same pattern over each life cycle when applying LCM. ...erted to AW value, the value is assigned to every year of the project life cycle, likewise for each additional year. To compare two projects with unequal li
    23 KB (3,634 words) - 14:07, 11 February 2019
  • ...olutions is beneficial. This implies the concept stage of the project life-cycle together with preliminary design and planning activities.<ref name=PMandDT> Moreover, Design Thinking is needed to compete in markets with short product-life-cycles. The fundamental competitive advantage is to develop a completely ne
    22 KB (3,476 words) - 16:56, 16 November 2018
  • ...ment is a learning process through time and through the whole project life cycle. <ref name= Winch> Winch, Graham M. | 2010 | "Managing Construction Project ...blem or the issue that can form into a ''risk event'' along a project life cycle. When the decision-maker knows the ''risk source'', they have to respond to
    16 KB (2,443 words) - 16:58, 16 November 2018
  • * [[Life Cycle Model]] * [[Situation Analysis in Problem-Solving Cycle]]
    3 KB (355 words) - 12:05, 30 August 2015
  • * Everyone involved in a project life cycle should be trained in PRINCE2
    23 KB (3,577 words) - 15:37, 18 December 2018
  • ...appened, lessons from this need to be recorded and acted upon all the life cycle of project, and used for future ones: seek opportunities during the work of ...o the control end of the work) and to direct and monitor it throughout its life so to assure its viable nature. PRINCE2 help the board doing so by adopting
    30 KB (4,935 words) - 15:40, 18 December 2018
  • ... if players are aware of what the others are doing or not to simulate real-life situation. The complexity of modelling real life situation through game theory is virtually unlimited. However the mathemati
    26 KB (4,278 words) - 15:19, 18 December 2018
  • The traditional project management life cycle is defined by five phases: Definition, Detailed Plan, Launch plan, Monitori
    17 KB (2,765 words) - 21:45, 21 September 2015
  • It is said that bad news known at the 20% point in a project’s life cycle gives an opportunity to take corrective actions. <ref name="Fleming" /> The
    18 KB (2,857 words) - 15:51, 18 December 2018
  • ...n, integration was more than essential in every different part of the life cycle of the program, from the planning and design until the operational handover
    30 KB (4,537 words) - 15:16, 18 December 2018
  • ...s can be created, exchanged and re-used throughout the entire project life-cycle.
    19 KB (3,120 words) - 13:19, 18 December 2018
  • ...rmore, it is necessary to control the risk source through the project life cycle, since the probability of risk events can be assessed when we receive and m
    14 KB (2,243 words) - 15:02, 18 December 2018
  • *'''testing and refinement''', in which reliability testing, life testing and performance is assessed as well as design changes are implement MDF method can be applied in product design across the entire life cycle of a product. Based on its simplicity, companies using the method can deliv
    38 KB (5,492 words) - 15:21, 18 December 2018
  • ...f one of these collapses, the others are going to be affected. If the life cycle of a project extends, it will alter both program and portfolio schedule. ...ntal to bear in mind that usually portfolios keep running during the whole life of the company. They usually don't have a deadline but in some cases there
    39 KB (6,222 words) - 15:41, 18 December 2018
  • Every project faces uncertainties all along its life cycle; dealing with risks is then a fundamental aspect for a successful project m
    936 B (140 words) - 17:25, 13 September 2015
  • ...of '''guidelines, templates and tool mentors''', for all the critical life-cycle activities within a project. This cluster of objects, form a knowledge base ...ional Software Corporation.</ref>. RUP delicately breaks the software life cycle down to four consecutive phases <ref name="Philippe Kruchten">A Rational De
    24 KB (3,572 words) - 15:33, 18 December 2018
  • ...e difference between a contracting and supply chain management is the life-cycle of the program/project/portfolio. Where the SCM may have a portfolio of con
    24 KB (3,737 words) - 13:06, 29 September 2015
  • ...anagerial flexibility to initiate and lead changes during the project life cycle. (Salvendy, 2001) <ref> Salvendy, G. 2001, Handbook of Industrial Engineeri
    19 KB (2,996 words) - 14:46, 10 February 2022
  • ...he previous reviews of other cases and decision points in the project life cycle.
    15 KB (2,228 words) - 15:10, 18 December 2018
  • ...ent of processes and assist to a better understanding of the products life cycle. Not every "Lean" tool is applicable in Project Management, but some of the ...VSM gives a current state view of the processes and gather information as; cycle times, inventory levels, down times, material flows and information flows.
    17 KB (2,674 words) - 15:49, 18 December 2018
  • ...of success. (Although scope can potentially change during the project life-cycle, a concept known as ‘scope creep’) Note that the common success measure ...o effectively manage the projects success. During no other time of project life span is the project more vulnerable than in planning phase.
    17 KB (2,786 words) - 15:50, 18 December 2018
  • ...ncertainties that may occur from the earliest stages of the project's life cycle. The lack of available information or knowledge are considered to be some o ...acing a project. The uncertainties can occur throughout the project's life cycle, but also in the pre-execution stages when they contribute to uncertainty i
    20 KB (3,030 words) - 15:26, 18 December 2018
  • Every project faces uncertainties all along its life cycle. - FMEA role in the project life cycle
    968 B (139 words) - 17:09, 19 September 2015
  • ...o all the mentioned subject and process groups throughout the project life cycle, as illustrated in figure 3 <ref name="Præsentation">Andersson, N., 2015, ...on projects, second edition</ref>, hence reducing the overall project life-cycle.
    30 KB (4,385 words) - 14:55, 18 December 2018
  • ...inal phase is to monitor the risk source throughout the whole project life cycle, so the information becomes available and when the probability and impact c
    21 KB (3,422 words) - 15:25, 18 December 2018
  • ...lan_do_check_act.PNG|thumb|upright=3|'''Figure 1''': Deming's Benchmarking Cycle]] ...s proposed by W.E Deming known as the “'''Deming Cycle'''”. The Deming cycle includes a minimum of four phases: [https://en.wikipedia.org/wiki/PDCA ''Pl
    28 KB (4,139 words) - 15:27, 18 December 2018
  • ...ecame a paperless organisation. Computers were introduced in the every day life of the company. All incoming mails were scanned and new systems to share th ...h with the hearing they have" <ref name="JOMIE">"Lars Kolind. ''The second Cycle. Winning the War Against Burecracy'', Wharton School Publishing.</ref>. Thi
    24 KB (3,873 words) - 15:20, 18 December 2018
  • ...nagement life cycle and its related processes, as well as the project life cycle. ...tegrate these two very strong methods at the beginning of the project life cycle itself while planning. Utilizing the Six Sigma techniques for problem defin
    8 KB (1,159 words) - 08:41, 22 September 2015
  • The traditional project management life cycle is defined by five phases: Definition, Detailed Plan, Launch plan, Monitori
    21 KB (3,455 words) - 15:18, 18 December 2018
  • ...ge to find a common risk tolerance for all participants for the whole life cycle of the project. The level of risk tolerance should be set already in the st ====A real life example====
    27 KB (4,284 words) - 15:26, 18 December 2018
  • Every project faces uncertainties all along its life cycle. == FMEA in project life cycle ==
    10 KB (1,435 words) - 13:30, 21 September 2015
  • Every project faces uncertainties all along its life cycle. === Product development projects life cycle ===
    30 KB (4,526 words) - 15:48, 18 December 2018
  • # Reduce cycle times. ...much of the process variability. To eliminate waste and reduce the process cycle time, they broke down every process within the construction phase. BSB also
    30 KB (4,402 words) - 15:50, 18 December 2018
  • ... would achieve the desired results within a established management pre-set cycle? How to ensure that the strategy to be adopted will reach and integrate the ...nagement life cycle and its related processes, as well as the project life cycle.
