Search results

Jump to: navigation, search

Page title matches

  • ...ement- Principles and guidelines and M_O_R principles, which is a standard risk management framework, which can be used by any organization on any projects ... article might be similar to other articles; Risk analysis, risk register, Risk management strategy in project portfolios
    22 KB (3,501 words) - 11:07, 20 December 2018
  • ...rticle is an overview and summary of relevant body of knowledge concerning risk management in project portfolios. [[Project portfolio management]] is the s ...rtfolios Is More Than Managing Project Risks: A Contingency Perspective on Risk Management". Project Management Journal, 67-80 (2014)</ref>
    23 KB (3,310 words) - 12:41, 20 December 2018
  • [[File:ISO 31000-2009 risk management strategy.JPG|thumb|300px|Risk management strategy as defined be ISO 31000:2009<ref>[ISO 31000:2009]</ref> ...out to be harmful to the project it is in general terms considered to be a risk.
    20 KB (3,201 words) - 11:27, 20 December 2018
  • ...ject, risks are identified and managed throughout the project lifecycle. A risk is an uncertain event that can have e negative effect on one or more object This Wiki-article will describe the risk management Process, Risk matrix, Rumsfeld's Unknown-Knowns, inherent- and residual risks.
    29 KB (4,328 words) - 15:34, 16 November 2018
  • ...for the project, and it is the management of all these that constitute the Risk Management in Construction Projects. ...dy from the time a project starts. Therefore it is important to prioritize risk management, since it will likely lead to more problems if handling the risk
    16 KB (2,443 words) - 16:58, 16 November 2018
  • ...x performance aspect that need to be managed: costs, time, quality, scope, risk and benefits. Prince2 is an integrated framework of processes and themes t ...s objective. If the Business Case is not rigorously built, organizations risk proceeding with projects that have few real benefits and poor alignment wit
    8 KB (1,269 words) - 13:46, 20 September 2015
  • ...e existing or potential risks. To enhance the effectiveness of the project risk management methodology and its processes a root cause analysis and its corr ... as the international risk regulation <ref name="Dr David Hillson">Project Risk Management,Future Developments by Dr David Hillson(2011)</ref> had already
    20 KB (3,030 words) - 15:26, 18 December 2018
  • ...tp://apppm.man.dtu.dk/index.php/Risk_analysis], Risk Response Planning and Risk Control processes. The purpose of the article is to describe the Risk Management toolset and techniques, present and analyse their recent perform
    13 KB (1,980 words) - 15:41, 18 December 2018
  • '''SUBJECT CHANGED TO "RISK IDENTIFICATION", please see/review that article instead''' ...mparison of the related subject uncertainty. Defining and debating risk as Risk = probability * consquence
    783 B (114 words) - 11:13, 22 September 2015
  • ...t/the-role-of-standardization-in-improving-the-effectiveness-of-integrated-risk-management</ref>]] ... our lives. We need to take risks to grow and develop. Effectively managed risk in hospitals, airport security, construction sites, projects, programmes, p
    21 KB (3,034 words) - 15:12, 18 December 2018
  • The risk management's objective is to assure uncertainty does not affect the project The concept of loop of control in risk management is a comprehensive model consisting of applicable methods, imply
    10 KB (1,435 words) - 13:30, 21 September 2015
  • ...a solution to that issue. As such it will define a risk and point out that risk management methods are really necessary within the management of a construc ... treat risks within a project, and then list a few usefull tools, like the risk matrix or the Gantt chart. Those tools will not be explained (on how to use
    37 KB (6,103 words) - 14:02, 18 December 2018
  • ... a strong and systematic approach to the whole risk analysis process. With risk process and strong project management practice the problems in a project ca ...eeds to be followed. RMP is a very robust approach that can be followed by risk managers and management teams.
    32 KB (5,360 words) - 12:41, 18 December 2018
  • ...as a result of unexpected turns and have a positive impact on the project. Risk management is highly relevant and therefore present in all projects. ... stay on track. This article focuses on Rumsfeld’s unknown unknowns, the risk management process and response strategies to threats and opportunities.
    24 KB (3,454 words) - 14:52, 16 November 2018
  • 84 B (13 words) - 16:36, 13 September 2016
  • 71 B (8 words) - 20:36, 16 September 2016
  • ... the project life cycle requires greater effectively risk managing. A good risk management approach requires a systematic methodology, knowledge and experi ...oints that must be investigated to achieve a full risk profile. At the end risk profiles and its limitations will be discussed.
    18 KB (2,897 words) - 19:19, 20 November 2018
  • [[File:bli.PNG|400px|thumb|right|Use of risk management in construction projects<ref name="Martin" />]] ...nces, thus introducing risk management. With early realization of possible risk sources it is possible to mitigate high costs that other wise can threaten
    19 KB (3,032 words) - 19:27, 20 November 2018
  • 29 B (4 words) - 06:13, 15 September 2017
  • ...at the risks and at last review the treatment of the risks which result in risk control. The fourth step of the process, review, is done for analysing the Risk as definition is probability P times the impact I giving the formula:<ref n
    47 KB (7,552 words) - 18:54, 17 November 2018
  • ...management. The process of risk quantification is an important step of the risk management process and therefore, important to ensuring the success of a pr ...ne about them" [http://pmtips.net/blog-new/defining-risk-management-part-4-risk-quantification]. </div><br />
    32 KB (4,716 words) - 13:15, 23 November 2018
  • ...rnment or biomass energy, which discuss shortage and supply chain problem. Risk is a key part of all these technologies and how to manage it is a challenge ...ave in common energetic technologies and their specific characteristics in risk management.
    34 KB (5,202 words) - 15:22, 16 November 2018
  • ...ks affecting a portfolio, one must work through four aspects of "Portfolio Risk Management". These aspects are identification, analysis, development respon ... Another type of iterative process occurs when the conditions of a certain risk change, forcing it to undergo all the phases again. When new risks occur al
    27 KB (4,134 words) - 15:20, 16 November 2018
  • ...nowledge and systematic tools, not only in project management, but also in risk management, a discipline that has a special complexity in construction proj ... scope, schedule, cost and risk. With the first three constraints defined, risk is the last but not least constraint remaining, and it is certainly the one
    23 KB (3,556 words) - 18:56, 3 March 2019
  • #REDIRECT [[A Guide to Risk Management in Construction Projects]]
    65 B (9 words) - 20:00, 13 February 2019
  • ...prerequisites, in terms of security systems, in order to avoid any kind of risk. ...> "https://www.theirm.org/the-risk-profession/risk-management.aspx"/"About Risk Management" </ref>
    23 KB (3,418 words) - 22:52, 4 March 2019
  • '''Title: Impact and Probability in Risk Assessment''' ...ty of occurring. After having introduced the components, it introduces the risk assessment methods using these two elements, taking into account both the q
    5 KB (615 words) - 11:11, 13 March 2020
  • '''Title: Risk and Issue Management - Managing Successful Programmes''' ... of control change and configuration management. Finally, it describes how risk and issue management evolve during the different stages of a program.
    5 KB (615 words) - 10:19, 26 March 2020
  • =='''Title: Portfolio Risk Management - The Standard for Portfolio Management '''== ...the chapter provides a portfolio risk management framework and a portfolio risk management plan.
    4 KB (503 words) - 09:14, 9 April 2020
  • 8 B (1 word) - 09:29, 6 February 2021
  • ...reats and opportunities and their impact as an individual or overall risk. Risk identification for projects, programmes or portfolios must be treated as an ...early stages of risk management and a necessity in order to pursue further risk management actions and prevent a negative impact on the projects’ success
    20 KB (3,002 words) - 21:29, 28 February 2021
  • <ref>'' Project Management Institute, Inc. (PMI). (2019). Standard for Risk Management in Portfolios, Programs, and Projects. Retrieved from ...app.knovel.com/hotlink/toc/id:kpSRMPPP01/standard-risk-management/standard-risk-management'' </ref>
    300 B (32 words) - 22:24, 13 February 2021
  • ...e will always be a number of activities. All these activities will involve risk to some degree – either as a threat or an opportunity. If risks are not m ...fits<ref name=cyber> Refsdal, A., Solhaug, B., & Stølen, K. (2015). Cyber-Risk Management (SpringerBriefs in Computer Science) (1st ed. 2015 ed.). Springe
    23 KB (3,724 words) - 20:30, 27 March 2022
  • ...usiness in its integrity and no longer in its individual parts. Enterprise Risk Management is a new method posed as a solution in this analysis and will be [[File:Risk categorization.png|500px|thumb|right|'''Figure 1:''' Risk Management fields]]
    23 KB (3,507 words) - 13:26, 21 March 2022
  • The main purpose of this article focused on risk analysis, identification and management techniques that are vital in a succ ...ns and their resulting impacts will turn out differently than anticipated. Risk involves uncertainty which is something that applies to situations in which
    6 KB (954 words) - 20:48, 23 March 2022
  • 103 B (10 words) - 14:13, 31 January 2023
  • ... what a risk is<ref name="Riskclass"/>; according to Macquarie Dictionary, risk is ''the chance of an adverse event depending on the circumstances and its It must be said that, regardless of how thorough and accurate the safety risk management may be, some incidents can not be avoided due multiple factors,
    20 KB (3,138 words) - 08:39, 7 May 2023
  • ...es can stem from inadequate risk management practices in projects, such as risk identification and decision-making.<ref name="inno12"/> ...the outcome of a project is closely linked to the effectiveness of project risk management.<ref name="risk19"/>
    23 KB (3,552 words) - 20:19, 8 May 2023
  • ...tfolio Management'']][[Category:''Risk Management'']] [[Category:''Project Risk Management'']] [[Category:''Uncertainty'']] ... that 80% of the effects come from 20% of the causes. It can be applied in risk management to identify and prioritize risks based on their potential impact
    33 KB (4,834 words) - 13:54, 7 May 2023
  • ...e, risk management gives an opportunity to the reduce the possibility of a risk occurring and its potential impact. 2.1 The Risk Management Profile
    4 KB (547 words) - 08:28, 9 April 2023

Page text matches

  • ...gression without reaching the previous' phases goals may entail increasing risk as the project develops.<ref name="HBTS"></ref> ... example can be addressed by the application of [[Risk management strategy|Risk Management Strategy]]. When dealing with complex projects the [[Causal Loop
    18 KB (2,770 words) - 09:26, 17 May 2019
  • ...e. <ref name=china>Dean Tjosvold, Zi-you YU, "Constructive Controversy and Risk-Taking for Team Innovation in China", 2001</ref> Constructive Controversy c ... possibilities, as it can both be used for educational purposes along with risk management and decision making in project management.
    23 KB (3,592 words) - 11:29, 20 December 2018
  • ...e or less only interconnected with his own department. Taking into a time/ risk perspective he could potentially over time change his opinion.
    23 KB (3,510 words) - 12:29, 20 December 2018
  • [[Category:Risk Management]]
    23 KB (3,616 words) - 12:11, 20 December 2018
  • *Book: Cavallo, Antonella. "Risk Management in Complex Projects. An exploratory study to managing unknown un
    21 KB (3,144 words) - 12:36, 20 December 2018
  • ...re important to keep them satisfied in order to mitigate a potential large risk. Stakeholders with both high interest and power should be managed closely. ...ith high power and low dynamism might be powerful but also predictable and risk mitigation related to this category can therefore be managed by proper plan
    19 KB (2,833 words) - 11:17, 20 December 2018
  • ...me projects over others to balance the portfolio in regards to for example risk and/or resource allocation. This makes sure that the portfolio is in balanc ...ts the probability of success, either as the probability in regards to the risk involved or the probability regarding the technical success (see the figure
    16 KB (2,684 words) - 11:35, 20 December 2018
  • ..., [http://apppm.man.dtu.dk/index.php/Risk_management_in_project_portfolios risk management] helps to handle part of the uncertainty; however, challenges wi ...ria. The criteria may be related to business strategy, financial benefits, risk, legal/regulatory compliance, human resources, marketing and technical crit
    28 KB (4,072 words) - 12:48, 20 December 2018
  • ...cal of the outcome using these methods. The interviewer always carries the risk that the interviewed person deliberately or inadvertently bias their answer
    15 KB (2,424 words) - 11:11, 20 December 2018
  • ...ject Risk Management :''' Project Risk Management is about identifying the risk within the project and how to ensure that it does not become a problem for '''11. Project Risk Management'''
    13 KB (1,877 words) - 11:09, 20 December 2018
  • :main article: [http://apppm.man.dtu.dk/index.php/Risk_management Risk Management] ...for and list several elements which can be used in the process of managing risk in projects, portfolios and programs..
    19 KB (2,957 words) - 11:21, 20 December 2018
  • ...ely; so that it provides the highest possible value at the lowest level of risk and at the same time fits the company's strategic goals. For this complex d ...rithms, designed to optimize the financial benefits, at a certain level of risk. Such software requires well-defined inputs to give useful outputs. A quest
    18 KB (2,784 words) - 12:33, 20 December 2018
  • ...ten subject groups (Integration, Stakeholder, Scope, Resource, Time, Cost, Risk, Quality, Procurement and Communication). The classification of these proce |style="background: #fff4d3;" |'''Risk'''
    26 KB (3,682 words) - 12:16, 20 December 2018
  • ...ext. Moreover, it facilitates effective communication, decision making and risk management throughout the program life cycle <ref>''https://www.projectsmar ...h as financial management, procurement management, resource management and risk management <ref name=5parts />.
    24 KB (3,559 words) - 09:39, 9 May 2023
  • ...When this is complete, an iterative release plan will be created including risk mitigation strategies. At the end of the phase, estimation will be done in ...o adapt to the specific project in order to gain value. This minimises the risk of applying APM on a project where it is not suited <ref name=seven/>.
    18 KB (2,884 words) - 14:18, 11 February 2021
  • ... ambiguous requirements, must be identified in order to reduce the project risk<ref name="cinq"/>.
    19 KB (2,807 words) - 12:15, 20 December 2018
  • ...''name''> ''http://survivors-fund.org.uk/annual-reports/annual-report-2010/risk/'' </ref>]] ...d a risk management tool simultaneously. The risk register is an efficient risk documentation tool when it is used correctly within project management.
    19 KB (3,144 words) - 12:17, 20 December 2018
  • ...ement- Principles and guidelines and M_O_R principles, which is a standard risk management framework, which can be used by any organization on any projects ... article might be similar to other articles; Risk analysis, risk register, Risk management strategy in project portfolios
    22 KB (3,501 words) - 11:07, 20 December 2018
  • [[Category:Risk]] ...h research. It is not enough to make a superficial research, as there is a risk to miss some important factors. SWOT has its limitations and it may be a go
    20 KB (3,244 words) - 11:06, 20 December 2018
  • ...d holds the highest risk for the project manager as his project is of high risk of being cut. This stage is thereby the biggest Go-Kill step in product dev The thesis of this article is that it is important to make risk assessments and thereby provide the initial investors with a proof of conce
    19 KB (3,084 words) - 12:31, 20 December 2018
  • ...rticle is an overview and summary of relevant body of knowledge concerning risk management in project portfolios. [[Project portfolio management]] is the s ...rtfolios Is More Than Managing Project Risks: A Contingency Perspective on Risk Management". Project Management Journal, 67-80 (2014)</ref>
    23 KB (3,310 words) - 12:41, 20 December 2018
  • The risk of too high ambitions are too complicated projects. These might become more ...ision process, they are not always likely to follow their leaders. Another risk is burnouts within management, when the leaders do not manage to ask for he
    18 KB (2,922 words) - 11:50, 20 December 2018
  • ...n be managed by, among others, system engineering, stakeholder management, risk management and sensitivity analysis, all being very analytical approaches. *Risk assessment
    25 KB (3,557 words) - 12:31, 20 December 2018
  • ... to continuously embark when exploring new dimensions in order to mitigate risk and suppress their corresponding consequences. ...s article provides a profound description of how to conduct a quantitative risk assessment by means of utilizing Monte Carlo simulations.