    20 KB (2,923 words) - 00:05, 29 September 2015
  • ...s used to finance the project can rapidly increase during the project life-cycle until the loan is paid off. This financing cost can be much greater than th ...entity has a limited life where as a normal corporate entity continues its life indefinitely over many different projects.
    27 KB (4,209 words) - 15:17, 18 December 2018
  • ...e difference between a contracting and supply chain management is the life-cycle of the program/project/portfolio. Where the SCM may have a portfolio of con
    25 KB (3,802 words) - 15:39, 18 December 2018
  • ... would achieve the desired results within a established management pre-set cycle? How to ensure that the strategy to be adopted will reach and integrate the ...nagement life cycle and its related processes, as well as the project life cycle.
    20 KB (2,929 words) - 15:28, 18 December 2018
  • Risk management in project should be throughout the project life cycle. In some cases the risk management is primarily done in the design phase of ...risk management process is a concept to follow throughout the project life cycle and to be able to maximize the efficiency and the effectiveness <ref name=S
    32 KB (5,360 words) - 12:41, 18 December 2018
  • Some of these standards has a common project cycle which they follow. These cycles represents a project from its beginning to ...nagement standards are a lot alike. But how does project managers, in real life practices, use project management processes and subject to address projects
    14 KB (2,057 words) - 12:31, 18 December 2018
  • [[File:PLife.png|350px|thumb|right|Figure 1: Project life cycle.<ref name=LifeCycle>Francis, D., Horine, G. & Tittel, E. (2008). ''The Rela ...s in level of effort and focus over the life of the projects. Project life cycle generally passes sequentially through four stages: '''defining''', '''plann
    36 KB (5,735 words) - 12:44, 18 December 2018
  • ...easure the performance of a project at different times throughout the life cycle of a project. EVM is useful to help project managers or people in general t ...ich can be used to measure the performance of the project through its life cycle
    34 KB (5,199 words) - 14:10, 18 December 2018
  • ...ties, project risks are identified and managed throughout the project life cycle. Risk management is a central concept and plays an important role in mainta ...ep is an iterative process that is managed throughout the project’s life cycle. This step aims to develop a comprehensive list of potential risks implied
    24 KB (3,454 words) - 14:52, 16 November 2018
  • ...gely used. According to these models, all the stages in a product’s life cycle are sequential. ...ycle time through the limitation of WIP and increased throughput; once the cycle time became more predictable, they improved the accuracy of release forecas
    28 KB (4,298 words) - 14:07, 18 December 2018
  • ...roject management, providing continuous checks throughout the project life cycle. ...performance indicators to check project health throughout the project life cycle;
    25 KB (3,970 words) - 14:01, 18 December 2018
  • === Product Life-Cycle Stages === ...ation of each segment, these can also be linked to a specific product life-cycle stage. Question marks correlate to products in the introduction phase, wher
    24 KB (3,919 words) - 12:32, 18 December 2018
  • ...ef name="anna" /> In the face of today's globalization of markets, shorter life-cycles and increasing competition as well as complexity of technologies, hi ...s'': The innovation projects' scope usually changes during the development cycle ("scope creep")
    38 KB (5,626 words) - 14:08, 18 December 2018
  • ...on, Performance and Control and Close. These phases make up a project life cycle; ''“a collection of generally sequential and sometimes overlapping projec ...t a problem since the online communication is a daily part of a BESTie’s life. When an issue appears though, neither is the original schedule adjusted, n
    29 KB (4,536 words) - 12:48, 18 December 2018
  • *Durability - How long is the product life span. ... activities using quality techniques and tools throughout the project life cycle. If the requirements for the product of the project are consistent with rea
    23 KB (3,388 words) - 14:09, 18 December 2018
  • [[File:ProjetLifeCycle.png|thumb|right|300px|Figure 1: Life cycle of T5 project (click to zoom)]] ...s/local-news/how-jaguar-found-new-life-9678099''] ''How Jaguar found a new life after near collapse'' </ref> Egan used his knowledge about Lean production
    16 KB (2,672 words) - 14:03, 18 December 2018
  • ...on about a facility forming a reliable basis for decisions during its life-cycle; defined as existing from earliest conception to demolition. <ref>FREQUENTL
    2 KB (317 words) - 06:05, 12 September 2016
  • ...ion of a sustainable development it is a entrepreneurial step, in the life cycle of a company, providing competitive advantages and new opportunities.<br> ...ion''' : more holistic approach, starts including LCA <ref name="lca">Life cycle assessment:Part 1: Framework, goal and scope definition, inventory analysis
    28 KB (4,202 words) - 12:47, 18 December 2018
  • ...project management is crucial and continuous in all the stages of the life-cycle of a project. For successful management, the procedures and tasks have to b ...s of an integrated project delivery on BIM-based approach, during the life cycle, contribute to a successful project execution.
    23 KB (3,411 words) - 13:09, 18 December 2018
  • ...vironment thus it needs to be constantly updated during the program's life cycle in order to continue to be accurate. ...s their power interest and attitude are subject to change through the life cycle of the change program. As a result stakeholder analysis should be constantl
    19 KB (2,789 words) - 18:54, 8 May 2023
  • ..., which will undoubtedly face projects during different stages of its life cycle regardless its complexity and time completion. ...ifferent type of consequences such as the impact on the environment, human life, the economy or reputation cannot be used together as separate categories w
    19 KB (2,943 words) - 12:36, 18 December 2018
  • ...gues Kahneman in his book ''Thinking Fast and Slow'', where he unpacks his life-long research on [[Wikipedia:Prospect_theory|prospect theory]] which, in a ... 2000, in Dharamsala, India, was one in a series sponsored by the Mind and Life Institute to foster an interchange between the Buddhist tradition and Weste
    37 KB (5,425 words) - 13:00, 18 December 2018
  • ...f resistance from the employees and manage them effectively. Rick Maurer's Cycle of Change model and Three Levels of Support will be touched upon to identif ...tand the reasons for people to resist change once it is known where in the cycle the leader is and where the employees are. Apart from that, it can helps to
    19 KB (3,043 words) - 12:33, 18 December 2018
  • ...trol impacted the projects’ budget, time schedule and total project life cycle. Having a multiple contract and not a detailed one, made it hard to respond
    22 KB (3,463 words) - 14:07, 18 December 2018
  • |Market attractiveness (growth, potential consumer appeal, life cycle) |Market attractiveness (growth, potential consumer appeal, life cycle)
    19 KB (3,038 words) - 18:41, 19 September 2016
  • ...on about a facility forming a reliable basis for decisions during its life-cycle; defined as existing from earliest conception to demolition. ...on about a facility forming a reliable basis for decisions during its life-cycle; defined as existing from earliest conception to demolition.<ref>FREQUENTLY
    20 KB (3,114 words) - 13:59, 18 December 2018
  • ...ject management which project managers use to drive projects through their life-cycles: <ref name="PMI_2"> Project Management Institute, Inc.. (2017). ''Gu ...cated back to the functional managers and implemented correctly before the cycle starts again (see Figure 4). For large and complex projects, which require
    34 KB (4,895 words) - 11:19, 26 April 2019
  • ...ng conflicts and lowering the quality of the projects along all their life cycle. ...tion methods, stakeholders diversity and overlapping processes in the life cycle of a project, as a result Project Managers have been facing an increase of
    35 KB (4,877 words) - 12:34, 18 December 2018
  • ...clusion of process- required deliverables, such as System Development Life Cycle (SDLC) deliverables. The process- centered WBS includes the following:
    16 KB (2,528 words) - 09:41, 13 May 2019
  • |Market attractiveness (growth, potential consumer appeal, life cycle) |Market attractiveness (growth, potential consumer appeal, life cycle)
    23 KB (3,608 words) - 13:07, 18 December 2018
  • ...rd. They came up with the theory of SL, which at first was named the "Life cycle theory of leadership" while working on their book called “Management of O
    16 KB (2,504 words) - 12:44, 25 February 2019
  • ...s important to '''classify''' these benefits in terms of '''time''' and '''life span'''. For this reason, the timing and the dependencies of each benefit s ...plan regards a period of time which is outside the one of the program life cycle, the program manager has the responsibility to create the above.