    20 KB (3,053 words) - 11:57, 20 December 2018
  • [[File:ISO 31000-2009 risk management strategy.JPG|thumb|300px|Risk management strategy as defined be ISO 31000:2009<ref>[ISO 31000:2009]</ref> ...out to be harmful to the project it is in general terms considered to be a risk.
    20 KB (3,201 words) - 11:27, 20 December 2018
  • ... aimed at fulfilling all the requirements such as time limit, cost budget, risk minimization and resources availability to create a specific product, servi ...ties and threats, growth and safety in order to maximize return in term of risk. Portfolio management is goal–driven and target oriented. Therefore, the
    16 KB (2,434 words) - 11:10, 20 December 2018
  • * Schedule risk * Financial techniques to mitigate risk
    25 KB (3,660 words) - 12:49, 20 December 2018
  • ...user and downstream process needs, and communicate an acceptable amount of risk.
    15 KB (2,404 words) - 11:12, 20 December 2018
  • ... ''project risk'' is defined typically in terms of different categories of risk in different phases of the project.<ref name="concept"></ref>
    26 KB (3,958 words) - 11:13, 20 December 2018
  • ...eholders. The stakeholder analysis is therefore an important part of the [[Risk management]] in project. It is essential to identify the stakeholders level ...t. Based on the stakeholder analysis it also becomes possible to perform a risk analysis, plan the entire project approach, plan the communication and impl
    17 KB (2,564 words) - 12:02, 20 December 2018
  • ...rter to announce a new scope-defined project, both fundamental aspects and risk evaluations must be carried out at this initiation stage. ...rough a participative and intensive process. What’s more, it reduces the risk of failing the project because of the project manager taking all decisions
    18 KB (2,825 words) - 11:15, 20 December 2018
  • ...s that directly support business objectives, and considering the portfolio risk as a result of the mix of components in a Project Portfolio at any time. <r *The portfolio risk is a result of the mix of the components
    15 KB (2,160 words) - 11:20, 20 December 2018
  • ...ess against performance target of time, cost, quality, scope, benefits and risk to make decisions. ...ess against performance target of time, cost, quality, scope, benefits and risk in order to make decisions, and recommend doing a review of team performanc
    23 KB (3,698 words) - 12:06, 20 December 2018
  • ...e the surroundings are ever changing and where the project plan itself can risk being changed due to unforeseen circumstances. Additionally, the customer
    14 KB (2,353 words) - 11:19, 20 December 2018
  • ...r projects on time and under budget within the scope is threatened and the risk increases when there is no control.
    24 KB (3,629 words) - 17:18, 16 November 2018
  • ...ject, risks are identified and managed throughout the project lifecycle. A risk is an uncertain event that can have e negative effect on one or more object This Wiki-article will describe the risk management Process, Risk matrix, Rumsfeld's Unknown-Knowns, inherent- and residual risks.
    29 KB (4,328 words) - 15:34, 16 November 2018
  • ...ding to PMI, the analysis of portfolio should include business, financial, risk, human resources issue, marketing, and technical criteria<ref>Project Manag ...mework for project portfolio selection".''International Journal of Project Management''17.4(1999):207-216 </ref>.
    23 KB (3,634 words) - 14:07, 11 February 2019
  • ...ther related business factors. The goal with this process is to reduce the risk of scope creep.
    21 KB (3,273 words) - 15:36, 16 November 2018
  • ...for the project, and it is the management of all these that constitute the Risk Management in Construction Projects. ...dy from the time a project starts. Therefore it is important to prioritize risk management, since it will likely lead to more problems if handling the risk
    16 KB (2,443 words) - 16:58, 16 November 2018
  • * [[Risk management in project portfolios]] * [[Monte Carlo Simulation of Risk]]
    3 KB (355 words) - 12:05, 30 August 2015
  • ...esolve it accordingly, and design a working environment that minimizes the risk of conflicts occurring. A conflict is spawned from multiple variables such ...evel of dominance is an agreeable and cooperative person. These people are risk averse, meaning that they prefer accommodating or collaborating. In a confl
    26 KB (4,072 words) - 15:30, 16 November 2018
  • * [[Managing Uncertainty and Risk on the Project]] * [[Risk Profile in Turnkey Projects]]
    4 KB (470 words) - 08:03, 25 August 2016
  • ...ents and implementation technique of Scrum aim to cope with complexity and risk within an organization. It facilitates the rational decision-making process
    18 KB (2,697 words) - 15:42, 18 December 2018
  • ...rs. Thus, the four following topics are key: the project organization, the risk management, the quality control and the problem management.<ref name="Numbe ===Risk Management===
    25 KB (4,074 words) - 14:59, 18 December 2018
  • The Themes are: Business Case, Organization, Quality, Plans, Risk, Change and Progress, these are described in more details later in the arti ...earn from Experience. Every project is unique and this uniqueness leads to risk and challenges. The goal is to avoid what didn't work in the past and imple
    23 KB (3,577 words) - 15:37, 18 December 2018
  • ...nd Quantitative Analysis, 6(05), 1263-1275.</ref> . The main principles of risk handing and best profit can be applied in project management. ...folio management (PPM). In modern project portfolio management, other than risk and return, there are elements such as benefits maximization, balance, stra
    29 KB (4,388 words) - 15:22, 18 December 2018
  • ...vel of uncertainty, the use of appropriate methods and tools influence the risk reduction of project failures. In this article we are going to illustrate t The product is the core of the project: every aspects from planning, risk management, responsibilities, configuration of the management, to control a
    30 KB (4,935 words) - 15:40, 18 December 2018
  • ...tion than those which are small and simple. This is because in those cases risk and loss to the company are lower than in the previous ones. Additionally, ...ref>. Moreover, the main reason to use this type of control is to minimize risk by recognizing deviations from the planned schedule and taking corrective a
    36 KB (5,576 words) - 15:22, 18 December 2018
  • ===Risk mitigation=== ... be. This means that a high-risk task would get more extra time than a low-risk task.
    16 KB (2,841 words) - 15:04, 18 December 2018
  • ... manageable, while it also facilitates easier Sprint-Planning, reduces the risk of over commitment and diminishes some estimation uncertainty.
    26 KB (4,022 words) - 15:39, 18 December 2018
  • ...tree analysis (Hereby noted as FTA) is a technique primarily used within [[Risk analysis]]. It has been around for about 50 years, and in all those years, ...nce, the Danish standard's guide to FTA<ref name=RiskMan>Risk management - Risk Assesment Techniques, Dansk Standard, 2010</ref> uses fewer gates and event
    16 KB (2,639 words) - 15:35, 18 December 2018
  • ...ability of the occurrence of a risk event given its risk source. To define risk, two definitions should be considered: * ''Risk source'', as an underlying state of affairs
    18 KB (2,933 words) - 15:19, 18 December 2018
  • ...d which leads to increased control of costs as well as the ability to make risk management decisions based on real data. ...e of time of the employees. Also, over optimistic schedules increasing the risk of failure as well as poorly defined or changing standards of quality.
    17 KB (2,765 words) - 21:45, 21 September 2015
  • ...apabilities and resources of the organisation. It provides a framework for risk mitigation, problem resolution, as well as a centralised point of view to p ...'''achieve balance''' - between long and short-term projects, high and low risk ones, in accordance with business’s goals.
    21 KB (3,127 words) - 15:01, 18 December 2018
  • * There is a risk the the Gantt Chart can become complex and be confusing to look at for big ...he different aspects of the Gantt Chart. It also discusses something about risk mitigation which has not been mentioned in this wiki article.
    19 KB (3,218 words) - 15:12, 18 December 2018
  • ...ethod becomes useful. The main principle with the CCPM is to strip off the risk of starting the project late or finish it early, and instead put some extra ... deadline. This is because if the work is delivered before time there is a risk of getting less time for the next project.
    27 KB (4,322 words) - 15:26, 18 December 2018
  • ...ch discipline. In order for the project manager to make the best planning, risk analysis etc., the complexity has to have more focus in the project managem ... can be a big challenge to handle. Within this computerization lies a high risk to the project schedule. This argues for more understanding of the computer
    17 KB (2,716 words) - 15:51, 18 December 2018
  • ...t the primary and secondary objectives, the ways to deal with uncertainty, risk and many other aspects. The yellow book can be considered as an innovative ...ain to fixed price (will be explained later), ODA managed to take over the risk of overcoming the budget and replaced the possible loss of safety or securi
    30 KB (4,537 words) - 15:16, 18 December 2018
  • ...he building before the construction even begins. This means minimizing the risk of the client, or other stakeholders, changing smaller or maybe even major
    19 KB (3,120 words) - 13:19, 18 December 2018
  • ...rge amount of parts involved. This approach analyzes how uncertainties and risk are created and how they can be managed by the means of Lean Construction p ...n this analysis, the implications and consequences that the use of certain risk management methods have in Lean Construction are assessed.
    14 KB (2,243 words) - 15:02, 18 December 2018
  • ...the Gantt chart '''does not highlight the WBS elements''' with the highest risk of failure or delay the project.
    21 KB (3,419 words) - 15:14, 18 December 2018
  • ... most used to plan into details a project, prevent uncertainties and avoid risk. These three techniques complete each other and offer a wide range of scena ...ut any scheduling tools. They are fundamental to avoid as much as possible risk and uncertainty. They are really helpful to have a wide view of all the dif
    39 KB (6,222 words) - 15:41, 18 December 2018
  • ...e Integration, Scope, Time, Cost, Quality, Human resources, Communication, Risk, and Procurement. ==Principle 6: Manage Risk==
    23 KB (3,693 words) - 15:45, 18 December 2018
  • === Portfolio optimizing and risk === ...significant part of LEGO`s portfolio management. The identification of the risk of a radically changed portfolio is always a key issue and it should be con
    22 KB (3,430 words) - 15:15, 18 December 2018
  • ... delivery times or budgets can affect this competitiveness and cause sever risk for the Return Of Investment (ROI). The main advantage doing a correct port ...ature from benefits and it is a requirement for the Program Governance and Risk Management. Apart from the planning point of view, the Quality management p
    23 KB (3,568 words) - 15:21, 18 December 2018
  • Uncertainties can affect the possible outcomes and project effectiveness: the risk management's objective is to assure uncertainty does not affect the project ...n particular how the critical path method is used in quantitative schedule risk assessment.
    936 B (140 words) - 17:25, 13 September 2015
  • ...x performance aspect that need to be managed: costs, time, quality, scope, risk and benefits. Prince2 is an integrated framework of processes and themes t ...s objective. If the Business Case is not rigorously built, organizations risk proceeding with projects that have few real benefits and poor alignment wit
    8 KB (1,269 words) - 13:46, 20 September 2015
  • * An initial risk assessment ...plan and analyzing the problem domain while trying to mitigate the highest risk elements. In other words, this is the phase where the project starts to tak
    24 KB (3,572 words) - 15:33, 18 December 2018
  • ===Risk Mitigation=== Uncertainty or risk is always a part of project management and it is essential for the project
    17 KB (2,936 words) - 15:07, 18 December 2018
  • ...agers like schedule development, cost estimating, resource allocation, and risk assessment. The lowest level called Work Packages, is defined by PMI as:”
    19 KB (2,996 words) - 14:46, 10 February 2022
  • ...ches related with the identification of the early warning signals are; the risk management, earned value management, project assessment and cause and effec ...th Niklander possible potential future problems are called risk, therefore risk management methods are suitable for identifying early warning signals.
    15 KB (2,228 words) - 15:10, 18 December 2018
  • ... time. While fast tracking reduces the project timeframe. It also involves risk because you are performing parallel activities that were originally planned ...en adding the necessary resources. By speeding up the processes there is a risk of lower quality of work<ref name="Sm15"/>.
    23 KB (3,695 words) - 14:56, 18 December 2018
  • ...gnitive biases that follows; can be used as tools to better deal with high-risk decisions in an inherently dynamic and complex world. ...nitive biases exist, and that the deviousness of the mind can constitute a risk to any project. But how can we discipline our mind to think sharper and cle
    25 KB (4,111 words) - 14:53, 18 December 2018
  • ...arkers that can be used to detect cancer earlier; second, to identify high-risk cancer patients; and third, to find markers that can predict treatment resp
    21 KB (3,183 words) - 15:46, 18 December 2018
  • ... the obstacles in the development process, on the other hand assessing the risk, opportunities and strengths that the project could meet. From the differen ...e the project. Cost itself encompasses various things, such as: resources, risk estimates, bills of materials, et cetera. All aspects of the project that h
    17 KB (2,786 words) - 15:50, 18 December 2018
  • ...e existing or potential risks. To enhance the effectiveness of the project risk management methodology and its processes a root cause analysis and its corr ... as the international risk regulation <ref name="Dr David Hillson">Project Risk Management,Future Developments by Dr David Hillson(2011)</ref> had already
    20 KB (3,030 words) - 15:26, 18 December 2018
  • The risk management's objective is to assure uncertainty does not affect the project The concept of loop of control in risk management is a comprehensive model consisting of applicable methods, imply
    968 B (139 words) - 17:09, 19 September 2015
  • ===Risk=== [[File:Risk_BIM.png‎|300px|thumb|right|Figure 7: Illustration of reducing risk by implementing BIM and choosing associated measure (click to zoom)]]
    30 KB (4,385 words) - 14:55, 18 December 2018
  • ...single and multi project environments. In addition, it has a chapter about risk management.
    29 KB (4,486 words) - 22:16, 28 September 2015
  • ...d to the risks and lastly how to control the risks. To assess the risks, a risk-management process tool will be utilized and further explained and manageme ...e:Billede_1.jpg|300px|thumb|right|'''Figure 1:''' The relationship between risk, uncertainty and the opportunities <ref name="Elec"> Yu Shiwang, Guo Na (20
    21 KB (3,422 words) - 15:25, 18 December 2018
  • ... to that, it can be used to identify aspects of project management (e.g. [[Risk management in project portfolios]]) that require proper attention and preci * Project Risk Management
    28 KB (4,139 words) - 15:27, 18 December 2018
  • * Risk list ...sk, 8. edition'' effective from 23 January 2015</ref>. The template to the risk process is shown in figure 4.
    20 KB (3,144 words) - 15:48, 18 December 2018
  • HRO’s strive to minimize the risk that unthought-of events happen by steering people towards mindful practice ...unknowns(See [[wikipedia:Johari_window|Johari Window]]) may oppose a major risk because unexpected events cannot be implemented into the procedures. While
    23 KB (3,439 words) - 15:54, 18 December 2018
  • ... reduce failures, prevent defects, control costs and schedules, and manage risk.
    8 KB (1,159 words) - 08:41, 22 September 2015
  • ...tp://apppm.man.dtu.dk/index.php/Risk_analysis], Risk Response Planning and Risk Control processes. The purpose of the article is to describe the Risk Management toolset and techniques, present and analyse their recent perform
    13 KB (1,980 words) - 15:41, 18 December 2018
  • ...p minimize uncertainty, which, in the chain of events, can further lead to risk mitigation.
    25 KB (3,882 words) - 15:24, 18 December 2018
  • In the '''EXPLOIT''' step a "low-risk" activity duration of the project is estimated. Here the estimators have to
    21 KB (3,389 words) - 09:36, 17 May 2019
  • '''SUBJECT CHANGED TO "RISK IDENTIFICATION", please see/review that article instead''' ...mparison of the related subject uncertainty. Defining and debating risk as Risk = probability * consquence
    783 B (114 words) - 11:13, 22 September 2015
  • ...d which leads to increased control of costs as well as the ability to make risk management decisions based on real data. ...e of time of the employees. Also, over optimistic schedules increasing the risk of failure as well as poorly defined or changing standards of quality.
    21 KB (3,455 words) - 15:18, 18 December 2018
  • ...nd that any gap between the required and available competencies could be a risk, and should be addressed. On the other hand there are listed three categori ...cribe to subject by noting that gaps in knowledge about a project can be a risk.
    17 KB (2,739 words) - 19:05, 28 September 2015
  • ...ns. Usually the lack of effective communication dramatically increases the risk projects face. Even though the most managers are aware of communication gap ... main task, but more like a context of achievements, in order to avoid the risk of being too focused on the task instead of big-picture goal.
    19 KB (2,722 words) - 14:58, 18 December 2018
  • ...tors as contractors, designers and consultants. [[Managing Uncertainty and Risk on the Project]] is especially important in turnkey. ... wiki-article will look at the leading nordic contractual risk factors and risk profile for actors in turnkey contracting in the construction industry.
    27 KB (4,284 words) - 15:26, 18 December 2018
  • ...ind, that milestones needs to be somehow challenging and carry a degree of risk for failure. This is done to inspire your team members to stay motivated an ... plan out of all the data, you need to master the critical path and proper risk management as well as choosing the suitable milestones and appropriate time
    12 KB (2,008 words) - 15:36, 18 December 2018
  • ...x performance aspect that need to be managed: costs, time, quality, scope, risk and benefits. Prince2 is an integrated framework of processes and themes t ...s objective. If the Business Case is not rigorously built, organizations risk proceeding with projects that have few real benefits and poor alignment wit
    23 KB (3,572 words) - 11:13, 21 September 2015
  • ...t/the-role-of-standardization-in-improving-the-effectiveness-of-integrated-risk-management</ref>]] ... our lives. We need to take risks to grow and develop. Effectively managed risk in hospitals, airport security, construction sites, projects, programmes, p
    21 KB (3,034 words) - 15:12, 18 December 2018
  • The risk management's objective is to assure uncertainty does not affect the project The concept of loop of control in risk management is a comprehensive model consisting of applicable methods, imply
    10 KB (1,435 words) - 13:30, 21 September 2015
  • ...x performance aspect that need to be managed: costs, time, quality, scope, risk and benefits. PRINCE2 is an integrated framework of processes and themes th ...s objective. If the business case is not rigorously built, organizations risk proceeding with projects that have few real benefits and poor alignment wit
    27 KB (4,166 words) - 15:42, 18 December 2018
  • FMEA is a risk management tool intended to identify all the potential failure modes of the ...ef name="Numbertwo">'''M. Shafiee ,F. Dinmohammadi, 2014, "''An FMEA-Based Risk Assessment Approach for Wind Turbine Systems: A Comparative Study of Onshor
    30 KB (4,526 words) - 15:48, 18 December 2018
  • # Increase worker safety and less risk exposure .<ref name="Pekka Huovila and Lauri Koskela"> Pekka Huovila and La ...trategy that increases/adds value to the customer while reducing waste and risk in the process. Like any other business, the main elements of the construct
    30 KB (4,402 words) - 15:50, 18 December 2018
  • Risk-taking and decisive are keywords when describing the portfolio management s ..., and without making sure that the qualities of the work processes and the risk management procedures were sufficient to support the increase in activity l
    25 KB (4,090 words) - 15:18, 18 December 2018
  • ...titioner is unable to map this in the identification step, there is a high risk of spending unnecessary time and resources trying to elevate constraints th
    11 KB (1,768 words) - 15:49, 18 December 2018
  • ...is relevant in many different contexts, see Figure 1. This article defines risk identification and its sub-processes, outlines relevant identification meth ...humb| Figure 1. Themes where being aware of risks is relevant, thus making risk identification a useful process. ]]
    22 KB (3,515 words) - 15:27, 18 December 2018
  • This article is going to give an overview of Risk Profiling in General Contracting. General contracting is the most common pr ...eholders, but for the process alone. When the construction takes place the risk increases extremely, especially in congested or populated areas.
    22 KB (3,514 words) - 15:25, 18 December 2018
  • *Risk management ...onses to the risks and controlling risks. Produces the following document: Risk registers.
    20 KB (2,923 words) - 00:05, 29 September 2015
  • ... via a number of key objectives such as profitability, ROI, and acceptable risk. A variety of methods are used to achieve this maximization goal, ranging f Achieve a desired balance of projects via a number of parameters: risk versus return; short-term versus long-term; and across various markets, bus
    16 KB (2,321 words) - 10:02, 22 September 2015
  • ...f successful oil extraction was large enough for the lenders to accept the risk of failure. ...en approached to provide some financial backing. Following this a thorough risk and feasibility study has to be carried out to ensure that the return on th
    27 KB (4,209 words) - 15:17, 18 December 2018
  • ...nd that any gap between the required and available competencies could be a risk, and should be addressed. On the other hand there are listed three categori ...cribe to subject by noting that gaps in knowledge about a project can be a risk.
    19 KB (3,033 words) - 13:30, 20 December 2018
  • ...single and multi project environments. In addition, it has a chapter about risk management.
    29 KB (4,519 words) - 15:45, 18 December 2018
  • *Risk management ...onses to the risks and controlling risks. Produces the following document: Risk registers.
    20 KB (2,929 words) - 15:28, 18 December 2018
  • ||[[Risk and Opportunities Management]] |[[Risk matrix]]
    9 KB (1,149 words) - 16:23, 1 September 2017
  • * Risk taking
    26 KB (3,782 words) - 13:11, 18 December 2018
  • The primary goal of risk management in construction is to give a systematic approach to identify and ...ure, finances and stakeholder engagement. Thus, it is important to start a risk management process before actually starting the construction project, in or
    15 KB (2,375 words) - 12:49, 18 December 2018
  • ...ver the past. This limits the learning, especially double loop, and future risk management. To enable double-loop learning when using Kanban it has to be s
    25 KB (4,116 words) - 13:10, 18 December 2018
  • **Overall risk management ...le="text-align:center"|0,7 <SPI <0.8 || considerable delay, causing the risk to not finish the work || adjust schedule, additional resources needed
    29 KB (4,294 words) - 09:35, 17 May 2019
  • ...a solution to that issue. As such it will define a risk and point out that risk management methods are really necessary within the management of a construc ... treat risks within a project, and then list a few usefull tools, like the risk matrix or the Gantt chart. Those tools will not be explained (on how to use
    37 KB (6,103 words) - 14:02, 18 December 2018
  • ... a strong and systematic approach to the whole risk analysis process. With risk process and strong project management practice the problems in a project ca ...eeds to be followed. RMP is a very robust approach that can be followed by risk managers and management teams.
    32 KB (5,360 words) - 12:41, 18 December 2018
  • ...secure place. However, the remote control or remote management can lead to risk transfer to local teams, wrong accountability or monitoring. Generally, tho ...g movement or withdrawing internationals (or any other staff at particular risk) while shifting responsibilities for program delivery to local staff or loc
    25 KB (3,830 words) - 14:00, 18 December 2018
  • ...tions of new projects, which fail to both review economic and non-economic risk and rewards across a set of projects and to ensure the projects are balance ... eliminated rather the cost savings obtained, hence the elimination of low-risk products will be preferred that may result in fewer benefits.<ref name="Wag
    33 KB (4,703 words) - 12:44, 18 December 2018
  • ...sure that they are not delayed and therefore put the entire project in the risk of being late. <ref name=Larson2014/> ...l activities in which special attention should be on in the project due to risk of delay. This is extremely beneficial in the monitoring stage when trackin
    40 KB (6,164 words) - 14:05, 18 December 2018
  • ...ject. If a late task is on the critical path, or if a task involves a high risk, actions can be taken to get the late task back on schedule. ...ential difficulties in the application on EVM in this domain together with risk mitigation strategies to counter these difficulties. One of key message is
    39 KB (6,064 words) - 13:08, 18 December 2018
  • ...f>. The use of buffers and buffer monitoring techniques clearly identifies risk associated with each task and its impact on the project completion. This he
    41 KB (6,367 words) - 17:31, 19 February 2023
  • *'''Risk Matrix:''' The [[Risk matrix]] can help to improve the robustness of the promises made to the sta ...est of the book other topics of project management, such as communication, risk, change, and quality, are related with stakeholders and project success.
    29 KB (4,375 words) - 14:04, 18 December 2018
  • ...ple undertaking projects with too optimistic expectations about budget and risk, which will most likely not be met. <ref name="Kahnemann"> Kahnemann, Dani ...lanners present their cases, they often brighten the numbers regarding the risk and the benefits of their projects. Regarding to Flyvbjerg, they are delibe
    25 KB (3,837 words) - 13:18, 11 November 2018
  • ...ager has to be able to plan the project, handle the stakeholders, create a risk analysis plan, handle the top management and the project team. But a topic
    19 KB (3,044 words) - 13:56, 18 December 2018
  • ...ed and the complexity increases as the scope of big projects increase. The risk of making a mistake in the calculation of the critical path becomes very hi
    36 KB (5,735 words) - 12:44, 18 December 2018
  • ... worse, and we achieved a particular result”, an entire literature about risk management can be found if interested in "How to do Projects" <ref name="ho ...in the end is a common outcome (this can be considered as a limitation and risk).Typical evidences shows that the opinion is converging during the phases a
    27 KB (4,208 words) - 13:08, 18 December 2018
  • ...ored during the project and are valuable for development of more extensive risk management plans. ...inary variable is highly unrealistic, and could even have an impact on the risk inherent in the project. By assuming binary behavior, the probability of in
    23 KB (3,641 words) - 12:59, 18 December 2018
  • ===Risk mitigation=== ...l be to include contingency for the tasks in the project where there are a risk for the task to be delayed.
    18 KB (3,120 words) - 12:59, 18 December 2018
  • ...mpleted. This is due to the fact that Cost-type arrangements have inherent risk for the sake of the owners focusing on the expense paid and forgetting to c One way of mitigating this risk is to accurately measure the value of work completed, compare that against
    34 KB (5,199 words) - 14:10, 18 December 2018
  • ...een the expected return, the expected consumed resources and the different risk factors. ...erdependences are generally in the areas of limited resources consumption, risk balancing and strategy alignment.
    26 KB (4,014 words) - 14:12, 18 December 2018
  • ...as a result of unexpected turns and have a positive impact on the project. Risk management is highly relevant and therefore present in all projects. ... stay on track. This article focuses on Rumsfeld’s unknown unknowns, the risk management process and response strategies to threats and opportunities.
    24 KB (3,454 words) - 14:52, 16 November 2018
  • *'''Contribute to risk management efforts,''' as ripple-effects are easier to foresee; ...essary activities, projects and elements to attain a goal, considering the risk or influence of different scenarios.
    29 KB (4,260 words) - 14:04, 18 December 2018
  • ... End the application of the Delphi Method, Quality Function Deployment and Risk Assessment is proposed. If applied in a flexible way and in combination wit ...ake fast decisions because these stages are characterized with the highest risk and uncertainty levels of the whole process of innovation. The Search phase
    34 KB (5,155 words) - 00:14, 6 November 2018
  • ... based on empiricism and it uses an iterative and incremental approach for risk control and predictability optimization. Scrum is based on three pillars: t
    28 KB (4,298 words) - 14:07, 18 December 2018
  • ...e as possible Scrum uses an iterative, feedback driven approach to control risk and optimize predictability which is supported by three pillars made of tra *Is there a high risk of failure?
    21 KB (3,393 words) - 14:13, 18 December 2018
  • ...dded value of the project when selecting which projects to run. Hence, the Risk-Reward Bubble Diagrams are considered useful for portfolio structuring. In the classical Risk-Reward Bubble Diagram, as suggested by Stage-Gate International among other
    22 KB (3,483 words) - 14:09, 18 December 2018
  • ...ki page gives a good overview of how to identify the risk and classify the risk at hand'' </ref>. ...just provide the stakeholder with new information about the project or the risk at hand in the project.
    19 KB (3,187 words) - 14:11, 18 December 2018
  • - Internal processes: resource requirements management, project backlog, risk management statistics, quality management statistics; ...ns, during the planning phase the main focus of project managers should be risk and change management and a clear and fast communication plan should be est
    25 KB (3,970 words) - 14:01, 18 December 2018
  • ...egy and portfolio planning was simplified, as alternatives, such as NPV or risk analysis, were difficult to carry out and called for extensive data input.
    24 KB (3,919 words) - 12:32, 18 December 2018
  • ... more detailed analysis is made. Activities in this phase can be: Scoring, Risk assessment, return on investment etc. ...weighted 0.5. Innovation is the second most important and is weighted 0.3. Risk the least important of the three criterions and is rated 0.2.
    20 KB (3,072 words) - 12:45, 18 December 2018
  • ...risk for subjectivity should be decreased. However, there still might be a risk that the team will manipulate the stakeholders in order to conduct their ow ...t be overlooked and hence the criteria will only focus on partial areas. A risk is also that the team/team member overlook important criteria deliberately
    26 KB (4,151 words) - 13:07, 18 December 2018
  • ... methodology following the goal to optimize planing capability and control risk.
    4 KB (572 words) - 05:53, 13 September 2016
  • *''''' Risk ''''' Because of this complexity, another characteristic is '''risk'''. In most of those projects and especially in the construction field, bud
    32 KB (5,070 words) - 12:42, 18 December 2018
  • The most important risk is how to make the subcontractors commit to the Last Planner System, especi Another risk is that people can overestimate the time needed for each task, add one or t
    20 KB (3,196 words) - 14:12, 18 December 2018
  • ...estrate, prioritize and benefit from projects. This approach examines the risk-reward of each project, the available funds, the likelihood of a project's ...multiple NPD projects (innovation portfolio) to be flexible and reduce the risk to the lowest level possible. Hereby each project generates several changes
    38 KB (5,626 words) - 14:08, 18 December 2018
  • ...ontrol, Benefits Management, Financial Management, Stakeholder Engagement, Risk Management, Organisational Governance and Resource Management <ref name="BA ... the results reveals big difference between the department, there can be a risk of people only looking out for themselves and their results. That is why it
    21 KB (3,418 words) - 14:08, 18 December 2018
  • ...cess Analysis and Design Work Session, Business Requirements Work Session, Risk Assessment Work Session and Work-in-Progress Review Session. * Reduction of the risk of scope creep from 80% down to 10%
    21 KB (3,329 words) - 14:03, 18 December 2018
  • ...fied people will leave the job and find somewhere else to work. While this risk exists, it is possible to point to things that aren't working properly or c
    19 KB (3,182 words) - 13:55, 18 December 2018
  • *Risk management plan '''''Risk Management plan'''''
    29 KB (4,536 words) - 12:48, 18 December 2018
  • ...the company.<ref name="Finance"> Tarantino, Anthony & Cernauskas, Deborah "Risk Management in Finance: Six Sigma and Other Next-Generation Techniques", ''J
    22 KB (3,454 words) - 12:58, 18 December 2018
  • ...ir time. The contracts were unique because all contractors pooled together risk payments and were promised a share in the event that their work was finishe ...hese people are not clear on their roles and responsibilities they run the risk of misunderstanding their responsibility and thereby waste time.
    16 KB (2,672 words) - 14:03, 18 December 2018
  • ... Heathrow Express Tunnel Collapse'', slideshow from the Advanced Course on Risk Management in Civil Engineering, LNEC, Lisbon, Nov 17-22, 2008 [http://risk ...92] consulted on 14Sep2016 </ref>. The banks and insurance companies had a risk-averse policy, within a diminishing infrastructure investment environment,
    33 KB (5,053 words) - 13:00, 18 December 2018
  • ... on how you define the X-Y axis’s. The most common bubble diagram is the Risk/Reward diagram where you typically have the [[Wikipedia:Net present value|N ...rd and strategic fit, however the selection criteria can also be regarding risk and probability of success.