    28 KB (4,492 words) - 21:35, 4 March 2019
  • Those six life cycle phases are divided into two groups, as it is shown in the Figure 1.: ...y stage analysing their work culture and helping them to re-establish work-life balance.
    19 KB (3,021 words) - 14:26, 16 November 2018
  • According to this approach, the process order is named as project life cycle and can be listed as; initiation, planning & design, execution, monitoring ...antt Chart method due to the fact for both professional and unprofessional life. Therefore, it can be said that every task that intended to be completed by
    23 KB (3,735 words) - 12:33, 10 November 2018
  • |[[The style of leadership changes throughout the life cycle of a project]]
    4 KB (570 words) - 12:27, 8 December 2017
  • ...imensions. These three dimensions need to be properly balanced from a life-cycle perspective and thought through in every aspect of the construction process ===Think long-term - Life cycle perspective===
    24 KB (3,587 words) - 12:30, 19 November 2018
  • ...tion organizations, the process needs to be tackled very early in the life cycle, rather than being evolved naturally<ref name=Winch <i>Graham M. Winch (20 ...ects"</ref>. Even though the responsibilities will change through the life cycle due to the progress and change of working teams, the responsibility chart i
    19 KB (2,938 words) - 12:31, 19 November 2018
  • • The phase in the project life cycle – defines the level of the dynamic uncertainty. Increases with the time p ...lated to the size of the project, uncertainties, phase in the project life cycle. These procure processes are:
    12 KB (1,743 words) - 12:33, 19 November 2018
  • ... project progresses which makes it vulnerable to delays. The adaptive life cycle on the other hand makes a rough plan with the overall tasks in the beginnin ...ct life cycle is manged. These are sequential life cycle and adaptive life cycle.
    19 KB (3,131 words) - 12:41, 19 November 2018
  • ... styles and approaches will be elaborated and discussed regarding the life cycle of a project. == The life cycle ==
    17 KB (2,641 words) - 12:43, 19 November 2018
  • ...on"</ref> states that QC should be performed during the whole project life cycle and that it includes following aspects:
    20 KB (3,048 words) - 10:00, 20 June 2017
  • ...projects are "unique" and planned continuously throughout the project life cycle. Systems such as the Last Plannar system <ref name="Rolf Simonsen"> "Lean C
    26 KB (3,635 words) - 13:30, 19 November 2018
  • ...zation’s vision, goals, and expectations to the team throughout the life cycle without crossing the line into micromanagement.
    16 KB (2,561 words) - 17:00, 16 November 2018
  • ...iables; the level of mission uncertainty and the phase in the project life cycle. The lower the levels of mission and dynamic uncertainty, the more appropri ...en the supplier is selected and the other is the phase in the project life cycle, where often the level of dynamic uncertainty has been reduced from the sta
    17 KB (2,756 words) - 13:36, 19 November 2018
  • *Life Cycle Assessment (LCA) methodologies
    21 KB (2,950 words) - 13:40, 19 November 2018
  • ...ll stakeholders and integration of information throughout the project life cycle is fundamental to achieve a successful project. Building information modell ...egrated method of digitizing the construction process. Throughout the life cycle of the building, from idea to demolition, digital building models will be t
    17 KB (2,581 words) - 19:18, 20 November 2018
  • ...here are often high level of uncertainty, so this part of the project life cycle requires greater effectively risk managing. A good risk management approach
    18 KB (2,897 words) - 19:19, 20 November 2018
  • ...Modeling. It explains how BIM implementation possessively affects the life-cycle of an activity comparing to other traditional approaches, providing an insi
    25 KB (3,674 words) - 19:21, 20 November 2018
  • ...ut when costs will be incurred and how much they will amount to during the life of the project. ...for the project not only during its construction, but also during the life cycle of the project. In other terms, it is the inflow of cash to the contractor
    10 KB (1,571 words) - 20:02, 12 June 2017
  • ... the constant evolving and emerging conditions throughout the project life-cycle. Because of this inherent risky and uncertain nature of the construction in ...e carried out consistent with the project process as over the project life-cycle as further risks might emerge <ref name=" martin " /> .
    21 KB (3,036 words) - 19:26, 20 November 2018
  • ...ject can help providing structures that are sustainable throughout all its life time. Nationalities all around the world are concerned about global warming ...d but also during operation and after demolition in the end of its service life.
    21 KB (3,158 words) - 07:32, 22 June 2017
  • ...izations.pdf</ref>Hence, trust needs to be ensure during the projects life cycle. This can be achieved by use of teambuilding exercises throughout the span
    27 KB (4,200 words) - 19:27, 20 November 2018
  • ...The fourth element is the control of the risks throughout the project life cycle<ref name="winch" /> ... cognitive biases, may therefor add to the uncertainty of the project life cycle. Many different cases of biases have been studied and here we will mention
    19 KB (3,032 words) - 19:27, 20 November 2018
  • ...ement, afterwards some general knowledge about organising through the life cycle will be presented. Lastly, the strong owner concept will be presented, it i ...oject manager has the responsibility to coordinate during the project life cycle in order to fulfil the client's needs and goals. Across different industrie
    16 KB (2,321 words) - 19:27, 20 November 2018
  • ...ut when costs will be incurred and how much they will amount to during the life of the project. ...for the project not only during its construction, but also during the life cycle of the project. In other terms, it is the inflow of cash to the contractor
    10 KB (1,556 words) - 21:46, 12 June 2017
  • |[[Life Cycle]] |[[Life Cycle]]
    25 KB (2,790 words) - 09:49, 13 August 2017
  • ...ion</ref> states that QC should be performed during the whole project life cycle and that it includes following aspects:
    27 KB (4,004 words) - 12:46, 19 November 2018
  • ... should, therefore, be a daily, on-going process throughout the whole life-cycle of a project through continuous monitoring and controlling of the risks. ...anagement]] is a daily, on-going process all throughout a project’s life-cycle. It consists in identifying, assessing, analyzing and prioritizing risks in
    24 KB (3,670 words) - 19:20, 20 November 2018
  • ...ject can help providing structures that are sustainable throughout all its life-time. Nationalities all around the world are concerned about global warming ... but also during operation and after demolition, in the end of its service life.