    20 KB (3,186 words) - 13:58, 18 December 2018
  • ...oose face. On the other hand if the leader were Chinese there would be the risk of the Danes asking to many questions and by that make the leader loose fac
    13 KB (2,100 words) - 12:49, 18 December 2018
  • ==Risk management ==
    2 KB (317 words) - 06:05, 12 September 2016
  • ...ors, calculate labor intensity, and report on the share of worker hours at risk of social impacts. - Risk mitigation<br>
    28 KB (4,202 words) - 12:47, 18 December 2018
  • ...can facilitate the detection of constructability problems and mitigate the risk, allowing investigation for finding solutions. ...tors and the direct constant communication facilitate the reduction of the risk.
    23 KB (3,411 words) - 13:09, 18 December 2018
  • ...o be estimated in order to apply Boolean algebra and calculate the overall risk of the top event occurring. Some events can be based on evidence and other ...cause it is able to trigger the top event on its own, therefore additional risk treatment should be used on this base event in order to reduce the probabil
    29 KB (4,848 words) - 12:37, 18 December 2018
  • ...rgency. The amount of the funds should be determined based on the level of risk that the project faces, and on the project budget itself. ...ve in mitigating risk, it should only be part of a complete and structured risk mitigation plan.
    18 KB (2,690 words) - 12:47, 18 December 2018
  • ...e management plan, Activity list, Activity attributes, Resource calendars, Risk register, Activity cost estimate, Enterprise environmental factors, Organi ...t, Activity attributes, Activity resource requirement, Resource calendars, Risk register, Resource breakdown structure, Enterprise environmental factors,
    28 KB (4,076 words) - 14:09, 18 December 2018
  • ...n order to avoid or at least mitigate any harm that may cause this certain risk. ''However, how to decide and prioritize which risk is more dangerous and need to be treat first? ''
    19 KB (2,943 words) - 12:36, 18 December 2018
  • ...onality of Utilitarian theory do not reflect people's actual choices under risk, by not taking into account their cognitive biases.'' ...ming]] is the context in which choices are presented. People tend to avoid risk when a positive frame is presented but seek risks when a negative frame is
    37 KB (5,425 words) - 13:00, 18 December 2018
  • ===Risk Mitigation=== In every project there is always a degree of risk and uncertainties that should be taken under consideration by the project m
    24 KB (4,080 words) - 12:34, 18 December 2018
  • ...n many ways depending on how it impacts cost, time, quality, and potential risk. It is here where the overall communication and planning seemed to have a b ...tening in delivery time it is risky even under the best circumstances. The risk was even greater when using techniques containing new and unproven technolo
    22 KB (3,463 words) - 14:07, 18 December 2018
  • ...hodology following the goal to optimize planing capability and controlling risk (see fig. 1). <ref name="AD" /> Scrum is performed by cross-functional team ... flow has to be simplified in order to avoid complexity and with that, the risk of unprocessed information. A transparent and direct information flow leads
    26 KB (4,155 words) - 14:09, 20 December 2018
  • The most popular chart is the risk-reward which shows the probability of success on the vertical axis and the The risk-reward portfolio mapping involves keeping the projects into four different
    19 KB (3,038 words) - 18:41, 19 September 2016
  • ...IM helps many more fields - in communication between the involved parties, risk prevention, save cost, quality improvement, etc.
    20 KB (3,114 words) - 13:59, 18 December 2018
  • ...ducts in accordance with the time,<br />cost, quality, scope, benefits and risk performance goals.''" <ref name="PRINCE2_2">''Managing Successful Projects ! Risk
    34 KB (4,895 words) - 11:19, 26 April 2019
  • ...es the demand for more complex and unique constructions increases, and the risk for failure increases with it. Furthermore, the nature of construction proj ...ect Management focus areas, such as ''Communication'', ''Stakeholders'', ''Risk'', ''Cost'', ''Quality'' and ''Time''.
    31 KB (4,891 words) - 14:01, 18 December 2018
  • [31]R. J. Yang, “Stakeholder-associated risk networks in green buildings: China Versus Australia,” Proc. 30th Annu. As
    35 KB (4,877 words) - 12:34, 18 December 2018
  • ...oject management processes, such as activity definition, project schedule, risk analysis and response, control tools or project organization. Moreover, the * WBS helps the project team reducing the risk of missing important tasks and work during the project period.
    16 KB (2,528 words) - 09:41, 13 May 2019
  • The most popular chart is the risk-reward which shows the probability of success on the vertical axis and the ...r bubble diagram in portfolio management is the one that displays project risk (probability of success) on y axis and reward on X axis as shown in[[Medi
    23 KB (3,608 words) - 13:07, 18 December 2018
  • |[[Risk management in industry 4.0]] |[[Risk Log]]
    8 KB (1,068 words) - 09:36, 23 April 2019
  • ...ing all decisions, this should be the first port of call before taking the risk. There are seven processes that aid a Stakeholder Manager within a project ...anager should at every step of this process, look into what is the largest risk and how can this be mitigated.
    21 KB (3,160 words) - 15:08, 23 February 2021
  • Secondly, the addition of new benefits and the decrease of risk in the existing one. Consequently, is important to minimise this risk by communicating the benefits and aligning them with the interest of the be
    28 KB (4,492 words) - 21:35, 4 March 2019
  • ...ns and technical appropriateness and completeness. Furthermore, review the risk analysis regarding the functional design and for impact on safety testing.<
    35 KB (5,350 words) - 16:21, 4 March 2019
  • ...exchange such advantages as delivery time, quality, reasonable price, less risk of theft. Many people, however, are reluctant to live in a prefabricated ho
    8 KB (1,168 words) - 12:30, 16 February 2019
  • ...agement, and risk management as this is mentioned in PMI standards, and in risk management given in AXELOS standards. ...Aven and E. Zio, "Some considerations on the treatment of uncertainties in risk assessment for practical decision making," Reliability Engineering & System
    31 KB (4,552 words) - 12:36, 3 March 2019
  • ... of uncertainty, namely the known knowns (change control), known unknowns (risk management), unknown knowns (planning & communication errors) and the unkno ...ction will first describe what uncertainty really is as well as link it to risk management. Furthermore, the different types of uncertainty will be outline
    11 KB (1,738 words) - 13:42, 22 February 2019
  • ...e way he works and very rarely is he rewarded for his performance. Another risk this person might encounter is that future estimates concerning his work wi ...superficially with these aspects. In addition to that, there is always the risk that project managers will not be willing to agree in shortening their safe
    21 KB (3,370 words) - 12:56, 18 December 2018
  • ...erican companies shows that as much as 37% of the projects are projects at risk. ... are many early warning sign but the reason for numerous projects being at risk is the fact that companies cannot read those signs.<ref name="Kerzner"/>
    19 KB (3,021 words) - 14:26, 16 November 2018
  • |[[Contractual uncertainty and risk allocation]] |[[Risk profiles in project management]]
    4 KB (570 words) - 12:27, 8 December 2017
  • ...pact of threats and challenges. A guide to the implementation and use of a risk register can be found on the wiki.
    12 KB (1,877 words) - 17:40, 16 November 2018
  • ...uction company. Like in every process that develops over time, are there a risk for knowledge to be lost by changes of the team members and/or leaders/mana
    20 KB (3,095 words) - 12:29, 18 December 2018
  • ...s can be painted before the installation of the roof is completed, but the risk of damaging the painting by dust and other things by this schedule planning ... task are usually held responsible if the time schedule does not hold. The risk of delaying the time schedule therefore incurs to design for worst case sce
    25 KB (4,174 words) - 19:12, 17 November 2018
  • ...d trust, better project performance and reduced litigations. It lowers the risk of cost overruns and delays, as a result of a better time and cost control ...k without risks; to develop trust between two different companies can be a risk in itself, although trust is one of the key elements of successful partneri
    17 KB (2,572 words) - 09:45, 17 May 2019
  • * Greater importance given the concept of risk ... on performance, which was achieved by combining the process approach with risk-based thinking, and employing the <span class="plainlinks"> [http://apppm.m
    27 KB (3,835 words) - 13:35, 19 November 2018
  • ...production efficiency decreases what rises production costs. There is also risk of low quality in the project management when construction is not the main ...se of no competition and close relations of contract members there is high risk of low effectiveness and communication problems.
    12 KB (1,743 words) - 12:33, 19 November 2018
  • ...tive risk management process including requirements, project, and business risk considerations.
    16 KB (2,561 words) - 17:00, 16 November 2018
  • * The high risk of the lemon problem, especially when tendering is open to all, because the
    17 KB (2,756 words) - 13:36, 19 November 2018
  • ...ve the best rate of success. By not having any structure there is a severe risk of achieving projects where the different tasks will start to work against
    11 KB (1,918 words) - 11:09, 12 June 2017
  • ...how construction business deals with risk management, risk identification, risk quantification and a particular emphasis will subsequently be shown towards ...ow focusing the attention of project management on early identification of risk and uncertainty and highlight those areas where further design, work develo
    19 KB (2,895 words) - 14:04, 19 November 2018
  • ... the project life cycle requires greater effectively risk managing. A good risk management approach requires a systematic methodology, knowledge and experi ...oints that must be investigated to achieve a full risk profile. At the end risk profiles and its limitations will be discussed.
    18 KB (2,897 words) - 19:19, 20 November 2018
  • ...gh simulations, verifying the reliability of the schedule and [[Minimizing Risk and Uncertainties in Construction Projects]]. In addition, the construction
    25 KB (3,674 words) - 19:21, 20 November 2018
  • There's a risk that designers will feel threatened by removing a large part of the creativ
    24 KB (3,639 words) - 19:21, 20 November 2018
  • ... '''EVA''' Forecast. The uncertainty of the forecast will directly equal a risk for the project.
    17 KB (2,740 words) - 13:21, 27 November 2018
  • ...lient. The professional system slowly became a risk-shedding rather than a risk-sharing system<ref name="winch">Winch, Graham M., Wiley-Blackwell, (2010) " ...rd, how to manage the problem of moral hazard, contractual uncertainty and risk allocation and the dynamics of adversarial relations is presented. The refe
    16 KB (2,368 words) - 19:24, 20 November 2018
  • ... problems must be identified before assessment, respond and control of the risk can take place. Although it is one of the key elements in the process, it i ...s for identifying risk sources, are profoundly important for the overall [[Risk assessment]] of project and thus contribution to the success of the project
    21 KB (3,036 words) - 19:26, 20 November 2018
  • ...ve the best rate of success. By not having any structure there is a severe risk of achieving projects where the different tasks will start to work against
    23 KB (3,603 words) - 12:32, 19 November 2018
  • ...st with the addition of any costs related to employer changes and employer risk events, is determined. The final target cost is then compared to original t ...s’ goals. Both parties are motivated to control costs, as they share the risk of loss and profit through a gain-share/pain-share mechanism.<ref name="SFT
    27 KB (4,200 words) - 19:27, 20 November 2018
  • [[File:bli.PNG|400px|thumb|right|Use of risk management in construction projects<ref name="Martin" />]] ...nces, thus introducing risk management. With early realization of possible risk sources it is possible to mitigate high costs that other wise can threaten
    19 KB (3,032 words) - 19:27, 20 November 2018
  • ...on Winch and Leiringer state that the current literature regarding project risk management are not up to date and that more research is required in order t
    16 KB (2,321 words) - 19:27, 20 November 2018
  • ...ect, leading eventually to disputes between them. Consequently, additional risk is included in the overall final cost estimation, which maybe conclude to h
    10 KB (1,556 words) - 21:46, 12 June 2017
  • ...ssigned. In such cases, the problem is classified as decision making under risk. ... of interest in the decision analysis, regarding the decision making under risk, is the expected value of criterion also reffered to as the Bayesian princi
    21 KB (3,308 words) - 19:28, 20 November 2018
  • |style=" background-color:white; vertical-align:top; text-align:left;" |'''Risk & Opportunities'''[[File:Risks.PNG|frameless|left|50px]] |[[Risk and Opportunity Management]]
    25 KB (2,790 words) - 09:49, 13 August 2017
  • ...sks can be highly numerous and mostly unpredictable<ref name="nerija"/>. A risk in a project can be defined as “an uncertain event or condition that, if ...and, with time, changes occur in people’s meanings, technologies, etc. [[Risk management]] should, therefore, be a daily, on-going process throughout the
    24 KB (3,670 words) - 19:20, 20 November 2018
  • |[[Risk management in project portfolios]] |[[Risk-Reward Bubble Diagrams in Project Portfolio Prioritization]]
    3 KB (375 words) - 21:32, 20 November 2018
  • ...ssigned. In such cases, the problem is classified as decision making under risk <ref name="Khalil"> Khalili Damghani, K., M. T. Taghavifard, and R. Tavakko ... of interest in the decision analysis, regarding the decision making under risk, is the expected value of criterion also referred to as the [[Bayesian prin
    35 KB (5,280 words) - 09:51, 13 July 2017
  • ...th: 26%; background-color:white; vertical-align:top; text-align:left;" |'''Risk & Opportunities'''[[File:Risks.PNG|frameless|left|50px]] |[[Risk and Opportunities Management]]
    15 KB (1,817 words) - 08:38, 9 August 2022
  • ... for undertaking a project, in terms of evaluating the benefits, cost, and risk of alternative options and rationale for the preferred solution. Its purpos ...ref name="Overview"/> All opportunities are offset by a certain element of risk. A summary should be included of the aggregated risks and highlight the maj
    21 KB (3,343 words) - 00:29, 6 November 2018
  • ... End the application of the Delphi Method, Quality Function Deployment and Risk Assessment is proposed. If applied in a flexible way and in combination wit ...ake fast decisions because these stages are characterized with the highest risk and uncertainty levels of the whole process of innovation. The Search phase
    28 KB (4,391 words) - 13:01, 9 August 2017
  • ... from is indicated by the white smiles in figure 3.10. They argue that the risk of measuring other influences, outside the project scope, should decrease i
    17 KB (2,780 words) - 20:43, 4 March 2019
  • ...a wide area of getting work done the right practice is necessary. However, risk for project failure will always be present. It is not only due to the proje ...ly improve its market share then don’t wait too long to launch it due to risk reasons and desirable short term huge profits.
    8 KB (1,329 words) - 11:48, 3 August 2017
  • *Factor in element for risk
    4 KB (679 words) - 15:27, 10 August 2017
  • ...ritical approach to the financial appraisal, and be aware of the levels of risk or uncertainty attached to both costs and benefits.
    4 KB (684 words) - 10:49, 16 November 2018
  • Risk Managers due to something he said in a news briefing in February 2002 regar in terms of risk management.
    2 KB (347 words) - 15:56, 10 August 2017
  • [[File:Risk&Costvstime.PNG|thumb|upright=2.0|Impact of Variable Based on Project Time]]
    18 KB (2,592 words) - 09:30, 17 May 2019
  • SWOT-analysis in risk management in projects: https://www.projectsmart.co.uk/swot-analysis-in-pro ...opment tool used in business organizations. However, it can also work as a risk management tool.
    1 KB (216 words) - 11:17, 12 February 2018
  • ...lanners present their cases, they often brighten the numbers regarding the risk and the benefits of their projects. Regarding Flyvbjerg, they are deliberat ... use of Reference Class Forecasting, it would be possible to foresee these risk contingency more accurately in the initial phases of the project.
    27 KB (4,257 words) - 14:00, 16 February 2020
  • ...cost, but it may not affect the communications management plan or level of risk. These process interactions often require trade-offs among project requirem * Performance of risk management and discontinuity management together with the project team memb
    21 KB (2,988 words) - 08:02, 23 April 2019
  • |[[Concept of Risk Quantification and Methods used in Project Management]] |[[Impact and Probability in Risk Assessment]]
    6 KB (763 words) - 21:24, 2 October 2017
  • ...sk levels of projects; ranging from radical new product solutions to lower-risk line extensions. ...he chance of costly redesign in the later phases. In other words, the cost-risk trade-off as can be identified in the new product development process is al
    30 KB (4,297 words) - 09:27, 17 May 2019
  • ...ppropriate risk quantification is very important. However, to quantify the risk, once it has been identified, in order to remove or reduce it and take a de ... and challenges that are faced during risk quantification, applications of risk quantification and limitations or new challenges are analyzed briefly in th
    21 KB (3,113 words) - 19:52, 22 September 2017
  • ... taking in order to counteract them. It can be done by either lowering the risk of the problems ever happening or lower the impact it could have on the pro |Risk
    20 KB (3,246 words) - 18:23, 17 November 2018
  • ...d portfolios associated with many risks with proportionally many potential risk responses it is challenging to treat all risks most beneficially for the pr One tool to help providing factual justification for the treatment of each risk and to establish an overview is the '''decision tree'''. <br>
    24 KB (3,507 words) - 19:00, 17 November 2018
  • ...e of many pitfalls in projects. Stage-Gate takes this into account, as the risk and uncertainty will decrease the longer out in the process the project evo *[[Wikipedia:risk management|Risk management]]
    18 KB (2,797 words) - 18:44, 17 November 2018
  • Part of a project’s risk management, this method optimises resources and brings about financial bene ... estimates a project involving mechanical parameters requires a structured risk analysis, HAZOP may be proceeded. Employees, creators of the project and ex
    22 KB (3,365 words) - 18:24, 17 November 2018
  • Another relevant discipline that uncertainty management imbricates with is risk management, however with some basic differences. Risks are per default nega ...ne way test and prioritise scenarios is using Wilsons Matrix, similar to a risk matrix, mapping the importance on probability and impact (Figure 4).
    24 KB (3,614 words) - 18:41, 17 November 2018
  • ...due to the ambiguous questions that have to reply <ref name="PMI"></ref>. Risk versus reward, maintenance versus growth, and short-term versus long-term p ...g, <span class="plainlinks">[https://en.wikipedia.org/wiki/Risk_management Risk Management]</span> and Generation of new ideas <ref name="EPM"></ref>. On
    25 KB (3,832 words) - 13:02, 23 November 2018
  • ...usiness recovery and business resumption (data protection and planning and risk assessment). The different components can be addressed and implemented diff
    572 B (71 words) - 14:55, 12 September 2017
  • ...om the market assessment, where the preferences of the users are examined. Risk associated with the various viable solutions must be identified, both regar
    20 KB (3,317 words) - 10:14, 13 May 2019
  • =Risk limitation= ...n more personnel is required for the task. Smaller project can reduce this risk by adopting other earned value rules:
    21 KB (3,096 words) - 09:23, 30 September 2017
  • ...ating contingency to the base estimate is essentially a form of mitigating risk that accounts for such uncertainties. This article explains the purpose of ...ect’s cost estimate can play an important role in addressing the project risk profile to important stakeholders across the organization by demonstrating
    22 KB (3,086 words) - 13:04, 16 November 2018
  • ...he team managing the project and the decision makers. On the contrary, the risk of the project is effectively managed stage by stage, because the number of * The light version used for moderate risk projects (3 stages)
    31 KB (4,877 words) - 18:47, 17 November 2018
  • ...maller companies tend to have tighter monetary controls, mainly due to the risk of failure. Larger companies may have the luxury to spread project losses o ==Risk Control==
    19 KB (2,951 words) - 09:30, 17 May 2019
  • ...nt to pay for. Furthermore, every time a product is moved it heightens the risk for it being delayed, lost or damaged.) ...anufacturing company Procter & Gamble (P&G) is for example avoiding market risk, by cutting down stock through cooperating with wholesale companies, includ
    23 KB (3,600 words) - 18:48, 17 November 2018
  • ...ing is the process of building a willingness in others to put them self in risk based on the project managers action. To create an environment where person
    20 KB (2,979 words) - 18:52, 17 November 2018
  • ...for software projects as a foundation for theory building about IS project risk management [[Category:Project Management]][[Category:Uncertaity]][[Category:Risk]][[Category:Method]]
    22 KB (3,111 words) - 15:01, 16 November 2018
  • ...case or whether it is unlikely to be successful and therefore to much of a risk to continue with.
    19 KB (2,947 words) - 10:32, 2 October 2017
  • ...eserve. This depends on the project and associated risks identified during risk analyses.
    20 KB (3,134 words) - 18:51, 17 November 2018
  • ...assessing a change project’s chance of success, where the other one is a risk evaluation tool. ...a project is on plan, weekly or monthly reviews are usually necessary. The risk of a project or change failing, is higher if the reviews are too infrequent
    27 KB (4,250 words) - 18:46, 17 November 2018
  • ... made it a valuable tool for risk identification, and in a wider sense in Risk Management as it can help a team figure out how best to handle the risks wi This article will consider how the diagram is appropriately used in Risk Management as well as its purpose and limitations. It will also touch upon
    20 KB (3,475 words) - 19:05, 17 November 2018
  • ...at the risks and at last review the treatment of the risks which result in risk control. The fourth step of the process, review, is done for analysing the Risk as definition is probability P times the impact I giving the formula:<ref n
    47 KB (7,552 words) - 18:54, 17 November 2018
  • ...d. The probability/impact matrix is a great way to organize and show which risk that should be focused on when taking decisions. ...n decision tree analysis<ref name="Probability" /> is used to mitigate the risk and cost of the decision.
    18 KB (2,948 words) - 18:54, 17 November 2018
  • ...izing a Critical Path Analysis, and risk management, through for example a Risk Cube. ...ly in the team, and with external stakeholders, as well as the project’s risk management, in which Carrera may not have utilized the most optimal tools t
    15 KB (2,306 words) - 18:55, 17 November 2018
  • The four categories also risk creating confirmation bias, a situation where managers only take interest i
    20 KB (2,881 words) - 13:31, 10 November 2018
  • ...ain means leading with a crucial characteristic of project management: the risk. Common project risks like the increase in a product life cycle cost, an un
    17 KB (2,455 words) - 18:57, 17 November 2018
  • ... suitable for use with experienced Contractors familiar with sophisticated risk management techniques. The Silver Book provides conditions relating to ‘T ...pment - A Clear specifications that include measurable KPIs to reduce the risk of contract disputes, cost blow-outs and poor outcomes<br />
    25 KB (3,660 words) - 18:01, 17 November 2018
  • ...art in the planning meeting. If a field is excluded there will be a bigger risk of the timetable not being upheld. It is also important that all parts unde
    27 KB (4,416 words) - 19:02, 17 November 2018
  • ...s are more easily integrated into the project and therefore it reduces the risk of delays and exceeds projects. This article tells more about the different factors which might increase the risk of change orders in a project. It gives five different factors and explain
    15 KB (2,558 words) - 12:55, 16 November 2018
  • ...empathy, warmth, genuineness, concreteness, initiative (solution-oriented, risk-taking), immediacy (mutual, intimate, "here-and-now" sharing), self-disclos
    28 KB (4,271 words) - 19:01, 17 November 2018
  • ...s, and different aspects have been discussed like the governance, quality, risk, and configuration topics. Furthermore, there is an analysis on how agile c
    25 KB (4,007 words) - 18:43, 17 November 2018
  • ...k because it learns and adapts. Simply put this would mean that what was a risk today will not be tomorrow, doing this enough times and the antifragile sys ...fragility and its Implications for the Practice of Risk Analysis", 2015, ''Risk Analysis'', Vol. 35, No. 3</ref>
    17 KB (2,811 words) - 14:30, 16 November 2018
  • ...The project success depends on agreeable level of risk tolerance and early risk management planning. ... environment. Therefore, it is important to first define “risk” and “risk tolerance” and how it relates to project management in a technology-driv
    13 KB (2,048 words) - 09:59, 17 May 2019
  • ...r idle a smaller amount of their resources, therefore decreasing the costs risk. ...r idle a smaller amount of their resources, therefore decreasing the costs risk.
    25 KB (3,689 words) - 19:10, 17 November 2018
  • ...in organizations, can be planned. Except its use in project management and risk analysis, decisions trees are also used in data mining and statistical anal ...y]</span> and <span class="plainlinks">[https://en.wikipedia.org/wiki/Risk Risk]</span>/<span class="plainlinks">[https://en.wikipedia.org/wiki/Expected_Va
    23 KB (3,467 words) - 13:07, 23 November 2018
  • ...management. The process of risk quantification is an important step of the risk management process and therefore, important to ensuring the success of a pr ...ne about them" [http://pmtips.net/blog-new/defining-risk-management-part-4-risk-quantification]. </div><br />
    32 KB (4,716 words) - 13:15, 23 November 2018
  • *'''Under risk'''. A condition in which the availability of each alternative and its poten
    27 KB (4,228 words) - 18:47, 17 November 2018
  • '''Impact''' and '''probability''' are the two main components of [[Risk analysis]]. Looking at impact versus probability is common in order to cate ...reases the likelihood for the success of a project <ref name=" Winch " />. Risk management involves identifying possible risks and analyzing their potentia
    30 KB (4,345 words) - 14:57, 16 November 2018
  • ...om the buyer organization, has the goal to avoid, mitigate or transfer the risk to the vendor. =Risk and pitfalls=
    21 KB (3,258 words) - 10:23, 7 January 2019
  • ...case or whether it is unlikely to be successful and therefore to much of a risk to continue with.
    19 KB (2,964 words) - 09:23, 17 May 2019
  • ...roject. Using benchmarking is a good way to predict the possible issues or risk that one might encounter. Thus, giving the opportunity to plan ahead and ta ...towards areas where the companies know faults occur, often a result of the risk assessment, QP or Benchmarking. The Check Sheets is a combination of preven
    20 KB (3,205 words) - 18:21, 17 November 2018
  • ... End the application of the Delphi Method, Quality Function Deployment and Risk Assessment is proposed. If applied in a flexible way and in combination wit ...ake fast decisions because these stages are characterized with the highest risk and uncertainty levels of the whole process of innovation. The Search phase
    34 KB (5,151 words) - 15:32, 4 November 2018
  • ...all strategy and survival of the construction company and the tendency for risk. Some of such other factors influencing tenders are<ref name="PMI_book"> He ..., al the risk is assigned to the contractor. In a unit price contract, the risk of inaccurate estimation of uncertain quantities for some key tasks has bee
    29 KB (4,381 words) - 19:30, 20 November 2018
  • ...thods, such as: Gantt Charts, Work Breakdown Structures, portfolio graphs, risk management, cost and schedule estimation methods, Key Performance Indicator
    7 KB (1,051 words) - 19:07, 25 April 2023
  • ... dashboard <ref name=Kerzner/>. For instance, having a dashboard monitor a risk, quality, cost or other, when using a color from a traffic light, the viewe ...re familiar with dashboards. By simply setting up the dashboard there is a risk of the dashboards not being used as intended <ref name=Kerzner/>.
    23 KB (3,628 words) - 19:04, 17 March 2022
  • ...ny responsibilities build on each other and individually contribute to the risk of incorrect deliveries, which can endanger the health of the project <ref Milestone Trend Analysis is primarily used to assess and control the high risk of project delays. Therefore, when preparing tasks and schedules, buffers f
    24 KB (3,726 words) - 20:42, 19 March 2022
  • |[[Portfolio Risk Management Process]] |[[Risk Management in Renewable Energy Projects]]
    8 KB (1,000 words) - 09:28, 18 February 2019
  • ...d tool and technique in some knowledge areas, such as Scope Management and Risk Management.<ref name="PMBOK"/> Since brainstorming usually requires multipl ...roduct development, problem solving etc. Brainstorming plays a big role in Risk Management for example; when identifying risks, assessing the situation and
    21 KB (3,264 words) - 17:01, 16 November 2018
  • ...rnment or biomass energy, which discuss shortage and supply chain problem. Risk is a key part of all these technologies and how to manage it is a challenge ...ave in common energetic technologies and their specific characteristics in risk management.
    34 KB (5,202 words) - 15:22, 16 November 2018
  • ...ablished for known possible risk. If a risk occurs, the project manager or risk owner(explained in the plan section) can take action fast and effective to ...alist within specific areas<ref name="PMIP"/>. Creating and populating the risk register tends to be an iterative process since new information can occur i
    17 KB (2,749 words) - 17:09, 16 November 2018
  • ...on, respond to challenges via generating ideas that can help in mitigating risk and uncertainty in a project or a program. This is extremely important as m
    21 KB (3,311 words) - 09:53, 4 February 2019
  • ...rate knowledge base for storing and retrieving information, which includes risk register, lesson learned, stakeholder register, past project files and hist ...up resulting in project delay or in cost overrun. It is considered to be a risk in most projects and is one of the most common causes of project failure.<r
    22 KB (3,424 words) - 15:37, 16 November 2018
  • ...r of users low to accelerate the decision-making process and eliminate the risk of any conflicts.<ref name="eight" />
    20 KB (2,933 words) - 18:49, 17 November 2018
  • ... various teams. Development of social crash or conflicts is consequently a risk that might have a big impact on the result and the integration. Conflict ma ...esign process, teams with divergent competence and experience appears. The risk of hiring teams with lower levels of competence will bring down the quality
    22 KB (3,313 words) - 08:59, 11 January 2019
  • ... well as transparent and clear for everyone involved otherwise, there is a risk of not delivering what intended. Examples of tools and methods that support
    23 KB (3,526 words) - 17:41, 16 November 2018
  • ... results of the BTRSPI, thereby letting it control their behaviour. People risk becoming completely defined by their team role. It is important to keep in
    23 KB (3,609 words) - 17:12, 16 November 2018
  • ... information from this book about different program management principles, risk management, leadership and stakeholder engagement.
    20 KB (3,474 words) - 06:48, 19 March 2022
  • *minimize risk originating from new projects ...terest of the principal and that agents and principals may differ in their risk attitudes. The bottom line is, that agents need to get incentives, be monit
    26 KB (3,691 words) - 17:19, 16 November 2018
  • ...information is vital. As more information is stored in the cloud, it is at risk of being accessed externally.
    15 KB (2,291 words) - 17:21, 16 November 2018
  • ...eferred to as Ansoff matrix, is a tool that provides information about the risk of growth/expansion in other markets <ref name="r"> ''Roberto Panizzolo, U
    27 KB (4,209 words) - 16:55, 16 November 2018
  • *'''Project risk evaluation'''. It can be determined what is the uncertainty about deviation '''Simon A. Burtonshaw-Gunn. "Risk and Financial Management in Construction." Gower Publishing Limited, 2009.'
    18 KB (2,744 words) - 17:21, 16 November 2018
  • ...sis to all three in an industrial project is to plan to fail. Uncertainty, risk and change is inevitable and the project manager has an ethical duty to und ...t with their organisation. This problem can be mitigated by publishing the risk management plan and be producing different planning scenarios for review.
    16 KB (2,525 words) - 15:34, 10 January 2019
  • ...can adapt rapidly to these unpredictable and changing requirements. First, risk is minimized when the team focuses on short iterations with clearly defined ... />. This can be a challenge, especially in larger organizations where the risk of getting interrupted is very high due to the number of employees. Scrum t
    25 KB (3,916 words) - 17:40, 16 November 2018
  • ...e the scope, and juggle with quality, budget, time schedule, resources and risk. <ref> Annex A1, 1996 ed. PMBOK® Guide </ref> ...f sessions, they will not appreciate that method of working, and you might risk that they don’t care later on in the different sessions. Also, if stakeho
    19 KB (3,049 words) - 17:22, 16 November 2018
  • ...ses such as schedule development, cost estimation, resource allocation and risk assessment. These levels are called ''Work Packages''. The official definit
    26 KB (3,999 words) - 21:56, 4 March 2019
  • ...Project managers are also able to identify risks and perform quantitiative risk analyses from the YC output data at it will identify procsses that not valu
    9 KB (1,253 words) - 15:11, 19 February 2018
  • ...ontracts with suppliers, Governmental, Institutional client, customer) and Risk Management Area, the forecasted information(indicators) after being proces ...mprehend the main difference between CAD models and BIM models besides the risk related to each method during the design phases.