    24 KB (3,661 words) - 19:29, 20 November 2018
  • ... beginning of a project. Since requirements vary during a project’s life cycle there can’t be only three measures. Therefore, scope, that encompasses th ...objectives and what trade-offs there can be made during a project’s life cycle. He questions whether it is reasonable to exclude them in some occasions du
    5 KB (846 words) - 20:25, 8 August 2017
  • ... a project. It is a continuous process that runs through the complete life-cycle of a project. It works as a core process for any change initiative, it is t
    2 KB (260 words) - 11:53, 3 August 2017
  • Graph based on Hersey, P. & Blanchard, K. H. (1969). "Life cycle theory of leadership". Training and Development Journal. 23 (5): 26–34.
    207 B (25 words) - 14:57, 27 November 2018
  • ...ly include the costs within the payback period, and ignores the total life-cycle costs of a product – e.g. if there are high disposal or decommissioning c
    4 KB (684 words) - 10:49, 16 November 2018
  • ==Dynamic Tensions in Project Management and Project Life Cycle== ...ct that the optimal state of balance may shift throughout the Project Life Cycle-because of the high variance of costs and uncertainties along the way-, whi
    18 KB (2,592 words) - 09:30, 17 May 2019
  • He positioned his theory as a method to reduce cycle time and improve new product "hit rate". Over the years academics and profe =====Application in Life-Cycle Management=====
    30 KB (4,297 words) - 09:27, 17 May 2019
  • ...e balanced scorecard, can be used in combination with the the project life cycle theory and a specially developed framework, to provide help to the project ...ation should also look at what do it what to excel at. It can the quality, cycle time or low price. Here it is also very important to look at it as the qual
    20 KB (3,246 words) - 18:23, 17 November 2018
  • ...the given project has a row for assigned tasks throughout the project life cycle. Via the team calendar, all team members’ project activities are visible ...oject stage with the possibility to scroll through the entire project life cycle. Figure 2 discloses the system flow and output of Teamweek. Additionally, t
    22 KB (3,261 words) - 18:44, 17 November 2018
  • ... The progression of stages follows the characteristics of the project life cycle as described in the PMBOK-Fifth Edition.<ref>Project Management Institute,
    31 KB (4,877 words) - 18:47, 17 November 2018
  • ...) was developed so the optimal timing of project control in a project life cycle can be found. In addition simulation model were conducted so the best possi ...tant occurrence that is possible to change every phase of the project life cycle. This changes may come for the need in a change deliverable that may affect
    19 KB (2,951 words) - 09:30, 17 May 2019
  • ... It is definetely worth taking intuition into account, because it reflects life learnings, but also needs attention since personal perceptions may interfer ...ual in regards with their personal matters (thereby affecting his personal life), it is known as personal decision.
    20 KB (3,027 words) - 19:40, 2 October 2017
  • ...ation of the treatments that was not fulfilling will be identified and the cycle of the four phases will be repeated, as shown in the figure 1, thus leading ... events will be considered risks for the project. This can change the life cycle of the project process<ref name="ISO" />. An opportunity can e.g. mitigate
    47 KB (7,552 words) - 18:54, 17 November 2018
  • ...ent lifecycle, key stakeholders as identified by the project manager, life cycle cost and function and performance specifications. Part of these pages are m
    15 KB (2,306 words) - 18:55, 17 November 2018
  • ...gement: the risk. Common project risks like the increase in a product life cycle cost, an unacceptable quality or the delay to launch to market may be a dir
    17 KB (2,455 words) - 18:57, 17 November 2018
  • ...ement plan. Risk tolerance should be analyzed continuously during the life cycle of the project. ...project stakeholders to agree on risk tolerance levels throughout the life cycle of the project.
    13 KB (2,048 words) - 09:59, 17 May 2019
  • ...projects. It uses concept of failure mode effect analysis (FMEA) into life cycle of agile projects and produces a metamodel. This article might be useful fo
    32 KB (4,716 words) - 13:15, 23 November 2018
  • ... It is definetely worth taking intuition into account, because it reflects life learnings, but also needs attention since personal perceptions may interfer ...ual in regards with their personal matters (thereby affecting his personal life), it is known as personal decision.
    27 KB (4,228 words) - 18:47, 17 November 2018
  • ...ssible and warranted. It is performed regularly throughout a projects life cycle as new risks may emerge at later stages as well as a risk response may resu ...ojects and defines project management related concepts as well as the life-cycle and processes of projects and project management. It defines nine knowledge
    30 KB (4,345 words) - 14:57, 16 November 2018
  • ...or a contractor over a specific period of time, usually over every payment cycle. ...other methods to minimize the maximum debt of the contractor every payment cycle. These methods are listed below as:
    29 KB (4,381 words) - 19:30, 20 November 2018
  • ...ethod that encompass all the activities being done during the project life cycle. It is based on repetitive approach that principles of agile development ma ...s main goal is to produce higher quality software, and superior quality of life for the development team. '''''XP''''' is the most particular of the agile
    21 KB (3,243 words) - 15:17, 16 November 2018
  • ...INCE2, milestones and "gates" or decision points based on the project life cycle, combined with a detailed project plan of the phases, should prepare the in
    24 KB (3,726 words) - 20:42, 19 March 2022
  • |[[Project Life Cycle in Industrial Engineering]]
    8 KB (1,000 words) - 09:28, 18 February 2019
  • ...f product development, but it is in fact applicable through the whole life cycle of a project or program; at any time that new ideas or solutions to problem
    21 KB (3,264 words) - 17:01, 16 November 2018
  • ...nces of this fact <ref name="Finite energy"> M. Pehnt (2005). Dynamic life cycle assessment (LCA) of renewable energy technologies. Institute for Energy and ...agement roles outside a formal PfMO role. In Chapter 7: Portfolio delivery cycle: practices risk is discussed.
    34 KB (5,202 words) - 15:22, 16 November 2018
  • ...ement processes''".<ref name="PMBOK"/> In the beginning of a projects life cycle, two Process Groups are prevalent, namely Initiating and Planning. Ideation ...n potentially be used in other phases of a project’s or program’s life cycle, but are most utilizable in the first stages of any project or program. For
    21 KB (3,311 words) - 09:53, 4 February 2019
  • ... statement may look like a simple and easy way to follow. However, in real life, the project scope statement can be quite complicated to write. Nobody can ...last. Each chapter is devoted to a specific process in the project process cycle and gives a good information regarding the management methods that can be u
    22 KB (3,424 words) - 15:37, 16 November 2018
  • ... responsibilities and expectations that can minimally vary during the life cycle of the project.
    20 KB (2,933 words) - 18:49, 17 November 2018
  • ...lving all perspectives in parallel, from the beginning of the product life cycle” '' - Bandecchi, M., B. Melton and B. Gardini (2000).<ref>[http://www.ref ... in the assembly line industry and are now used in the product development cycle across industries. The name implies the scope of this type of approach. Ins
    22 KB (3,313 words) - 08:59, 11 January 2019
  • ...roughout a whole project life cycle <ref group="glossary"> '''Project Life Cycle:''' A time slot within project phases are performed. In case of project man ...created for a sole purpose of performing a certain project within its life cycle. The team is disbanded once a project is completed. </ref>
    23 KB (3,526 words) - 17:41, 16 November 2018
  • ...o take actions to prevent or correct team problems during the project life cycle.<ref name="PMBOK">Project Management Institute. (2004). A guide to the proj ...ct manager is to give the team recognition and rewards throughout the life cycle of the project rather than waiting until the project has ended.<ref name="P
    30 KB (4,516 words) - 17:16, 16 November 2018
  • ...te methods, resources and controls are applied throughout the project life cycle. Every project has a sponsor.
    26 KB (3,691 words) - 17:19, 16 November 2018
  • ... of data required in a product life cycle, or in this case, a project life cycle. The system allows for the storage and retrieval of data, allowing differen
    15 KB (2,291 words) - 17:21, 16 November 2018
  • ...focus on practical information for Project Managers, and present some real life relevant techniques and tools. For cash flow, the focus will be set on '''G ==Implementation in real life projects==
    18 KB (2,744 words) - 17:21, 16 November 2018
  • ...igure 1:''' Typical cost and staffing levels across a generic project life cycle structure. Project Management Institute. '''“A Guide to the Project Manag ...ntermediate milestones, specific results or deliverables. The project life cycle also allows for the gate procedure to be used, this is a tried and tested m
    16 KB (2,525 words) - 15:34, 10 January 2019
  • Projects go through a series of phases, also known as a project's life cycle. These phases can differ from project to project but are typically broken d ...es like sprints become relevant and challenge the traditional project life cycle as the one defined by the PMBOK® Guide <ref name=" PMBOK " />. New demands
    25 KB (3,916 words) - 17:40, 16 November 2018
  • ...optimise the project continuously or at multiple points during the project life. Takt time (or 'Cycle demand time') is defined as the rate of demand for a particular project or
    9 KB (1,253 words) - 15:11, 19 February 2018
  • ... great tool for the project manager in the initial phase of a project life cycle where the project's stakeholders are mapped. Since the expectations of stak ...ager needs to think about budget and cash flow throughout the project life cycle.
    16 KB (2,532 words) - 17:29, 16 November 2018
  • ...uld include the objectives of all stakeholders throughout the project life cycle and at all levels in the project management process. Stakeholders have diff
    26 KB (3,892 words) - 17:04, 19 February 2018
  • ... out the work, and closing the project. This is known as a four-phase life cycle and the phases are usually referred to initiation, planning, execution, and
    29 KB (4,309 words) - 17:42, 16 November 2018
  • *Project life-cycle approach; ...ate methods and the project control is applied throughout the project life-cycle. An important responsibility of the board is the establishment of a coheren
    27 KB (3,813 words) - 15:34, 16 November 2018
  • ...anagement plan - Which is the project plan that describes the project life cycle and how each phase will be executed. It also describes the criteria of how ... the behaviour in a work place or how to operate the tools learned in real life. Indirect training has to be constantly updated. The updates could come fro
    20 KB (3,218 words) - 17:40, 16 November 2018
  • ...veral different roles are involved in the process of bringing a product to life e.g. product marketer, product manager as well as project manager. In fact, ...ycle:''' Due to the breakdown to sprints approach there is a fast feedback cycle of the customer as a review meeting after each sprint is taking place. This
    20 KB (3,150 words) - 17:06, 16 November 2018
  • According to the [[Life Cycle Model]], a project consists of the 4 established stages: project initiation Each phase in the project life cycle requires specific project management techniques.
    18 KB (2,731 words) - 17:44, 16 November 2018
  • ...am_management Program Management]</span> throughout the whole program life cycle. In addition, they should be able to manage the main program documents (e.g
    25 KB (3,818 words) - 17:45, 16 November 2018
  • ...ect phases. It reflects to the overall performance during the project life cycle as well as the individual task consumption.“Control of time is competitiv
    2 KB (256 words) - 13:28, 15 February 2018
  • *'''Overall or life-cycle cost:''' Total cost of ownership (purchase cost plus operating cost).
    21 KB (3,183 words) - 17:03, 16 November 2018
  • '''Status meeting''' – During the whole project life cycle, the project manager should have scheduled meetings to review and discuss i
    20 KB (3,103 words) - 17:45, 16 November 2018
  • ...Variations in critical success factors over the stages in the project life cycle, Journal of Management 14 (1988) - 5 </ref> the only factor that was margin ...Variations in critical success factors over the stages in the project life cycle, Journal of Management 14 (1988) - 5 =====
    18 KB (2,980 words) - 17:47, 16 November 2018
  • ...nd humans to the moon, requires a lot of management through the whole life-cycle of these project. Time has shown over and over again, that having a poorly
    15 KB (2,471 words) - 17:49, 16 November 2018
  • # '''Use it throughout the life cycle of the project.''' The project manager and the team can, throughout the pro
    20 KB (3,120 words) - 17:41, 16 November 2018
  • ...forming during a project life cycle <ref group="glossary"> '''Project Life Cycle:''' A period of time with defined start and end date, when project is execu ...roject phases. It reflects the overall performance during the project life cycle as well as the individual task consumption. “Control of time is competiti
    22 KB (3,339 words) - 22:06, 28 February 2018
  • ... responsibilities and expectations that can minimally vary during the life cycle of the project.
    24 KB (3,471 words) - 15:30, 16 November 2018
  • A project life cycle displays typically '''four characteristics''':<ref name="standard"/> ...ical cost and staffing curve, they may require resources early in its life cycle and therefore higher expenditures.
    18 KB (2,845 words) - 17:10, 16 November 2018
  • ...anning easy that can be followed without major changes throughout the life cycle of the project <ref name="PMBoK"> </ref>. ...ese projects also usually require formal documentation throughout the life cycle.
    25 KB (3,713 words) - 17:35, 16 November 2018
  • ...forming during a project life cycle <ref group="glossary"> '''Project Life Cycle:''' A period of time with defined start and end date, when project is execu ...roject phases. It reflects the overall performance during the project life cycle as well as the individual task consumption. “Control of time is competiti
    22 KB (3,389 words) - 15:07, 16 November 2018
  • ...projects. It uses concept of failure mode effect analysis (FMEA) into life cycle of agile projects and produces a metamodel. This article might be useful fo
    31 KB (4,700 words) - 00:13, 14 November 2018
  • ...ulations used to mitigate and better control risks during the project life-cycle. Figure 7 illustrates how BIM decreases the different types of construction ...s can be created, exchanged and re-used throughout the entire project life-cycle.
    27 KB (4,169 words) - 18:54, 4 March 2019
  • By smoothing out the resource requirement over the life cycle of the project, the PM ensures that the fluctuation of resources between pe ...o this project in order to smooth out the worker requirement over the life cycle of the project.