    25 KB (3,945 words) - 17:30, 16 November 2018
  • ... Benefits, Customer Satisfaction and Risk. A successful project needs good risk management, ground rules for communication and behavior, and awareness arou ...'balance…competing demands of scope, time, cost, quality, resources, and risk''” (Page 37)<ref name="PMBOK">Project Management Institute, "A guide to t
    26 KB (3,892 words) - 17:04, 19 February 2018
  • ...ed to the project, but who has not exercised it in the past. This can be a risk if the stakeholder has drastically more power than expected or lately acqui ...cs within project management as project human recourse management, project risk management etc.
    16 KB (2,448 words) - 17:34, 16 November 2018
  • ====Risk Management==== ...risk management concept. A continuous approach is suggested, in which four risk management processes are introduced:<ref name="ICGBE"/>
    27 KB (3,813 words) - 15:34, 16 November 2018
  • ...should be managed and how the MBI tool that can be applied to mitigate the risk of conflicts. It will also include relevant theory regarding cultural manag ...ow how and what to identify in the multicultural team in order to mitigate risk of failure in the project.
    24 KB (3,708 words) - 17:05, 16 November 2018
  • When a change to baseline occurs, there is a potential risk that a team member will be negatively affected by the change. In a worst-ca
    31 KB (4,842 words) - 17:22, 16 November 2018
  • ...ld always be found within an organization if possible. Always identify the risk associated with any staff choice, as this person could be needed in another ...rces are used within the team. The more detailed the easier it is, to do a risk analysis of the project, both on cost and time. <ref name="A Guide to the P
    20 KB (3,218 words) - 17:40, 16 November 2018
  • *Manage project budget, scope, risk, resources, deadlines and quality. ...ustomer needs it, which is combined with waste in terms of inventory and a risk that the delivered value is obsolete once the customer actually needs the d
    21 KB (3,379 words) - 17:48, 16 November 2018
  • ...e undertaking any endeavour. <ref> Cline, Preston B. (2003) The Merging of Risk Analysis and Adventure Education, [Online] Available at: https://www.outdoo ...s for the number of customers there is; there might be none. Another major risk for start-ups competing in red-ocean markets is that a competitor will out-
    16 KB (2,524 words) - 17:42, 16 November 2018
  • ...ue for the company. A mean-variance analysis can be used when weighing the risk against expected return. As a Value Analysis has a high engineering cost th ...their strengths and weaknesses. This can be a time-consuming process and a risk is that decisions are made before they are fully evaluated.
    15 KB (2,402 words) - 17:44, 16 November 2018
  • ...n. In that case, a program manager may be well placed to accept calculated risk and then to clarify it in their own terms or to seek out such data from the ...ce <span class="plainlinks">[https://en.wikipedia.org/wiki/Risk_management Risk Management]</span>, Communication Management or <span class="plainlinks">[h
    25 KB (3,818 words) - 17:45, 16 November 2018
  • ...to overcome them. People with a high ''D'' are characterized as confident, risk willing, determined, result oriented and demanding. They focus on shaping t
    20 KB (2,926 words) - 17:20, 16 November 2018
  • ... ideal to take preventive measures, which can be achieved through applying risk management tools such as: “Failure Modes and Effects Analysis (FMEA)”. ...e consequences of this. The tool applies with the standards of Qualitative Risk Analysis defined by the PMBOK guide, which shortly can be summed up as a pr
    21 KB (3,316 words) - 17:46, 16 November 2018
  • ...entification in a project, program or portfolio lays the foundation of the risk analysis. It is therefore very important to identify as many possible risks The goal of brainstorming in risk identification is to gain a thorough list of risks. To gain a comprehensive
    2 KB (254 words) - 19:25, 12 February 2018
  • ...y are willing to invest into the prior-implementation study? If they are a risk takers or prefer to play it safe? Are they fast to decide or rather tend to ... cheaper than others. Disadvantages of this solution include the increased risk of subjectiveness influencing the outcomes of the study. Group members tend
    19 KB (3,094 words) - 17:46, 16 November 2018
  • ...itored and controlled by dedicated managers. The managers will observe the risk development, act if needed and update information for future use.
    2 KB (290 words) - 20:44, 12 February 2018
  • ...tive, outsourcing, and an in-house production will be weighed, introducing risk and benefits of both methods. When the needs have been determined a supplie *'''Risk Pooling:''' Suppliers reduce uncertainty through risk-pooling.
    21 KB (3,183 words) - 17:03, 16 November 2018
  • ... have never been done before <ref name="Gallagher"> Gallagher, S. “Time, risk, and innovation: creating space in your day to solve meaningful problems. ... settings, risks are inevitable. While many theories, tools, and models in risk management are to be applied for these types of settings, one “best way
    19 KB (2,871 words) - 01:30, 12 March 2019
  • ...rticle will give an overview of the planning, strategies and tools for the risk response process. The project benefits of addressing risks by their priorit = Plan risk responses =
    20 KB (3,103 words) - 17:45, 16 November 2018
  • *'''Risk and issue management''': It is important to keep under control the potentia ...ders involved throughout the development of the program, which reduces the risk of handing in results that don’t match their expectations.
    23 KB (3,453 words) - 17:47, 16 November 2018
  • ...nell, ''My management guide'',Defining Threats And Taking Opportunities By Risk Management Strategy.</ref>. ... USA, 2000.</ref>, thus, it is suggested than an opportunity is a positive risk.
    22 KB (3,414 words) - 17:31, 16 November 2018
  • ...uide to Project Management Body of Knowledge" (2013), 5th Edition: Project Risk Management </ref>These processes are Plan human resource management, Acquir ...uide to Project Management Body of Knowledge" (2013), 5th Edition: Project Risk Management (chapter 9) =====
    18 KB (2,980 words) - 17:47, 16 November 2018
  • ...of planning, as it clearly identifies the plan’s products and reduce the risk of important aspects being missed. It improves the communication as the pro ...dded as a number of cost for each. For the sake of simplicity, a cost of a risk could be labelled with red and an opportunity green. These are obviously di
    15 KB (2,471 words) - 17:49, 16 November 2018
  • ...h-quality data insight. However, if data quality is poor, project managers risk taking misguided decisions based on unreliable data. Data quality managemen ...ich could detrimentally influence a project outcome through poor ''project risk management'' - due to low-quality data.
    27 KB (3,985 words) - 17:14, 16 November 2018
  • Every project contains some form of risk. Risks and other potential issues that may happen in a project need to be t
    20 KB (3,120 words) - 17:41, 16 November 2018
  • ...res and successes of a project. The knowledge gained can lead to minimized risk by possibly optimizing and/or preventing mistakes in subsequent projects.
    26 KB (3,792 words) - 16:45, 16 November 2018
  • ... employees. At last but not least, PSD implemented correctly decreases the risk of delays, helps allocated resources, which may result in minimizing potent ...securing these activities to the possible extent, significantly decrease a risk of missing deadlines during a life of a project. In order to structure the
    22 KB (3,339 words) - 22:06, 28 February 2018
  • ...ks affecting a portfolio, one must work through four aspects of "Portfolio Risk Management". These aspects are identification, analysis, development respon ... Another type of iterative process occurs when the conditions of a certain risk change, forcing it to undergo all the phases again. When new risks occur al
    27 KB (4,134 words) - 15:20, 16 November 2018
  • ...sfaction, and Risk. Moreover, a successful project needs consistently good risk management, ground rules for communication and behavior, and awareness arou ...'balance…competing demands of scope, time, cost, quality, resources, and risk''” (Page 37)<ref name="PMBOK">Project Management Institute, "A guide to t
    28 KB (4,168 words) - 17:32, 16 November 2018
  • ...brainstorming, which is "more productive than individual thinking" (8.3.5, Risk management procedure, PRINCE2), however provides no specific tool or techni
    23 KB (3,484 words) - 17:31, 16 November 2018
  • ...to be consistently wrong over an extended period of time, it increases the risk of any project immensely.
    23 KB (3,500 words) - 13:22, 11 November 2018
  • ...r of users low to accelerate the decision-making process and eliminate the risk of any conflicts.<ref name="eight" />
    24 KB (3,471 words) - 15:30, 16 November 2018
  • 3. A project starts with a high amount of risk and uncertainty and run low during the ongoing life cycle. ...d be beneficial due to the minimization of changes. On the other hand, the risk of expensive changes in a later stage of the project are enormous and a mai
    18 KB (2,845 words) - 17:10, 16 November 2018
  • ...OK subject groups; Integration, stakeholder, scope, recourses, time, cost, risk, quality and procurement.
    3 KB (518 words) - 12:07, 26 February 2018
  • ...OK subject groups; Integration, stakeholder, scope, recourses, time, cost, risk, quality and procurement. ...mation associated to the identified risks which leads to the next input. ''Risk contract decision'' here the parts shall make different contracts including
    21 KB (3,480 words) - 15:31, 16 November 2018
  • ==== Risk subject group ====
    25 KB (3,713 words) - 17:35, 16 November 2018
  • ... employees. At last but not least, PSD implemented correctly decreases the risk of delays, helps allocated resources, which may result in minimizing potent ...securing these activities to the possible extent, significantly decrease a risk of missing deadlines during a life of a project. In order to structure the
    22 KB (3,389 words) - 15:07, 16 November 2018
  • ...ple undertaking projects with too optimistic expectations about budget and risk, which will most likely not be met. <ref name="Kahnemann"> Kahnemann, Dani ...lanners present their cases, they often brighten the numbers regarding the risk and the benefits of their projects. Regarding to Flyvbjerg, they are delibe
    25 KB (3,837 words) - 00:09, 14 November 2018
  • ...management. The process of risk quantification is an important step of the risk management process and therefore, important to ensuring the success of a pr ...ne about them" [http://pmtips.net/blog-new/defining-risk-management-part-4-risk-quantification]. </div><br />
    31 KB (4,700 words) - 00:13, 14 November 2018
  • * Levels of uncertainty (i.e. risk, uncertainty, ignorance) * Risk Identification([http://wiki.doing-projects.org/index.php/Risk_Identificatio
    31 KB (4,011 words) - 14:35, 29 July 2023
  • |[[Risk management in project portfolios]] |[[Risk-Reward Bubble Diagrams in Project Portfolio Prioritization]]
    3 KB (382 words) - 13:37, 8 February 2021
  • ==Risk== ...ith a better information organization, BIM 360 Field is able to reduce the risk associated to the AEC industry derived from errors like human transcription
    27 KB (4,169 words) - 18:54, 4 March 2019
  • ...y solving one problem, another one might arise and need attending. Another risk is the fact that the new resources that are added into crashing an activity
    16 KB (2,728 words) - 11:24, 4 March 2019
  • '''Option 2''' is meant to review only projects in the portfolio with high-risk value. It allows detecting possible emergency and uncertainty, therefore en
    22 KB (3,369 words) - 18:57, 4 March 2019
  • ...gns, that need to be managed. The aspects are costs, time, quality, scope, risk, and benefits. ; Project risk management
    23 KB (3,665 words) - 18:00, 2 March 2019
  • ...wn variables, due to the rapidly changing world and conditions. Therefore, risk management should not only focus on the prevention of a crisis, but also on ...design a crisis management plan before the project has started. During the risk assessment process, it should not only be planned how a crisis can be preve
    27 KB (4,214 words) - 20:34, 4 March 2019
  • ...nformation is gathered through existing data, surveys, data generated from risk management tools, cost estimations, etc. The amount and quality of indicato ...s'', which evaluates different possible outcomes. These are widely used in risk management <ref name="Performance Indicator"> Carol Taylor Fitz-Gibbon (199
    22 KB (3,466 words) - 12:14, 22 April 2019
  • ...w the Systems Theory is linked to the complexity of Project Management and Risk Management<ref name=can />.
    24 KB (3,691 words) - 21:51, 4 March 2019
  • ...ity management but also integration, scope, human resource, communication, risk and procurement management. The role of a project manager is designed in a ...st analysis, lessons learned, statement on the scope of project, CPM, CBA, Risk management and contract management.''
    20 KB (3,041 words) - 15:35, 2 March 2019
  • **'''Planning Fallacy''' - Unconsciously underestimating time, cost, and risk. **'''Ostrich Effect''' - Avoiding risk, failure or difficult situations missing out on important lesson leading to
    5 KB (655 words) - 13:55, 21 April 2019
  • ...), but for intangible value (brand awareness, organization’s reputation, risk exposure, compliance, and social value) the evaluation is more difficult. <
    21 KB (3,407 words) - 22:45, 4 March 2019
  • ...e organization proceeds directly from starting up a project ...then it may risk committing significant financial resources to a project without fully under ... developing sufficient strategic information with which owners can address risk and decide to commit resources to maximise the chance for a succesful proje
    26 KB (3,756 words) - 21:03, 4 March 2019
  • The risk complexity occurs from a high level of uncertainty, which often come from l
    18 KB (3,035 words) - 07:45, 30 April 2019
  • ...nowledge and systematic tools, not only in project management, but also in risk management, a discipline that has a special complexity in construction proj ... scope, schedule, cost and risk. With the first three constraints defined, risk is the last but not least constraint remaining, and it is certainly the one
    23 KB (3,556 words) - 18:56, 3 March 2019
  • #REDIRECT [[A Guide to Risk Management in Construction Projects]]
    65 B (9 words) - 20:00, 13 February 2019
  • * risk,
    24 KB (3,740 words) - 11:47, 4 March 2019
  • ...ble model. It is just a matter of how specific you define you project. The risk is of course if you are an inexperienced project manager it can be hard to
    25 KB (4,021 words) - 15:46, 4 March 2019
  • ...a group through group think, and although Planning Poker helps remove this risk, teams suffering from group or organisation pressure can become blind to th ...rules are followed. If Planning Poker is not held in a structured way, you risk that some members of the team keep their estimates and opinions to themselv
    23 KB (3,777 words) - 16:12, 4 March 2019
  • ...a project from others. Unfortunately, every project comes with a potential risk of failure.<ref name="(Axelos, 2017)"></ref> Due to fast pace of change and
    27 KB (4,201 words) - 21:30, 3 March 2019
  • "risk" -Noun “A situation involving exposure to danger” ...re is a potential risk, regardless of the size, however, the chance of the risk being a problem can be mitigated.
    12 KB (1,934 words) - 09:18, 1 March 2019
  • ...g timely actions towards certain "urgent" KPI indications. This particular risk is however, lower in the case of project managers when they are solely resp ...ionally, intangible KPIs for e.g. KPIs focused at a strategic level are at risk of being misinterpreted where there is a lack of simple,lucid objectives an
    24 KB (3,667 words) - 22:40, 4 March 2019
  • ...sures that the solution will be well fitted to the problem and reduces the risk associated with launching new ideas, product lines and conducting novel pro
    18 KB (3,033 words) - 11:31, 3 March 2019
  • In addition, as all the other time management tools, there is the risk that focusing too much on the methods itself can prevent the user to actual This is connected to a broader risk that all self-improvement techniques can lead to: the desperate seeking of
    28 KB (4,350 words) - 16:27, 19 May 2019
  • As anything else, there’s a risk involved whit doing this. Meaning that, the picture painted by the models, Another possible risk to always keep in mind while using payment milestones<ref name=Milestone></
    21 KB (3,634 words) - 18:58, 4 March 2019
  • ...be measured within project scope, scheduling, cost, quality, resource, and risk constraints in term of completing the project <ref name=aircraft> Arin Wula
    26 KB (4,160 words) - 13:41, 2 March 2019
  • ...d under the performance targets: Time, cost, quality, scope, benefits, and risk, on which a project is evaluated. If a project is managed poorly or lack pr ...l as determining a budget and the quality of the product. As no project is risk-free, it is important for the project manager to identify Issues and risks
    26 KB (4,073 words) - 17:27, 3 March 2019
  • ...ial parts of a project (tasks, objectives, timeline, cost and owners) plus risk and quality ...he team a clear overview of the project timeline, the scope, the different risk and the cost. So the idea is that you break down the project, so it fits in
    21 KB (3,637 words) - 08:07, 2 May 2019
  • ...up, while multiproject management ensures a top-down ressource management, risk balancing etc. <ref name = maniak2014 />. The combination of buttom up and ...m performance after a future rationalization project, there is a potential risk of the differentiation between the two, being too high. This would mean tha
    21 KB (3,360 words) - 14:24, 4 March 2019
  • ...ted through the use of a multi-party agreement in which there are a shared risk/reward pool and no traditional financial cost guarantees. ...ith at least two other parties and yet retains ultimate accountability and risk for decision-making and the project outcome.