    16 KB (2,728 words) - 11:24, 4 March 2019
  • ...taff nowadays<ref name="Skills"></ref>. People negotiate everyday in their life even when they do not realize it and project management is no different, fo ...lls should be applied from the project manager throughout the project life cycle. Even from the very first stages of a project, the project manager may need
    20 KB (3,092 words) - 09:58, 4 March 2019
  • ...name="liz">Hofstede, G. (1984). "The cultural relativity of the quality of life concept", Academy of Management Review, Vol 9 No3, pages 389–398. </ref> ... of Needs” theory. He studied human motivation and successful people’s life such as Albert Einstein, Jane Addams, Eleanor Roosevelt, and Frederick Doug
    35 KB (5,328 words) - 22:51, 4 March 2019
  • ...erstanding of stakeholders’ needs throughout the (extended) project life-cycle<ref name=apm></ref>. ...phases: ''"implementation"'' and ''"evaluation"'', through the system life cycle.
    24 KB (3,691 words) - 21:51, 4 March 2019
  • ...nto, J. K., Slevin, D. P. Critical success factors across the project life cycle: definitions and measurement techniques. Project Management Journal, 1988;
    20 KB (3,041 words) - 15:35, 2 March 2019
  • ...ight|400px|Figure 1: Influence and Expenditures Curve for the Project Life Cycle. Inspired from "Beginning a project the right way"<ref name="beginning"/>.
    26 KB (3,756 words) - 21:03, 4 March 2019
  • ... a value. The develop of the benefit plan begins early in the project life cycle and the benefit plan may include one or more of following:
    18 KB (3,035 words) - 07:45, 30 April 2019
  • ...vidual project risks may emerge as the project progresses through its life cycle and the level of overall project risk will also change.<ref name="PMBOK"> '
    23 KB (3,556 words) - 18:56, 3 March 2019
  • ..., if you only focus on your assets you won’t get to profit in any way in life, and you will never be effective. We will go through different aspects of m ...y. We might discover that if you adapt some of Coveys principles into your life, you might be well suited to work with projects.
    29 KB (4,866 words) - 18:55, 4 March 2019
  • ...s to obtain trade-offs within a reasonable limit during the project's life cycle to obtain a successful project. The model implies that the project's succes ... project is impacted by those three constraints. During the project's life cycle it is the project managers job to balance between the time, cost and scope/
    25 KB (4,021 words) - 15:46, 4 March 2019
  • ...a project goes through different phases, referred to as a project’s Life Cycle and typically include: ...ject ultimately comes from completing all four steps in a project’s Life Cycle in a timely matter. The importance of successful project management allows
    23 KB (3,777 words) - 16:12, 4 March 2019
  • .... The job this milkshake is getting done for customers is them engaging in life whilst driving to work in the morning and not falling asleep.<ref name="Job ...to eliminate, reduce or minimise pains customers care about and make their life easier. In the last step of the value map, project managers need to conside
    27 KB (4,201 words) - 21:30, 3 March 2019
  • ...ormance in comparison to the plan at the control point in the project life cycle. Monitoring and controlling project management process group. As an aspect ...ject manager. Primarily, these categories include: Time based KPIs such as Cycle time, On-Time completion percentage, Number of adjustments to the schedule
    24 KB (3,667 words) - 22:40, 4 March 2019
  • ...anager should therefore, motivate the team members during the project life-cycle rather than at the end. Intangible rewards rather than monetary rewards can
    25 KB (3,798 words) - 18:20, 4 March 2019
  • ...ant to establish, define, and plan governance in the beginning of the life cycle. The four steps of the implementation are: assess, plan, implement, and imp ...te methods, resources and controls are applied throughout the project life cycle. Every project has a sponsor.
    24 KB (3,483 words) - 18:05, 4 March 2019
  • ...d to some loss in terms of money, manpower, time or sometimes even loss of life. *Service life
    14 KB (2,237 words) - 22:25, 6 May 2019
  • ...olio or programme manager to the communication maintenance during the life cycle of a project are mandatory for a successful project. <ref name="Pmbokguide"
    23 KB (3,394 words) - 11:52, 5 March 2019
  • * '''Program Life Cycle Management''' - Performance domain that manages program activities required
    14 KB (1,857 words) - 22:34, 4 March 2019
  • ...from various disciplines, the task to build the development plans and Life Cycle Plans is usually assigned to multi-functional asset planning team consistin * Ensures the transparency of the Life Cycle Plan across the organization;
    24 KB (3,660 words) - 16:32, 3 March 2019
  • ...ay increase its capacity to manufacture its product resulting in a shorter cycle time for carrying out orders. ... activity in the context of BRM is monitoring Benefits across the BRM life cycle. Measuring benefits throughout all stages from development over delivery to
    34 KB (5,032 words) - 19:53, 4 March 2019
  • ...fying, analyzing and then responding to any risk that arises over the life cycle of a project to help the project remain on track and meet its goal. Risk ma ...t overruns can result when projects are executed at a peak in the business cycle.
    21 KB (3,090 words) - 21:12, 4 March 2019
  • SAFe follows a different approach for choosing design and life cycle practices from most practices. It keeps multiple design options and require ...t, inspecting the results and adapting for the next PI is carried out in a cycle.
    25 KB (4,038 words) - 11:58, 11 February 2021
  • [[ File:Diagram.jpg|thumb|380px|The sponsorship relationship in project life cycle<ref name="relationship"></ref>. ]] ...tia, M. Planellas;Sponsorship relationships as strategic alliances: A life cycle model approach; Volume 50, Issue 2, March–April 2007, Pages 157-166
    21 KB (3,053 words) - 20:29, 4 March 2019
  • ...quirements in an intelligent way that deem them useful throughout the life cycle of the project. <ref>PMBOK''. 5.1.3.2 Requirements Management Plan, Page 13 ...nceptual design phase and continuing throughout development and later life cycle phases"''. <ref>International Council on Systems Engineering (INCOSE), Syst
    21 KB (3,140 words) - 23:01, 4 March 2019
  • ...fficient and schedule compliant manner throughout a system’s entire life cycle. To manage this, seven steps are usually followed: state the problem, inves * Consider the total system life cycle
    18 KB (2,733 words) - 22:47, 4 March 2019
  • ... managers to enhance their decisions and practices during the project life cycle, based on their learning from previous achieved results during the project. ...e future, the future is unknown. In APF planning is done in each completed cycle, this is to maximise the business value by adjusting the project scope of t
    21 KB (3,327 words) - 19:23, 28 February 2021
  • ...t project and also it is a sheet of a lesson learned during the whole life cycle of project.<br> ... important alive document that is reviewed and revised throughout the life cycle of the project and in the end, it becomes the historical document for the p
    13 KB (2,135 words) - 15:32, 3 March 2019
  • ... the level of economic and social development and ensure a high quality of life. ... risks can change or new risks are discovered, all over the project's life cycle. The identification process can consist of a variety of different stakehold
    23 KB (3,418 words) - 22:52, 4 March 2019
  • ...ows the manager to improve decisions and practices during the project life cycle based on experiences from previous results obtained during the project. The ...ect manager can adapt new more favorable decisions during the project life cycle to reach the project goal. A change in strategy is accepted as more knowled
    8 KB (1,141 words) - 11:43, 5 March 2019
  • ...rocess based on the principles of integrated product "development for life cycle", which means preparation of its marketing, delivery process and servicing. ...make decisions which have consequences in the rest of the product’s life cycle. They therefore attempt to create a product which is appropriate in configu
    17 KB (2,486 words) - 08:35, 26 February 2019
  • ...ers a more broad view that could be met in various situations and everyday life. Compared to the other two theories, Kellerman really focuses on the level ...resources either need to be relocated or are not needed for the whole life cycle of the project. This makes the maintenance of functional group dynamics mor
    38 KB (5,661 words) - 20:09, 4 March 2019
  • ...y in the capability of capturing all the necessary information in the life cycle of the project. Ergo, they should not be considered as panacea and their co ... provides useful guidance for the actual implementation of the WBS in real-life projects. Additionally, it presents all the aspects that lead to the effect
    18 KB (2,855 words) - 14:21, 19 May 2019
  • ...er, The relative importance of theses measures changes throughout the life cycle of a project. Early at the beginning of the project internal factors are of ...f projects to ensure that the right project is done right in a sustainable cycle delivering the maximum value-revenue for each value of the invested capital
    11 KB (1,752 words) - 07:42, 14 May 2019
  • ...rocess based on the principles of integrated product "development for life cycle", which means preparation of its marketing, delivery process and servicing. ...make decisions which have consequences in the rest of the product’s life cycle. They therefore attempt to create a product which is appropriate in configu
    26 KB (3,810 words) - 11:32, 3 March 2019
  • ...ay increase its capacity to manufacture its product resulting in a shorter cycle time for carrying out orders. ... activity in the context of BRM is monitoring Benefits across the BRM life cycle. Measuring benefits throughout all stages from development over delivery to
    34 KB (5,032 words) - 19:55, 4 March 2019
  • ...from various disciplines, the task to build the development plans and Life Cycle Plans is usually assigned to multi-functional asset planning team consistin * Ensures the transparency of the Life Cycle Plan across the organization;
    25 KB (3,831 words) - 20:24, 3 March 2019
  • Throughout a program life-cycle change should be implemented accordingly <ref name="lecture" />. Here, the
    28 KB (4,285 words) - 21:21, 20 March 2019
  • ...bes it, important matters are those that contribute to long-term goals and life values. These items require planning and thoughtful action. When focusing o ...factors into account will involve less crisis creating a self-perpetuating cycle that will free up more time to do forward-looking work. Our natural tendenc
    25 KB (3,879 words) - 18:28, 7 May 2022
  • ...inear and thus limiting in a context of project that runs an adaptive life cycle. In such cases other frameworks to structure and plan the projects should b
    14 KB (2,317 words) - 19:26, 22 March 2022
  • ...r to map the benefits. Information about the beneficiary, the time and the life span of the outcomes are analyzed in order to be identified that the consid ...and the intended changes that are expected to occur throughout the project cycle.
    28 KB (4,232 words) - 08:06, 11 May 2020
  • ...ormation about the project's objectives” throughout out the project life cycle and should be reviewed periodically by the project managers. ...phase model is to identify the costs throughout the whole project’s life cycle. In most projects the costs will be low in the beginning (Initiation) and w
    41 KB (6,512 words) - 12:41, 6 March 2020
  • ... management the SWOT analysis can be carried out in all phases of the life cycle in order to monitor and manage internal and external environments. In portf ...indings from the PDCA cycle. It is like a circle that has no end, the PDCA cycle should be repeated again and again for continuous improvement.
    15 KB (2,286 words) - 10:08, 9 March 2020
  • Use it to remember who you design for and get inspired by their specific life and challenges. '''LCA''' <ref>(2009) Chapter 2 Life Cycle Management: Implementing Sustainability in Business Practice, Guido Sonnema
    23 KB (3,317 words) - 19:55, 7 March 2020
  • ...agement team has to prioritize the risks several times throughout the life cycle of the problem and adapt to changes. The project manager, after identifyin ...ts of the company. The project manager mentioned that throughout the life cycle of this case they confronted several changes. Scope, timelines, and names
    20 KB (3,180 words) - 09:58, 12 May 2020
  • ...ying efforts and gains. The visual presentation displays the complete life-cycle. Therefore the decision maker can use the tool to evaluate why a potential
    21 KB (3,308 words) - 07:42, 10 March 2020
  • ...situational leadership’ <ref>Hersey, P. & Blanchard, K. H. (1969). "Life cycle theory of leadership". Training and Development Journal. 23 (5): 26–34</r ... behavior. Graph based on <ref>Hersey, P. & Blanchard, K. H. (1969). "Life cycle theory of leadership". Training and Development Journal. 23 (5): 26–34</r
    20 KB (2,954 words) - 10:46, 8 March 2020
  • ==Life Cycle Model== ...e can be established depending on the scale of the demand and the activity cycle. Variations of these stages can exist related to the root and nature of the
    14 KB (2,195 words) - 20:28, 8 March 2020
  • ...ned by the various reports of PMI, is closely related to the Benefits Life Cycle and most of the steps in the two processes present a lot of similarities. ...</ref> and incorporates the activities of managing benefits throughout the life of the project.<ref name="PMI Pulse Beyond the project">PMI’s Pulse of th
    33 KB (4,802 words) - 16:17, 9 March 2020
  • |''5. Riding the life cycle:''<br> a. Stage gate model<br> b. Waterfall model<br> c. Agile (Adaptive) m
    6 KB (954 words) - 22:00, 31 January 2021
  • |''5. Riding the life cycle:''<br> a. Stage gate model<br> '''b. Waterfall model'''<br> '''c. Agile (Ad
    13 KB (1,824 words) - 14:09, 10 February 2023
  • ...rol, and more. Cost is a key factor throughout the project management life cycle and is often set by the client of a project. Therefore, the allocated budge ... specified output. Projects often incur cost overruns and slippage in real life and the idea behind the iron triangle is critical for project managers to m
    27 KB (4,158 words) - 19:24, 28 February 2021
  • ...lication. Every team goes through a development process thoughout its life cycle. However, guiding this development is important to ensure better cooperatio ...ity throughout the phases and therefore does not suitable to describe real-life group development processes. In particular, they came up with two questions
    28 KB (4,164 words) - 17:13, 27 February 2021
  • ...locating knowledge gaps, commonly spotted at the start of the project life cycle. The challenge of the 'Fuzzy Front End' is to show a myriad of ways to ove
    34 KB (5,119 words) - 16:18, 24 February 2021
  • ...ng risks is the second out of seven stages within the risk management life cycle. Hence, identifying risks is one of the early stages of risk management and ...ght vary due to complexity and size. As a part of the risk management life cycle, it is an important stage within the planning phase of risk management but
    20 KB (3,002 words) - 21:29, 28 February 2021
  • ...market, technical, resource, and organizational uncertainty. Over the life cycle of a project, the project team systematically tests assumptions to their un ...age of a project and gets continuously revised throughout the project life cycle whenever there is a lack of decision-relevant knowledge. As all projects en
    29 KB (4,472 words) - 20:34, 28 February 2021
  • ...sed. Also, it is indicated in what specific moment of the project’s life cycle the WBS should be created. Moreover, some of the most usual mistakes commit ...f a project thanks to the several benefits it provides throughout its life cycle. Some of the main benefits are the following:
    19 KB (3,005 words) - 18:11, 28 February 2021
  • ...t must also remain valid and be revalidated during the entire project life cycle. <ref name="PRINCE2"/>(p.21.) ...the '''costs''' of the investments that will be needed throughout its life cycle, as well as any '''risks''' that it might set ahead. The benefits can be ta