    34 KB (4,961 words) - 22:00, 4 March 2019
  • ... /> Governance framework refers to the four governance domains; alignment, risk, performance, and communication, with functions; oversight, control, integr *Decision-making regarding risk escalations, changes, and resources
    24 KB (3,483 words) - 18:05, 4 March 2019
  • ...ers as “Shortened product development (Time-to-market)” and “Reduced risk for the product (eg. Technical feasibility, project failure)"<ref name=''Sc
    24 KB (3,885 words) - 07:19, 3 March 2019
  • ...ng can assist to develop communication strategies in order to minimise the risk of a communication error or misunderstanding. A Communications Management P
    23 KB (3,394 words) - 11:52, 5 March 2019
  • ...ality and completion are the basis of project consequences, in the form of risk and reward, for the involved contract participants. The concept of KPIs wil ...<ref name="SSBM">Seven Sourcing Business Models to Create Value and Manage Risk </ref>
    20 KB (3,198 words) - 21:22, 4 March 2019
  • ... distribution as well as activities around cost, procurement, quality, and risk.
    14 KB (1,857 words) - 22:34, 4 March 2019
  • ...h for coordination, planning, scheduling, overseeing in the execution, and risk management.<ref name="drugDevelop"/> ...the market and the stringent regulatory requirements they have to take the risk of running multiple products-development projects in parallel, making the m
    24 KB (3,660 words) - 16:32, 3 March 2019
  • * minimizing risk while at the same time maximizing the opportunity to gain additional benefi * Risk assessment and probabilities for realizing each benefit
    34 KB (5,032 words) - 19:53, 4 March 2019
  • *'''Risks:''' State possible risk that might lead to a failure of the project.
    20 KB (3,236 words) - 11:39, 8 May 2019
  • ... has six types of tolerance; ''time, cost, quality, scope, benefit'' and ''risk.'' These factors have to be monitored and reported throughout the project. ...ving consistent reporting, proactive actions can be taken to an unexpected risk and issues that can affect the project health such as cost, time schedule,
    21 KB (3,179 words) - 19:18, 2 March 2019
  • ...insurance companies, pension funds, corporations, charities) and balancing risk against performance. Portfolio management, implies in tactfully managing an ...l be extended explanation for Project risk management versus the financial risk management.
    21 KB (3,090 words) - 21:12, 4 March 2019
  • ...al - traditional model of investments into new solutions fail to provide a risk free experience. On the other hand, Lean-Agile development offers safe mode
    25 KB (4,038 words) - 11:58, 11 February 2021
  • ...role of sponsor by linking it strongly with principals such us leadership, risk-taking and strategy planning. ...ween both sites. Thus, Project sponsorship is also strongly connected with risk identification.
    21 KB (3,053 words) - 20:29, 4 March 2019
  • ...asted costs to the estimated and budgeted costs. In cases where there is a risk of overrun of the budget, it can be automatically spotted and dealt with ea
    17 KB (2,830 words) - 20:07, 4 March 2019
  • ...fining performance tolerances by: cost, time, quality, scope, benefits and risk. Exceeded tolerances are defined as an exception and upper management will | Risk || Plans on how to manage risk || What if?
    25 KB (3,629 words) - 22:32, 4 March 2019
  • ... PDCA in a project will be suggested.<ref name=QMS/> General principles of risk-based thinking will be explained and why it is important to include in the ...tion including a described method of performing risk management. <ref name=Risk>Dansk Standard. [https://webshop.ds.dk/Default.aspx?ID=120&GroupID=03.100.0
    24 KB (3,763 words) - 21:23, 4 March 2019
  • ...project manager particularly in regard to; harnessing complexity, reducing risk, and communicating effectively with stakeholders and the project team. ...ltiple documents with different approaches, can be distilled to: reducing risk, harnessing complexity and increasing effectiveness in communication with s
    21 KB (3,140 words) - 23:01, 4 March 2019
  • ...ce you into creating clear and defining objectives and goals. This reduces risk of setting unclear objectives that are unlikely to be accomplished.
    18 KB (2,925 words) - 22:44, 4 March 2019
  • <ref name="decmatrix">Axelrod, A. (2009) ''RISK: The Decision Matrix: Strategies That Win'', Sterling. ISBN 13: 97814027541
    20 KB (3,107 words) - 13:21, 12 March 2019
  • With the model being clear and easy to follow, the risk of misunderstandings is reduced. [2]. Misunderstandings can be time consum
    15 KB (2,531 words) - 23:26, 4 March 2019
  • ...neering deals with. It deals with work-processes, optimization methods and risk management. It is a methodology where the customers’ needs, and functiona ...even steps, design and development, validation and operation, quantitative risk assessment, is gone through stage by stage. The focus through these phases
    18 KB (2,733 words) - 22:47, 4 March 2019
  • The Innovators are often the risk takers in the society, and do not need much convincing when they see a chan ...e in human behavior changed the whole company from within. As every safety risk was reported by individuals to their responsible leader, it started a pyram
    16 KB (2,710 words) - 22:57, 4 March 2019
  • ...hing between them being a single acrylic panel that suddenly is at serious risk of breaking effectively threatening thousands of lives. - Situation: The project met a crisis involving some very high-risk aspects (large water body, critical location, ground-breaking acrylic techn
    48 KB (6,651 words) - 21:57, 1 March 2019
  • ...niques are used by them, like decision milestones to be expected outcomes, risk management for prevention of disasters and some of them uses computational ...posed to be related to Risk Management. Though, the key management tool is Risk Log/Register. It is a log sheet of identified risks, including results of a
    13 KB (2,135 words) - 15:32, 3 March 2019
  • ... it down, this method has been sufficiently determined as a combination of risk assessment, character and performance checks involving the third parties re ...ciently with the borrower <ref name="four">https://www.protiviti.com/UK-en/risk-and-compliance/portfolio-and-lender-due-diligence</ref>?
    19 KB (2,792 words) - 22:58, 4 March 2019
  • ...flict must be known in order to solve the problem optimally and reduce the risk of the conflict reoccuring<ref name="DeJanasz"/>. While efforts can be put forth to lessen the risk of conflict, it cannot be prevented that some conflict will arise. Thus the
    24 KB (3,806 words) - 13:13, 6 March 2019
  • ...prerequisites, in terms of security systems, in order to avoid any kind of risk. ...> "https://www.theirm.org/the-risk-profession/risk-management.aspx"/"About Risk Management" </ref>
    23 KB (3,418 words) - 22:52, 4 March 2019
  • ...ectations. In companies that are more innovative and entrepreneurial, high risk proposals are more likely to be accepted, and vice versa for conservative o
    18 KB (2,747 words) - 13:07, 27 February 2019
  • ...nt is the deliverable from the developed CoS. With this step the potential risk, obstacles, and assumptions are identified.
    8 KB (1,141 words) - 11:43, 5 March 2019
  • ...exchange such advantages as delivery time, quality, reasonable price, less risk of theft. Many people, however, are reluctant to live in a prefabricated ho
    17 KB (2,486 words) - 08:35, 26 February 2019
  • '''7. Risk identification and responding measurements''' Risk identification is a very important action which asks manager to have consid
    21 KB (3,169 words) - 12:18, 4 March 2019
  • ...ive risk brings undesirable result which is called threat and the positive risk is called opportunities.
    6 KB (992 words) - 19:14, 22 February 2019
  • ..., summary milestones, costs, pre-approved financial resources and also the risk assessment which is attached to the project which is vital for the survival ...cument is an overview of the whole project. That is the time schedule, the risk associated with different parts of the projects, who are the stakeholders a
    23 KB (3,548 words) - 11:57, 5 March 2019
  • ...ategic value, knowledge-intensive, and commonly made iteratively to manage risk and complexity. ... depending on the maturity of a company’s NPI process and the complexity/risk behind the product being introduced, the Stage Gate process can fall into v
    24 KB (3,774 words) - 16:24, 4 March 2019
  • ...documents, such as activity lists, activity attributes, milestone list and risk register. 

    20 KB (2,936 words) - 18:29, 4 March 2019
  • There are three main causes of this extra risk. The first being the increasing complexity of client needs and technologica *Determining risk and crisis control procedures
    28 KB (4,023 words) - 16:55, 4 March 2019
  • .... This is a critical mistake that puts projects and whole organizations at risk. Not being included in the decision process and being treated as passive re
    38 KB (5,661 words) - 20:09, 4 March 2019
  • ...rojects not being constantly monitored and assessed with focus on benefit, risk, and alignment with the overall strategy of the enterprise tend to fall sho ... company’s delivery organization and the uncertainty is transformed into risk management, i.e. time and expenditures.
    24 KB (3,629 words) - 19:27, 4 March 2019
  • ...ership, tend to be in a positive mood, and are comfortable taking moderate risk.” <ref name=D></ref>
    26 KB (4,080 words) - 21:38, 4 March 2019
  • ...exchange such advantages as delivery time, quality, reasonable price, less risk of theft. Many people, however, are reluctant to live in a prefabricated ho
    26 KB (3,810 words) - 11:32, 3 March 2019
  • * minimizing risk while at the same time maximizing the opportunity to gain additional benefi * Risk assessment and probabilities for realizing each benefit
    34 KB (5,032 words) - 19:55, 4 March 2019
  • ...es to a project failure. PRiSM was developed on the basis of the classical risk management process, which include the following four steps, as presented in ::The PRiSM Model is used as a tool that simplifies the process of risk identification. This includes positive risks (opportunities) and negative r
    18 KB (2,760 words) - 13:36, 25 April 2019
  • ...h for coordination, planning, scheduling, overseeing in the execution, and risk management.<ref name="drugDevelop"/> ...the market and the stringent regulatory requirements they have to take the risk of running multiple products-development projects in parallel, making the m
    25 KB (3,831 words) - 20:24, 3 March 2019
  • ...ive risk brings undesirable result which is called threat and the positive risk is called opportunities. ...t takes in to account internal and external factors and consider potential risk which may occur during project realization. After Benefits identification t
    16 KB (2,514 words) - 16:36, 4 March 2019
  • ...dule back in track, this makes PERT/CPM an attractive choice when there is risk, since Gantt charts basically have to be generated from scratch each time t
    16 KB (2,620 words) - 13:13, 4 March 2019
  • ...asted costs to the estimated and budgeted costs. In cases where there is a risk of overrun of the budget, it can be automatically spotted and dealt with ea ...ral years. The third limitation is the unknown unknowns. There is always a risk, that something unforeseen will happen. Something that could not have been
    20 KB (3,261 words) - 22:22, 4 March 2019
  • ...ollowed without such high level of consciousness, the project is at a high risk of shut down (by the governance board, due to mismanagement) or in other wa On the other hand, a demotivated project team increases the risk of conflicts, stress, budget and timeframe overruns and generally jeopardiz
    20 KB (3,142 words) - 21:20, 4 March 2019
  • ...nts should be established. Examples of areas such practices may cover are: Risk and Issue Management, Quality Management and, Schedule Management . ...ining the link between deliverables and desired benefit, thus minimize the risk of failing due to the second main cause.
    28 KB (4,285 words) - 21:21, 20 March 2019
  • ... Important tasks require initiative and proactiveness. Strategic thinking, risk analysis, roadmap creation, brainstorming, communication, and making sound ...s, carefully planning work that aligns with long-term goals while taking a risk and other factors into account will involve less crisis creating a self-per
    25 KB (3,879 words) - 18:28, 7 May 2022
  • #*1.Phasing: presenting the solution for a small audience, to avoid risk before a full-scale presentation.
    14 KB (2,317 words) - 19:26, 22 March 2022
  • ...sic Motivation: How to Pick Up Healthy Motivation Techniques</ref> I would risk to say that intrinsic motivation is crucial in every today's workplace. Man * Security – employees should not be under the constant pressure of the risk of dismissal
    27 KB (4,161 words) - 19:56, 22 March 2022
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]] | style="text-align: center; background-color:#ffffff;" | [[Risk and Issue Management Resources]]
    10 KB (1,219 words) - 09:09, 22 March 2020
  • ...isk Management''' deals with the identification, assessment and control of risk in a project, in order to decrease the uncertainty and increase the project [[Risk Management Resources]]
    5 KB (550 words) - 11:03, 15 March 2020
  • '''Risk and Issue Management''' helps the company dealing with complexity, uncertai [[Risk and Issue Management Resources]]
    4 KB (449 words) - 10:03, 26 March 2020
  • ...g of risk is to exploit the opportunities and avoid the threats. Portfolio Risk Management is to make sure all the components, strategy, business plan and [[Portfolio Risk Management Resources]]
    4 KB (514 words) - 08:52, 9 April 2020
  • ...ct portfolio management. [[File:Bubble_diagram_example.png|thumb|Figure 4: Risk\Reward bubble diagram - Made by TeamSted]] The most common type of bubble chart is a Risk-Reward chart showing the Net Present Value(NPV) relative to the probability
    28 KB (4,321 words) - 07:27, 10 March 2020
  • ==Risk assessment== ...le risk management we can take a 3-step approach for assessing the project risk.
    8 KB (1,232 words) - 09:27, 4 March 2020
  • ...p to around 90%. To conclude the main principle with CCPM is to remove the risk of delays, speed up projects and improve the predictability and instead hav ... from controlling time and cost, Project Control is also useful to control risk, quality, and scope.
    20 KB (3,253 words) - 17:28, 8 March 2020
  • =='''Portfolio Risk Management Process'''== ...ement process is a process that a manager must work through to control the risk that may affect the portfolio. The outcome of this process is a solid strat
    28 KB (4,232 words) - 08:06, 11 May 2020
  • ...he necessary cost, benefits but also expected dis-benefits and appropriate risk management and a valuable timescale <ref name="Msp" />. ...consist of a resource management plan, communication management plan and a risk management plan.
    41 KB (6,512 words) - 12:41, 6 March 2020
  • The last one include the tools used to manage risk and change in the project. ... arises, it is also important to define the possible positive and negative risk related to the identified benefits. To give examples of these risks, they m
    22 KB (3,451 words) - 10:47, 9 March 2020
  • '''Risk Management in Project Portfolios'''<br /> Project Risk management enables an organization to reduce the probability of uncertain a
    17 KB (2,578 words) - 10:53, 9 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    5 KB (644 words) - 08:17, 3 March 2020
  • ...ed parameter to each of them. By doing so, predictability is increased and risk reduced leading to a better outcome.
    23 KB (3,317 words) - 19:55, 7 March 2020
  • ...ures and help make a contingency plan for minimizing and even avoiding the risk associated with the project. - '''The risk priority number''' is ranking the potential failures in the order they shou
    9 KB (1,427 words) - 09:05, 10 March 2020
  • Using this triangular distribution estimation uncertainty and risk can be reduced with respect to single-point estimating. Total project durat
    18 KB (2,586 words) - 08:35, 9 March 2020
  • ...ainty analysis. It is necessary to identify all possible risks and develop risk management by focusing attention where needed. It is also important to spec ... of occurrence of each risk, evaluate their impact and develop the overall risk situation. The project management team has to prioritize the risks several
    20 KB (3,180 words) - 09:58, 12 May 2020
  • ===Risk Management=== Risk Management is a structured process that helps managers to react to uncertai
    19 KB (2,850 words) - 13:46, 9 March 2020
  • Some limitations for the project charter are risks, an elaborate risk analysis is recommended in extension to the charter. Secondly, if the proje
    21 KB (3,308 words) - 07:42, 10 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    4 KB (487 words) - 08:17, 3 March 2020
  • ...doing-projects.org/index.php/Work_Breakdown_Structure</ref>, refinement of risk management, and finalization of cost budget. ...the cost and time. However the controlling also involves the monitoring of risk and changes. <ref>DS/ISO 21500:2013 Danish Standards </ref>
    20 KB (2,954 words) - 10:46, 8 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    5 KB (625 words) - 08:17, 3 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    5 KB (583 words) - 08:17, 3 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    5 KB (597 words) - 08:18, 3 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    4 KB (517 words) - 08:15, 3 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    5 KB (617 words) - 17:02, 6 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    5 KB (610 words) - 10:36, 8 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    5 KB (614 words) - 11:02, 9 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    5 KB (631 words) - 10:10, 9 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    5 KB (635 words) - 09:31, 8 March 2020
  • '''Title: Impact and Probability in Risk Assessment''' ...ty of occurring. After having introduced the components, it introduces the risk assessment methods using these two elements, taking into account both the q
    5 KB (615 words) - 11:11, 13 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk Management Resources]]
    5 KB (599 words) - 10:43, 17 March 2020
  • ...roadmap, taking also in consideration the environmental assessment and the risk management strategy. | style="text-align: center; background-color:#ffffff;" | [[Risk and Issue Management Resources]]
    5 KB (605 words) - 09:08, 22 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk and Issue Management Resources]]
    3 KB (313 words) - 08:57, 23 February 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk and Issue Management Resources]]
    5 KB (584 words) - 09:08, 22 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk and Issue Management Resources]]
    5 KB (575 words) - 09:11, 22 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk and Issue Management Resources]]
    3 KB (310 words) - 08:58, 20 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk and Issue Management Resources]]
    5 KB (577 words) - 09:46, 22 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk and Issue Management Resources]]
    4 KB (551 words) - 10:51, 24 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Risk and Issue Management Resources]]
    5 KB (640 words) - 09:30, 26 March 2020
  • '''Title: Risk and Issue Management - Managing Successful Programmes''' ... of control change and configuration management. Finally, it describes how risk and issue management evolve during the different stages of a program.
    5 KB (615 words) - 10:19, 26 March 2020
  • ...io strategic objectives and how to develop them, it explains the strategic risk appetite and it provides tool such as the portfolio charter and roadmap. Fu | style="text-align: center; background-color:#ffffff;" | [[Portfolio Risk Management Resources]]
    4 KB (482 words) - 07:40, 28 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Portfolio Risk Management Resources]]
    4 KB (430 words) - 08:34, 31 March 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Portfolio Risk Management Resources]]
    4 KB (422 words) - 10:12, 1 April 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Portfolio Risk Management Resources]]
    3 KB (339 words) - 14:19, 2 April 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Portfolio Risk Management Resources]]
    4 KB (413 words) - 09:29, 8 April 2020
  • | style="text-align: center; background-color:#ffffff;" | [[Portfolio Risk Management Resources]]
    4 KB (453 words) - 09:56, 7 April 2020
  • =='''Title: Portfolio Risk Management - The Standard for Portfolio Management '''== ...the chapter provides a portfolio risk management framework and a portfolio risk management plan.
    4 KB (503 words) - 09:14, 9 April 2020
  • ...t success in TVD projects, a shared risk contract should be used. A shared risk contract should at least include the client, principal designer and princip In case where organization may be prohibited to sign shared risk contracts – company/government policy etc. The client should instead crea
    21 KB (3,432 words) - 16:30, 8 March 2020
  • ... operations, based upon a informed judgment. Therefor by evaluating value, risk, benefits and other business factors, decision makers can prioritize candid Risk vs. Reward,
    20 KB (3,035 words) - 17:59, 5 May 2020
  • When defining a business case it is necessary to define the schedule, risk, resources, budget, quality and scope. These five main areas define the cal ... proper study to be able to make the best decisions and be fully informed. Risk management, SWOT analysis and the decision tree are very powerful to obtain
    14 KB (2,195 words) - 20:28, 8 March 2020
  • ...d with organizational strategy, portfolio governance management, portfolio risk management, and portfolio performance management. ==== 7. The risk management plan ====
    12 KB (1,839 words) - 12:54, 8 March 2020
  • = Risk Matrix = A risk matrix is an effective and broadly used risk assessment tool. It is quite quick to create, and it is an easy way to iden
    33 KB (4,802 words) - 16:17, 9 March 2020
  • ...ect, inform the different stakeholders and investors and handle the work-, risk- and resources-flow as the project proceeds.[2][3] ...rything can still go wrong. The overview provides a good opportunity to do risk analysis on the project in details. It is also a good way to keep track of
    15 KB (2,615 words) - 21:17, 22 March 2022
  • |[[Risk Management-Identification]] |[[Risk Register analysis]]
    13 KB (1,759 words) - 08:25, 20 February 2023
  • ...actors to keep in mind when designing the project in order to minimise the risk of social loafing, according to Gil (2004), are the ones related to the tas ... to a real world project and thus, it is not possible to state whether the risk of social loafing is present in every imaginable task. Some tasks or settin
    26 KB (4,063 words) - 22:07, 8 May 2023
  • # '''Managing Risk''' <br /> Uncertainties is a big part of projects. The objective of a proje ==== Risk management <ref> http://wiki.doing-projects.org/index.php/Risk_and_Opportun
    26 KB (4,256 words) - 17:32, 12 March 2022
  • ...o Simulations for Cost Estimation" (risks in project -> risk management -> risk assessment -> quantitative methods -> Monte Carlo simulation -> Monte Carlo ... with risk identification, risk analysis, risk evaluation, risk treatment, risk monitoring in the context of project, program and/or portfolio management.
    2 KB (267 words) - 17:58, 28 January 2021
  • ...is<br> e. Brainstorming<br> f. Risk register<br> g. Risk assessment<br> h. Risk treatment<br> i. Contingency plans
    6 KB (954 words) - 22:00, 31 January 2021
  • ...o Simulations for Cost Estimation" (risks in project -> risk management -> risk assessment -> quantitative methods -> Monte Carlo simulation -> Monte Carlo ...Epistemic_vs._Aleatory_uncertainty])<br> '''c. Levels of uncertainty (i.e. risk, uncertainty, ignorance)'''
    13 KB (1,824 words) - 14:09, 10 February 2023
  • ... maximization. Therefore, it can find the most appropriate balance between risk, quality, length, and cost. Moreover, using network planning in project man ...proach and the use of PERT are suggested to represent better the effect of risk and uncertainty on a project and improve the reliability of the forecasts <
    24 KB (3,668 words) - 19:10, 27 February 2021
  • *Project Management Institute, Inc. (PMI) (2019): The Standard for Risk Management in Portfolios, Programs, and Projects ...ss—may occur with impacts on project, program, and portfolio objectives. Risk Management processes allow for the consideration of events that may or may
    26 KB (3,715 words) - 15:14, 24 February 2021
  • ...ure. A dynamic, disciplined and scientific approach to experimentation and risk taking is established to facilitate organizational learning from success an *Risk/reward balance
    34 KB (5,230 words) - 15:14, 27 February 2021
  • ...gement is driven by the benefits, planning, delivering and controlling the risk and the project within the boundaries identified for time, cost, quality an ... to control the complexity of a project only through the three pillars, as risk is a large part of project management. Uncertainties through the project wi
    26 KB (4,136 words) - 17:28, 21 February 2021
  • ... listener will also pick up the subtle issues that may help to address the risk or to take advantage of an opportunity.”''</blockquote>
    23 KB (3,585 words) - 16:15, 24 February 2021
  • ... areas (Integration, Scope, Time, Cost, Quality, Resources, Communication, Risk, Procurement and Stakeholders) and 5 process groups (Initiation, Planning,
    22 KB (3,478 words) - 14:13, 28 February 2021
  • ...des six variables - time, cost, resource availability, scope, quality, and risk. The constraints clearly show that it is closely related to the iron triang ...e, cost, and scope by adding quality (as a separate factor), benefits, and risk resulting in a total of six constraints.<ref name="sixconstraints">Siegelau
    27 KB (4,158 words) - 19:24, 28 February 2021
  • ...name=eleven>Project Management Institute, Inc. (PMI). (2019). Standard for Risk Management in Portfolios, Programs, and Projects. (pp. 27). Project Managem ...app.knovel.com/hotlink/toc/id:kpSRMPPP01/standard-risk-management/standard-risk-management
    27 KB (4,200 words) - 15:46, 27 February 2021
  • ... final outcome of the project. If you are affected by the halo effect, you risk that your decisions are based on the wrong parameters. ...s/engineering/risk-matrix </ref>, '''Risk Wheel''' <ref> Five steps of the risk wheel figure by Evangelia Krassadaki. Retrieved at
    26 KB (4,178 words) - 17:05, 28 February 2021
  • ...tion and the higher the number of projects and portfolios, the greater the risk of losing clarity. In addition, conflicts of objectives arise between proje |Risk Averse
    26 KB (4,120 words) - 09:16, 28 February 2021
  • ...reats and opportunities and their impact as an individual or overall risk. Risk identification for projects, programmes or portfolios must be treated as an ...early stages of risk management and a necessity in order to pursue further risk management actions and prevent a negative impact on the projects’ success
    20 KB (3,002 words) - 21:29, 28 February 2021
  • ...Body of Knowledge (PMBOK® Guide)', 6th Edition. </ref>. While appropriate risk management is an essential pillar to identify, assess, and control uncertai
    29 KB (4,472 words) - 20:34, 28 February 2021
  • ... management processes such as estimating, scheduling, resource allocation, risk analysis, and measurement and control of the project.<ref name="R1" /> ...ect schedule and/or budget without first creating a WBS, they increase the risk of producing unsubstantiated and inaccurate schedules and budgets because t
    19 KB (3,005 words) - 18:11, 28 February 2021
  • #evaluation of the risk; | Replaced by risk-based thinking and improvement.
    30 KB (4,393 words) - 16:10, 21 June 2021
  • ... [http://wiki.doing-projects.org/index.php/Risk_Quantification_and_Methods Risk Quantification and Methods]. <!-- ...ted benefits. Additionally, contingency plans should also be developed and risk management strategies should be analyzed.<ref name="HM"/><ref name="BetterB
    39 KB (5,964 words) - 18:22, 28 February 2021
  • ...ing this communication tool <ref name="Joanie" />. Furthermore, there is a risk that project managers take the easy way out and avoid conflicts. That is no
    26 KB (3,884 words) - 18:26, 28 February 2021
  • ...is a very important factor in project management, specifically in cost and risk assessments. Cognitive Bias also includes other topics such as Gender Bias, ...ombining Reference Class Forecasting with Overconfidence Theory for Better Risk Assessment of Transport Infrastructure. ''The European Journal of Transport
    36 KB (5,384 words) - 23:10, 27 February 2021
  • ...2021.</ref>.It is possible that by reducing the Hidden Area of a team, the risk of confusion and misunderstanding between team members decrease as their co
    32 KB (5,062 words) - 10:53, 27 February 2021
  • ...ne of the investigated statements can be deemed truly SMART, revealing the risk that organizations relying too heavily on templates to guide them will fail
    44 KB (6,715 words) - 12:02, 28 February 2021
  • ...ver, most people find that when their personal benefit is high enough, the risk is less <ref name="slovic2007"/>. Therefore, it is essential to know what l ...app.knovel.com/hotlink/toc/id:kpSRMPPP01/standard-risk-management/standard-risk-management</ref>.
    26 KB (4,089 words) - 08:26, 16 March 2021
  • ...nnecessary long, which results in inefficiency due to Parkinson's Law. The risk of using durations from a project affected by Parkinson's Law is also likel ...tic, but tight deadlines. By having contingency reserves, efficiency is at risk.
    24 KB (3,651 words) - 10:32, 10 January 2022
  • ...s will reduce the duration of an activity. Crashing may result in a higher risk<ref name="PMBOK" />.
    20 KB (3,397 words) - 14:52, 28 February 2021
  • From the quote, it can be read that ambitious goal comes with the risk of not meeting goals. To facilitate aiming high and creating ambitious goal
    29 KB (4,699 words) - 22:55, 28 February 2021
  • |Construction Management at Risk ... The construction manager acts as a consultant to the owner, and bears the risk of meeting deadlines and budget of the project.
    27 KB (3,877 words) - 09:41, 1 June 2021
  • The classic risk management process is risk identification, assessment, treatment, and control.  Contingency plans are about how to deal with the risk, threats or, events.
    18 KB (2,990 words) - 13:31, 28 February 2021
  • ...he critical path. When applying crashing the project manager increases the risk of the project due to the addition of cost. ...ivities due to the overlap fast tracking introduces. Alongside this higher risk, the cost will also increase with the amount of workers going up. .
    28 KB (4,389 words) - 16:14, 26 February 2021
  • to talk about advanced implementations of Gantt Charts and risk management in
    19 KB (3,025 words) - 10:25, 5 April 2023
  • ...lt at this point?” or “do we have to rethink our anticipated budget or risk management and is this project relevant anymore?" Those questions are an es
    28 KB (4,527 words) - 14:44, 28 February 2021
  • ... management decisions. When trying to describe the dynamics when assessing risk and reward, the lack of understanding the underlying rationale comes to min ...name="risk">Project Management Institute, Inc. (PMI). (2019)."Standard for Risk Management in Portfolios, Programs, and Projects". Project Management Insti
    19 KB (2,955 words) - 21:35, 27 February 2021
  • ...makes people think that the future is bright, and therefore doesn’t take risk into consideration. System 1 is the prime influence in the illusion of cont ...r does not favor any specific stakeholder, if presenting and reporting the risk consistently throughout the project.
    19 KB (3,003 words) - 11:30, 27 February 2021
  • ...nt and tight in the back. The remaining work pressure is very high and the risk is high. The two situations have different impacts on the later stage of th
    24 KB (3,702 words) - 11:20, 26 February 2021
  • ...nclude management practices such as balancing the iron triangle, assessing risk and engaging with stakeholders. Another common thing for projects is that i
    25 KB (3,824 words) - 12:49, 12 March 2021
  • ...ude planning and organizing, control, rule-following, technical knowledge, risk management, and adaptability. Good management tends to lead to good structu ...s. On the other side, there can easily be a lack of structure, unnecessary risk-taking, and sometimes difficulties in the execution of their vision.
    21 KB (3,171 words) - 16:54, 9 May 2023
  • ... manager’s table. If the scope of the need has a substantial size and/or risk profile it will be send through the organization project system and a proje ..., and it is therefore difficult to make a set of generalizing rules. Also, risk profile is a crucial factor regarding larger projects, but when dealing wit
    20 KB (3,245 words) - 21:51, 28 February 2021
  • ...es as a project manager, either having to prevent or repair the individual risk. Obvious consequences, such as stakeholders being unhappy about the project • Predict future behavior and thereby reduce the risk for failure
    14 KB (2,145 words) - 20:15, 28 February 2021

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

Personal tools
Namespaces

Variants
Views
Actions
Navigation
Toolbox