    39 KB (5,964 words) - 18:22, 28 February 2021
  • ...framework in some cases, e.g., when running a project in a predictive life cycle to obtain a structured project plan with a critical focus on the problem- a ...dressed how the Double Diamond is applied in a predictive or adaptive life cycle. There are various other angles that the Double Diamond can be viewed from,
    27 KB (4,004 words) - 18:09, 28 February 2021
  • ...erent organizations have fluctuating needs at various phases of their life cycle. For some, the simple act of making goals open and transparent is a big lea ...ore fit for modern-day project management. This article includes many real-life examples of aspects of the FAST goals in practice in high-performing compan
    29 KB (4,699 words) - 22:55, 28 February 2021
  • ...xamples of WBS structure; the first being using phases of the project life cycle as the second level of decomposition, with the product and project
    20 KB (3,311 words) - 12:12, 24 February 2021
  • *'''A Project''' has a life cycle and contain various elements such as activities, objectives, focus, benefit ... be by learning a new IT system or a radical change in their everyday work life. Also, people tent to disagree changes because it affects them. <ref name="
    28 KB (4,527 words) - 14:44, 28 February 2021
  • ...f construction projects. The reason is that during the entire project life cycle, people pay attention to the cost control work of the construction enterpri ...t including management reserve. This budget is allocated by phase over the life of the project, but at a given point in time, planned value defines the phy
    24 KB (3,702 words) - 11:20, 26 February 2021
  • ...value management (EVM) is a method used throughout the entire project life cycle to measure the performance of projects, programs, and portfolios. The use o As sustainability is becoming more and more important in our daily life as well as in project this article aims to investigate whether EVM can be a
    25 KB (4,044 words) - 19:53, 28 February 2021
  • ... and fast project deliveries. Scrum relates to the project and development life cycles in the PMI standard. Even though Scrum is applicable for both projec ...ts. Benefits of utilizing the Scrum Framework to structure the development life cycles are continuous improvements, transparency, early adoption, and embra
    48 KB (7,793 words) - 17:58, 28 February 2021
  • [[File:plc.png|frameless|500px|Project Life Cycle]]
    5 KB (694 words) - 13:57, 17 February 2021
  • ...ity gates require implementation and control during the whole project life cycle. Every gate and several milestones should continuously assess and track the
    35 KB (5,340 words) - 20:56, 21 July 2021
  • ...the projects. The lack of this results in variation orders during the life cycle of the project.
    20 KB (3,081 words) - 20:24, 25 February 2021
  • ...rints, which are completed in short iterations throughout the project life cycle. <ref name=one> Workfront, ''Agile Project Management'', accessed 10 Februa ...complexity''. ''Purpose'' because the combination is about riding the life cycle of a project, both in the big picture from ideation to closure but also wit
    27 KB (4,323 words) - 20:02, 28 February 2021
  • ...tool that project managers find useful to identify important events in the life of the project<ref name="Book"/>. So, project milestones help project manag ...f reporting it is useful to have at least one milestone for each reporting cycle<ref name="Balance"/>.
    20 KB (3,319 words) - 22:37, 28 February 2021
  • ... is also affected by other factors such as educational level, maturity and life experience. The DISC-analysis doesn't take this into account. <ref name="Ev ... and approach for communication from the beginning and throughout the life cycle of the project. Furthermore, the project manager can structure and create b
    25 KB (3,882 words) - 16:35, 28 February 2021
  • ... skills to guide a project team through various project stages and project life cycles, nevertheless team motivation is an essential element of a successfu ...o motivate the project team through the various stages of the project life cycle <ref name="Motivation in Project Management: The Project Manager’s Perspe
    70 KB (9,758 words) - 22:09, 28 February 2021
  • ...mpared to the project plan and previous period, all along the project life cycle.<ref name="cdcp" /> This provides an understanding of whether or not, the p
    28 KB (4,209 words) - 16:14, 27 February 2021
  • ... zoom in on how the Scrum framework relates to the project and development life cycles presented in the [[Project Management Body of Knowledge | PMI standa ...ere time, cost and the project scope are well defined early on in the life cycle. Where changes have to be managed well (''Pages 18-19'')<ref name="PMBOK"/>
    31 KB (4,922 words) - 22:29, 28 February 2021
  • ...art cyclical concept(1).jpg|right|thumb|200px|'''Figure 1''': Shewhart’s cycle <ref name="Circle"/> ]] ...oducts. The method was transformed to a circular model called Shewhart’s cycle the same year <ref name="Shewhart"/>.
    29 KB (4,462 words) - 14:46, 30 March 2022
  • ...of work which is lost since there will be a lot of changes during the life cycle. The methods used in extreme project management are not new discoveries, bu ...t will change the specifications of the project many times during the life-cycle of the project, therefore if the future is going to change why plan for it.
    16 KB (2,568 words) - 22:26, 28 February 2021
  • ...olios can be interdisciplinary at times and their individual status in the cycle may vary, for instance different projects might be in different stages such ...Lastly the article also relates how these methods affect your professional life.
    1 KB (210 words) - 11:16, 12 February 2021
  • ...olios can be interdisciplinary at times and their individual status in the cycle would differ. During such times it becomes difficult for these professional ...aged parallelly irrespective of their current status in their project life cycle. It has become more common in organizations and for project managers to han
    23 KB (3,575 words) - 11:35, 28 February 2021
  • ...sidered complex and why, starting from the early stage of the project life cycle. Introducing an analysis of project complexity in the initiation phase of a ...tive approach to projects. Agile project management perfectly fit the life cycle of product development (e.g. software development) since the outcome of one
    21 KB (3,157 words) - 16:50, 28 February 2021
  • ...nd more risks while others have less and fewer. ''The Risk Management Life Cycle Framework'' is a tool that can be used by all project managers to help them ==== The Risk Management Life Cycle Framework contains of following steps: ====
    16 KB (2,503 words) - 13:56, 28 February 2021
  • ... three steps mentioned above. Risk should be monitored throughout the life cycle of a project. It is a continuous process that includes the actions that hav
    26 KB (4,250 words) - 21:51, 28 February 2021
  • ...rge changes can occur in the external environment and can lead the team to cycle back to an earlier stage. While working as a high-performing team it is not ...egular reflection on the theory and context of contemporary organizational life.
    25 KB (4,135 words) - 08:13, 25 February 2021
  • ... is a substantial practice that needs to be focused on throughout the life cycle of the project. A successful collaboration between an organization and its ...cation and management of stakeholders actively throughout the project life cycle manage these core relationships (PMBOK). Besides, it is important to provid
    20 KB (2,952 words) - 07:41, 22 February 2021
  • ...risks at the beginning of the project, but throughout the project’s life cycle. Some risk will inevitably be overseen when first preforming the risk ident ...eason not to carrier out a risk identification throughout the project life cycle. The checklist may not identify all risks, and other risks must also be exp
    12 KB (1,862 words) - 22:01, 28 February 2021

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox